X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-013-20736

Well Details

Well ID: 34-013-20736
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Warren Township
Operator Name: ECLIPSE RESOURCES I LP
Well Pad ID:
Farm/Lease Name: PRYOR-MYERS-SHUERLE
License Status: Not Drilled
License Date: 2013-12-24
Spud Date:
Spud Drilling Contractor:
Final Drill Date:
Well Total Depth:
Configuration: Vertical
Latitude: 39.960000
Longitude: -81.130000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-12-24 Proposed Formations:RHINESTREET SHALE - MARCELLUS SHALE, Issued Date:12/24/2013, Expired Date:12/24/2015 12:00:00 PM, Drilling unit acres:114, Proposed Well Type:OG, Proposed Well Class:EDPW
Construction Permit Expires 2015-12-24 EXPIRED PERMIT STATUS CHANGED 5/9/2016-ALE
Record Last Modified 2018-11-01 EXPIRED PERMIT STATUS CHANGED 5/9/2016-ALE

For data sources see[2]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1430069159 2014-1-29 0:00: AM No Violations 0.50
1391014072 2014-01-28 Surface Facility Construction No Violations On the day of my inspection I met with the landowners involved in this well. Eclipse was preparing to build a lease road and pad location to drill a well. The landowners were wanting to know if they were within compliance and able to drill the well. I explained to them that Eclipse was within compliance from the States stance according to ORC 1509 they were permitted to carry on with their operation. We also discussed erosion control. No violations noted.
1430069159 2014-01-29 Administrative Inspection No Violations I contacted Tom White via cell phone and informed him of my meeting with the landowners. I advised him to place proper erosion and sediment controls throughout the area. He agreed and told me that he would make sure they completed the construction properly.

For data sources see[3]

References