34-013-20826

Well Details

Well ID: 34-013-20826
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Somerset Township
Operator Name: GULFPORT ENERGY CORPORATION
Well Pad ID: US-OH-001085
Farm/Lease Name: MCLAUGHLIN 210168
License Status: Final Restoration
License Date: 2015-03-25
Spud Date: 2014-08-01
Spud Drilling Contractor:
Final Drill Date: 2014-09-28
Well Total Depth: 2282.00 ft
Configuration: Horizontal
Latitude: 39.900000
Longitude: -81.200000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-07-31 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:7/31/2014, Expired Date:7/30/2016 12:00:00 PM, Drilling unit acres:318.91, Proposed Well Type:OG, Proposed Well Class:POOL
Plugged/Abandoned 2014-09-28
Reached Total Depth 2014-09-28
APP 2015-03-25 Proposed Formations:, Issued Date:3/25/2015, Expired Date:3/24/2017 12:00:00 PM, Drilling unit acres:318.91, Proposed Well Type:OG, Proposed Well Class:
Construction Permit Expires 2017-03-24
Completion Report Received 2018-10-17
Record Last Modified 2018-10-18

For data sources see[2]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1594832029 2015-1-20 0:00: PL No Violations 1.00
-1713084916 2014-9-15 0:00: DD No Violations 1.50
-312464363 2014-9-27 0:00: PB No Violations 12.00
-70213886 2017-12-19 0:00 PW No Violations 1.00
0070213886 2017-12-19 Production Wells No Violations This well is equipped with 5.5-inch diameter production casing. The well appears to be free flowing without any artificial lift technology present at this time. The well is piped to a gas processing unit and then to the production area. The production area contains four 400-barrel production fluid storage tank. The production records within the RBDMS system are current to 2017.
0312464363 2014-09-27 Plug / Plug Back No Violations Paterson rig #253 had lost hole due to planting the 12.25air hammer bit and every thing above it to the 5heavy wall drill pipe decided to plug after several attempts to fish tools out of the hole. The spear was used and lost down the hole on the fish. There was 2.375tubing at 700 with mule shoe at end. There was change over to 5drill pipe. They ran drill pipe above the 700 tail pipe. They tagged the fish at 1864. They used CalFrac as the cementing contractors. They set a 500 plug from 1864-1364. They then pulled up 700 and circulated all KCL Water out of well. They then pulled up to 500 and set the 500-0 plug. Good returns.
0764237603 2014-09-15 Drill / Deepen / Reopen No Violations On the day of my inspection the plan was to begin drilling the 22 hole later today. No violations noted.
1407159622 2014-08-02 Casing String Witnessed No Violations On the day of my inspection Lightning Energy had drilled the 30 open hole and 26 casing was ran and cemented. See cement ticket for details. No violations noted.
1407254961 2014-07-31 Administrative Inspection No Violations Spud notice via phone. Anticipate spud 08/01/2014.
1410986750 2014-09-17 Casing String Witnessed No Violations Onsite to witness the cementing of the surface casing. Previous casing set was the 26 conductor to 105. Patterson 253 drilled a 24 open hole to a depth of 340 and set 326 of 18 5/8 (87.5#/ft) casing with 3 centralizers. Calfrac well services cemented the casing in place using 561 sks of Class A (15.6; 1.2 yield) cement at 30% open hole excess. 99 bbl of water used to displace cement. 41 bbl of cement were returned to surface. Job was scheduled for 4 pm. Rig had trouble landing the casing and had to wash out the hole. Casing was set around 10pm. Cementing started at 12 am and pump truck went down and had to be swapped out. Pump job finished around 2am.
1427441507 2015-03-26 Plug / Plug Back No Violations I met with company man on rig and Cal Frac. They had to drill 12 feet of cement out when I arrived on location. They would pull one stand out of drill pipe and then test the treating iron to 3000 psi. Then Cal Frac got nippled up to the drill pipe and they broke circulation. Then the pipe rams were closed on the Blow Out Prevention stack. Cal Frac pressured up the well bore to 500 psi on surface. From 1800 with the hydrostatic weight of fluid the down hole pressure was 1300 psi. They company man and ODNR agreed that that was enough pressure to be placed on the micro channel. There does not need to be a formation break down. Andrew Corder will witness the plugging portion of the well after the mechanical bridge plug is set.
1594832029 2015-01-20 Preliminary Restoration No Violations The preliminary restoration for this well is completed. The pad is in satisfactory condition with proper erosion and sedimentation controls in place. Company shall continue to monitor the location to ensure the pad remains in satisfactory condition. Preliminary restoration passed.
1713084916 2014-09-15 Drill / Deepen / Reopen No Violations Patterson 253 was preparing to spud this date. Previous casing set was a 26 conductor.
1997075039 2017-05-11 Final Restoration No Violations The final restoration for this well is complete as the well has been plugged. The restoration for the well site pad disturbance area is required to be remediated once all other wells on this pad are plugged. Final restoration passed.
764237603 2014-9-15 0:00: DD No Violations 1.50

For data sources see[3]