X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-013-20709

Well Details

Well ID: 34-013-20709
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Union Township
Operator Name: GULFPORT APPALACHIA LLC
Well Pad ID: US-OH-000758
Farm/Lease Name: FAMILY
License Status: Producing
License Date: 2013-07-03
Spud Date: 2013-07-05
Spud Drilling Contractor: NOMAC DRILLING CORP
Final Drill Date: 2013-09-17
Well Total Depth: 16925.00 ft
Configuration: Horizontal
Latitude: 40.050000
Longitude: -81.100000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-07-03 Proposed Formations:POINT PLEASANT, Issued Date:7/3/2013, Expired Date:7/3/2015 12:00:00 PM, Drilling unit acres:640, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2013-09-17
Correction to Well 2013-11-29 CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGE & COORDINATES) FROM AS DRILLED SURVEY PLAT.
Completion Report Received 2014-09-05
Construction Permit Expires 2015-07-03
Record Last Modified 2017-10-24

For data sources see[2]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 11/08/2013 11/25/2013 8772 10,736,800.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 40/70 White Minerva/Cadiz Proppant Sand 14808-60-7 100 14.5908 0
Clean Gel Stingray Guar Gel Solvent naphtha, (petroleum) 64742-96-7 65 0.03919 0
heavy aliphatic Not Available 35 0.0211 0
Entegrate SC8060 WB U.S. Water Scale Inhibitor Methyl Alcohol 67-56-1 20 0.0019 0
Aminotrimethylene Phosphonic Acid 6419-19-8 10 0.00095 0
Water 7732-18-5 59 0.00562 0
Phosphoric Acid 7664-38-2 1 0.0001 0
2-propenoic acid, sodium salt, polymer 37350-42-8 10 0.00095 0
Entegrate FR 7170 U.S. Water Friction Reducer Alcohols (C10-16), ethoxylated 68002-97-1 3.1 0.0028 0
Water 7732-18-5 48 0.04333 0
Petroleum distillate hydrotreated light 64742-47-8 28 0.02527 0
Alcohols (C12-16), ethoxylated 68551-12-2 3.1 0.0028 0
C12-C14 Alcohol ethoxylated 68439-50-9 3.1 0.0028 0
Ammonium chloride 12125-02-9 15 0.01354 0
Entecide QG40 U.S. Water Breaker ETHANOL 64-17-5 2.8 0.00011 0
GLUTARALDEHYDE 111-30-8 27 0.0011 0
Water 7732-18-5 56.4 0.0023 0
DIDECYL DIMETHYL AMMONIUM CHLORIDE 7173-51-5 8.3 0.00034 0
n-ALKYL DIMETHYL BENZYL AMMONIUM CHLORIDE 68424-85-1 5.5 0.00022 0
X-linker Stingray Guar Gel Water 7732-18-5 70 0 0
Ethylene Glycol Not Available 30 0 0
IC-250 Stingray Corrosion Inhibitor Proprietary polycarboxylic acid mixture Not Available 20 0 0
Water 7732-18-5 80 0 0
100 mesh Minerva/Cadiz Proppant Sand 14808-60-7 100 0.55867 0
Citric Acid 50% Pace International Acid citric acid 77-92-9 50 0.10787 0
Water 7732-18-5 50 0.10787 0
30/50 White Minerva/Cadiz Proppant Sand 14808-60-7 100 0 0
Fresh water Stingray Carrier Water 7732-18-5 100 84.4046 0
BioClear 5000 Weatherford Biocide Water 7732-18-5 95 0.02178 0
2,2-dibromo-3-nitril oprop ionam ide 10222-01-2 5 0.00115 0
Per Break Stingray Breaker Ammonium Persulfate 7727-54-0 99 0 0
Entegrate NE 1100 U.S. Water Demulsifier Ethylene/Propylene Oxide Polymer Not Available 40 0.01664 0
Water 7732-18-5 60 0.02496 0
PROCLEAN 200 U.S. Water Corrosion Inhibitor Water 7732-18-5 48 0.00057 0
Citric Acid, Food Grade 77-92-9 52 0.00062 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2013-11-24 H2O 15 280552 Gal 514480 STINGRAY PRESSURE PUMPING LLC STAGE 32/32

60 SHOTS

2013-11-08 H2O 15 428886 Gal 528871 STINGRAY PRESSURE PUMPING LLC STAGE 1/32

60 SHOTS STAGES 2-31 SEE IMAGES

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2013 GULFPORT ENERGY CORPORATION 29795 0 3
2014 GULFPORT ENERGY CORPORATION 3388552 2554 336
2015 GULFPORT ENERGY CORPORATION 1846023 6 363
2016 GULFPORT ENERGY CORPORATION 1112417 0 364
2017 GULFPORT ENERGY CORPORATION 752662 3 365
2018 GULFPORT ENERGY CORPORATION 554994 0 363
2019 GULFPORT ENERGY CORPORATION 91185 0 77

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2013 GULFPORT ENERGY CORPORATION Brine 3629 3
2014 GULFPORT ENERGY CORPORATION Brine 12799 336
2015 GULFPORT ENERGY CORPORATION Brine 3665 363
2016 GULFPORT ENERGY CORPORATION Brine 2544 364
2017 GULFPORT ENERGY CORPORATION Brine 1856 365
2018 GULFPORT ENERGY CORPORATION Brine 1934 363
2019 GULFPORT ENERGY CORPORATION Brine 862 77

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1410450209 2013-7-17 0:00: DD No Violations 1.00
-1493538538 2013-7-16 0:00: DD No Violations 1.00
-1642673562 2020-11-3 0:00: PW No Violations 0.20
-1721235534 2013-7-22 0:00: DD No Violations 1.00
-1767844515 2015-1-23 0:00: PL No Violations 0.50
-1909954223 2018-4-17 0:00: PW No Violations 0.50
-2126646790 2013-8-1 0:00:0 DD No Violations 2.00
-497878084 2013-8-13 0:00: DD No Violations 2.00
-717678452 2018-5-15 0:00: PW No Violations 0.50
-785051897 2013-7-29 0:00: DD No Violations 2.00
-860973734 2019-3-6 0:00:0 PW No Violations 0.40
-876438509 2013-7-21 0:00: CS No Violations 8.00
-883501663 2020-2-26 0:00: PW No Violations 0.30
0034328503 2017-12-11 Production Wells No Violations The well is currently equipped with 5.5-inch diameter production casing. The well appears to be free flowing currently with no artificial lift technology in place. The tank battery contains four 400-barrel production fluid storage tanks and a 500 barrel fluid storage tank. The production records in RBDMS are current to 2017.
0497878084 2013-08-13 Drill / Deepen / Reopen No Violations On the day of my inspection Nomac 311 was preparing to re-set the kick off plug and build the curve in the next 30 hrs. No violations noted.
0649862343 2014-07-30 Production Wells No Violations On the day of my inspection the wells were equipped with the necessary equipment to be capable of production. No violations noted.
0717678452 2018-05-15 Production Wells No Violations On the day of my inspection I witnessed that the well was equipped with 5.5 inch diameter production casing that was open flowing with all valves in the open position. Annular pressure monitoring was in place for the 9.625 inch diameter casing gauge read 0 pounds per square inch, the 13.375 inch diameter casing gauge read 475 pounds per square inch. Production equipment included a Separator, Gas Processing unit and line heater. There are 4- 400 barrel purge tanks and a 500 barrel purge tank shared with 3401320707, 3401320708. Identification tags were present, and production was up to date. No violations were found at the time of my inspection.
0785051897 2013-07-29 Drill / Deepen / Reopen No Violations On the day of my inspection Nomac # 311 was drilling ahead to kick off point. No violations noted.
0860973734 2019-03-06 Production Wells No Violations Status check inspection found 3 wells present on the pad. All 3 are producing with artificial lift installed. Annular pressure monitoring is installed on the well head A&B sections. Proper well identification is posted. Production equipment on location includes (3) gas processing units and a production fluid storage area that consists of (5) 400 barrel and one 500 barrel steel tanks, all situated inside a polymer lined steel containment dike area. This is an early pre construction rule pad, the pad perimeter does not contain an earthen berm and there is a single sediment pit on both the East and West side of the pad surface.
0876438509 2013-07-21 Casing String Witnessed No Violations On the day of my inspection Nomac 311 had reached total depth and Stingray was cementing the 16 surface casing @ 350. See cement ticket for details. No violations noted.
1343185309 2017-07-10 Production Wells No Violations The well is currently equipped properly to be considered capable of production. The well appears to be free flowing currently with no artificial lift technology in place. The well is piped over to a gas processing unit and then routed to sale and to the tank battery. The tank battery contains four 400 barrel production fluid storage tanks and a 500 barrel fluid storage tank. The production records in RBDMS are current to 2017.
1351872060 2013-07-30 Drill / Deepen / Reopen No Violations On the day of my inspection Nomac #311 was continuing to drill to the kick off point. No violations noted.
1373896520 2013-07-15 Drill / Deepen / Reopen No Violations On the day of my inspection Nomac 311 was rigging up on location. No violations noted.
1376404103 2013-08-12 Drill / Deepen / Reopen No Violations On the day of my inspection Nomac 311 was attempting to get start into the curve. No violations noted.
1377479599 2013-08-12 Drill / Deepen / Reopen No Violations On the day of my inspection Nomac 311 was preparing to set another cement plug so they would be able to kick off and start into their curve. No violations noted.
1410291061 2013-08-19 Drill / Deepen / Reopen No Violations On the day of my inspection Nomac 311 was drilling ahead @ 7,534. No violations noted.
1410450209 2013-07-17 Drill / Deepen / Reopen No Violations On the day of my inspection Nomac 311 was rigging up. No violations noted.
1474864862 2013-07-09 Casing String Witnessed No Violations On the day of my inspection Redstone had reached total depth and Stingray was cementing 26 casing in 32 open hole. See cement ticket for details. No violations noted.
1493538538 2013-07-16 Drill / Deepen / Reopen No Violations On the day of my inspection Nomac 311 was rigging up. No violations noted.
1615924532 2013-07-19 Drill / Deepen / Reopen No Violations On the day of my inspection Nomac 311 was rigging up. No violations noted.
1639523218 2013-08-21 Drill / Deepen / Reopen No Violations On the day of my inspection Nomac 311 was drilling ahead @ 10,258. No violations noted.
1721235534 2013-07-22 Drill / Deepen / Reopen No Violations On the day of my inspection Nomac 311 was preparing to go back to drilling for their 10.34casing. No violations noted.
1767844515 2015-01-23 Preliminary Restoration No Violations The preliminary restoration for this well is completed. The pad is in satisfactory condition with proper erosion and sedimentation controls in place. Company shall continue to monitor the location to ensure the pad remains in satisfactory condition. Preliminary restoration passed.
1892600245 2013-12-02 Drill / Deepen / Reopen No Violations On the day of my inspection Nomac 311 was landing the curve around 8870. No violations noted.
1909954223 2018-04-17 Production Wells No Violations The well is equipped with 5.5-inch diameter production casing. The well appears to be free flowing with no artificial lift technology present. The well is piped to a gas processing unit. From there, it is routed to a production area that contains five 400-barrel production fluid holding tanks and one 500-barrel fluid holding tank. Annular pressures read on the gauges provided appeared to be 350 pounds in between the outside of the 9.625-inch diameter casing and the inside of the 13.375-inch diameter casing and 0 pounds between the outside of the 5.5-inch diameter casing and the inside of the 9.625-inch diameter casing. The production records within RBDMS are currently updated to 2017.
1963640973 2013-07-31 Drill / Deepen / Reopen No Violations On the day of my inspection Nomac #311 had been having trouble with the motor and still attempting to drill to kick off point. No violations noted.
2076845299 2013-08-05 Drill / Deepen / Reopen No Violations On the day of my inspection Nomac #311 was preparing to do a formation integrity test. If test passes they will continue drilling into the curve. If it doesnt, they will run a casing string. No violations note.
2126646790 2013-08-01 Drill / Deepen / Reopen No Violations On the day of my inspection Nomac #311 was drilling ahead to kick off point. No violations noted.
34328503 2017-12-11 0:00 PW No Violations 1.00
649862343 2014-7-30 0:00: PW No Violations 0.50

For data sources see[9]

References