X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-013-20805

Well Details

Well ID: 34-013-20805
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Washington Township
Operator Name: GULFPORT APPALACHIA LLC
Well Pad ID: US-OH-001068
Farm/Lease Name: LEPLEY 210218
License Status: Producing
License Date: 2015-02-13
Spud Date: 2014-07-19
Spud Drilling Contractor: SIDEWINDER DRILLING INC
Final Drill Date: 2015-04-18
Well Total Depth: 16998.00 ft
Configuration: Horizontal
Latitude: 39.870000
Longitude: -80.970000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-06-20 Proposed Formations:UTICA/POINT PLEASANT, Issued Date:6/20/2014, Expired Date:6/19/2016 12:00:00 PM, Drilling unit acres:1244, Proposed Well Type:OG, Proposed Well Class:EDPW
Correction to Well 2014-09-05 UNIT SIZE INCREASED TO 1257.988 ACRES.
APP 2015-02-13 Proposed Formations:UTICA THRU POINT PLEASANT, Issued Date:2/13/2015, Expired Date:2/12/2017 12:00:00 PM, Drilling unit acres:1257.988, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2015-04-18
Completion Report Received 2016-06-15
Construction Permit Expires 2017-02-12
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2016-06-16 10746 16861 0
10746 16861 0
10746 16861 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 10/09/2015 10/18/2015 9916 10,366,700.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 B-84 X-Chem, LLC Biocide Didecyl dimethyl ammonium chloride 7173-51-5 8 0.00255757 0
Water 7732-18-5 55.5 0.0177431 0
Ethanol 64-17-5 4 0.00127878 0
Glutaraldehyde 111-30-8 27 0.00863179 0
n-Alkyl dimethyl benzyl ammonium chloride 68424-85-1 5.5 0.00175833 0
SC-30 X-Chem, LLC Scale Inhibitor Water 7732-18-5 70 0.00688966 0
Sodium Polyacrylate Proprietary 30 0.00295271 0
Fresh water Stingray Carrier Water 7732-18-5 100 89.8966 0
100 mesh Minerva/Cadiz Proppant Sand 14808-60-7 100 0.977342 0
40/70 White Steubenville/Cadiz Proppant Sand 14808-60-7 100 8.73551 0
FRA 409 Weatherford Friction Reducer Adipic acid 124-04-9 3 0.00373476 0
Ethanaminium, N,N,N-trimethyl-2-[(1-oxo-2-propenyl)oxy]-,

chloride, polymer with 2-propenamide

69418-26-4 70 0.0871445 0
Proprietary Proprietary 30 0.0373476 0
Petroleum Distillate 64742-47-8 10 0.0124492 0
Alcohols, C12-14-secondary, ethoxylated 84133-50-6 5 0.0062246 0
Muriatic Acid Axiall, LLC Acid Water 7732-18-5 60 0.133655 0
Hydrogen chloride 7647-01-0 40 0.089103 0
TCA 6038F X-Chem, LLC Corossion Inhibitor Water 7732-18-5 80 0.00117449 0
Methanol 67-56-1 20 0.000293622 0

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2015-10-08 H2O 0 5432 Bbl 276800 STINGRAY PRESSURE PUMPING LLC STAGE 1/34

50 SHOTS STAGES 2-33 SEE IMAGES

2015-10-18 H2O 0 5446 Bbl 274700 STINGRAY PRESSURE PUMPING LLC STSAGE 32/32

50 SHOTS

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2016 GULFPORT ENERGY CORPORATION 3161694 0 357
2017 GULFPORT ENERGY CORPORATION 1061290 0 349
2018 GULFPORT ENERGY CORPORATION 438140 0 241
2019 GULFPORT ENERGY CORPORATION 103187 0 90

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2016 GULFPORT ENERGY CORPORATION Brine 28220 357
2017 GULFPORT ENERGY CORPORATION Brine 7762 349
2018 GULFPORT ENERGY CORPORATION Brine 3105 241
2019 GULFPORT ENERGY CORPORATION Brine 749 90

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-106761406 2020-10-26 0:00 PW No Violations 0.20
-1172578301 2020-3-19 0:00: PW No Violations 0.20
-1914707093 2015-9-11 0:00: PL No Violations 1.00
-859233009 2018-5-8 0:00:0 PW No Violations 0.50
0121440367 2015-03-28 Casing String Witnessed No Violations On this day the 18.625 surface casing was ran and cemented into a 24 open hole to a depth of 330. There was 496 sks of Class A cement ran and cement was circulated to surface.
0859233009 2018-05-08 Production Wells No Violations During my inspection Parco was on site and were equipping the wells with plunger lift systems. There are gas processing units on site and the production area contains four 400-barrel production fluid holding tanks. Production records for this well are current to 2017 within RBDMS.
1182920391 2017-12-18 Production Wells No Violations This well is equipped with 5.5-inch diameter production casing. The well appears to be free flowing with no artificial lift technology present. The well is piped to a gas processing unit and then to a production area that contains four 400-
121440367 2015-3-28 0:00: CS No Violations
1501159343 2018-08-07 Production Wells No Violations Status check inspection found the well pad surface and lease road has a gravel surface and is in good repair. There are 3 wells present on the pad all in production. The said well is equipped with a lower A section and upper B section with 2 diameter riser pipes present at the well head and equipped with valves and manual pressure gauges to monitor annular pressure. The 13.375 x 9.625 diameter casing pressure was 500 pounds per square inch (psi) the 9.625 x 5.5 diameter casing pressure was 2,000 psi. The 5.5 diameter production casing internal working pressure was 200 psi and the production flow line pressure was 800 psi. The well is equipped with production tubing and artificial lift technology. There is a single gas processing unit on location. At the right rear corner of the well pad is the production fluid facility consisting of 4 steel construction 400 barrel capacity production tanks located inside a polymer lined steel containment dike area. There is also a Mark West midstream station at the left front corner entry point of the well pad. Fire extinguishers and emergency shut down control points are present at all the critical areas of the well pad.
1914707093 2015-09-11 Preliminary Restoration No Violations On the day of my inspection the erosion and sedimentation controls were of satisfactory condition and proper vegetation had been established. The preliminary restoration for this well has been completed. Toe prep for these wells expected to commence on 09/18/201.

For data sources see[10]

References