Well Details

Well ID: 34-013-20653
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Mead Township
Operator Name: XTO ENERGY INC.
Well Pad ID: US-OH-000549
Farm/Lease Name: KALDOR
License Status: Producing
License Date: 2012-04-09
Spud Date: 2012-06-15
Spud Drilling Contractor: WACO DRILLING
Final Drill Date: 2012-11-24
Well Total Depth: 11120.00 ft
Configuration: Horizontal
Latitude: 39.970000
Longitude: -80.830000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-01-11 Proposed Formations:UTICA SHALE, Issued Date:1/11/2012, Expired Date:1/10/2014 12:00:00 PM, Drilling unit acres:460.99, Proposed Well Type:OG, Proposed Well Class:EDPW
APP 2012-04-09 Proposed Formations:POINT PLEASANT, Issued Date:4/9/2012, Expired Date:4/9/2014 12:00:00 PM, Drilling unit acres:460.99, Proposed Well Type:OG, Proposed Well Class:EDPW
Correction to Well 2012-06-08 CORRECTION TO PROPOSED TOTAL DEPTH, PROPOSED GEOLOGICAL FORMATION AND CASING PROGRAM.
Reached Total Depth 2012-11-24
Correction to Well 2013-03-08 CORRECTION TO TARGET INFORMATION, FOOTAGE AND X, Y COORDINATES FROM AS DRILLED SURVEY PLAT. UNIT SIZE CHANGED TO 460.99 ACRES.
Completion Report Received 2013-04-17
End of Confidential Data 2013-11-24
Construction Permit Expires 2014-04-09
Correction to Well 2015-12-25 Change in acreage per as-drilled plat. Updated to 553.6817 AC-ALE
Record Last Modified 2017-10-23

For data sources see[2]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 02/12/2013 02/12/2013 5815.0 5350380.0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Biocide - MC 8520 Multi-Chem Biocide Whole Product None None
Acid - 7.5 HCl Acid Universal Acid Whole Product None None
Water water 7732-18-5 100.0 87.090319
Water 7732-18-5 30.0 0.001872
4,4 -Dimethyloxazolidine 51200-87-4 95.0 0.008849
Not hazardous 70.0 0.004369
3,4,4-Trimethyloxazolidine 75673-43-7 4.5 0.000419
Glutaraldehyde 111-30-8 60.0 0.002763
Hydrotreated light distillates (10-30) 64742-47-8 30.0 0.014752
Other -(non hazardous) 100.0 0.008107
2-Amino-2-Methyl-1-Propanol 124-68-5 0.5 0.00004700
Other -(non hazardous) 70.0 0.034422
Hydrochloric Acid (15-40) blended down to 7.5 7647-01-0 7.5 0.036267
Other -(non hazardous) 92.5 0.447294
Other -(non hazardous) 40.0 0.001842
Clay Stabilizer - ClaChek G Shrieve Clay Stabilizer None None
Scale Inhibitor - MC-MX-588-2 Multi-Chem Scale Inhibitor Whole Product None None
Biocide - MC 8650 Multi-Chem Biocide Whole Product None None
Sand Proppant sand 14808-60-7 100.0 12.34868
Friction Reducer - MC MX-14-5 Multi-Chem Friction Reducer Whole Product None None

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 8 6933 Bbl 385844 STAGE 17

60 SHOTS

H2O 8 6885 Bbl 377444 STAGE 14

60 SHOTS

H2O 8 7677 Bbl 353619 STAGE 6

60 SHOTS

H2O 8 6933 Bbl 385844 STAGE 16

60 SHOTS

2013-02-12 H2O 8 9787 Bbl 396749 STAGE 1

60 SHOTS

H2O 8 8388 Bbl 511845 STAGE 7

60 SHOTS

H2O 8 9269 Bbl 382400 STAGE 2

60 SHOTS

H2O 8 7069 Bbl 335515 STAGE 5

60 SHOTS

H2O 8 7348 Bbl 386144 STAGE 9

60 SHOTS

H2O 8 6851 Bbl 370669 STAGE 11

60 SHOTS

H2O 8 6937 Bbl 375844 STAGE 15

60 SHOTS

H2O 8 7068 Bbl 374356 STAGE 12

60 SHOTS

H2O 8 9990 Bbl 382626 STAGE 3

60 SHOTS

H2O 8 4730 Bbl 203174 STAGE 8

60 SHOTS

H2O 8 7389 Bbl 360188 STAGE 4

60 SHOTS

H2O 8 6883 Bbl 379326 STAGE 10

60 SHOTS

H2O 8 6917 Bbl 376894 STAGE 13

60 SHOTS

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2014 XTO ENERGY INC. 167834 16135 331
2015 XTO ENERGY INC. 134840 5370 211
2016 XTO ENERGY INC. 42355 1580 57
2017 XTO ENERGY INC. 0 0 0
2018 XTO ENERGY INC. 132741 4763 211
2019 XTO ENERGY INC. 15814 710 55

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 XTO ENERGY INC. Brine 21023 331
2015 XTO ENERGY INC. Brine 4402 211
2016 XTO ENERGY INC. Brine 149 57
2017 XTO ENERGY INC. Brine 0 0
2018 XTO ENERGY INC. Brine 2718 211
2019 XTO ENERGY INC. Brine 379 55

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1048121181 2013-1-31 0:00: CT No Violations 0.50
-1416092894 2012-10-19 0:00 DD No Violations 0.50
-1481130018 2012-10-25 0:00 DD No Violations
-1495296578 2013-2-13 0:00: CT No Violations 2.50
-1555755015 2013-3-14 0:00: AM No Violations 0.50
-1559079057 2013-2-27 0:00: CT No Violations 1.50
-1587832858 2013-2-26 0:00: CT No Violations 1.00
-172631786 2012-11-21 0:00 DD No Violations 2.00
-1728737064 2012-11-21 0:00 DD No Violations 4.00
-2050991984 2013-2-20 0:00: CT No Violations 2.00
-281274751 2018-7-16 0:00: PW No Violations 0.50
-374327213 2013-1-24 0:00: CT No Violations 0.50
-377426721 2012-11-23 0:00 DD No Violations
-521344407 2013-5-16 0:00: PL No Violations
-711262759 2016-1-26 0:00: PW No Violations
-739897619 2013-2-14 0:00: CT No Violations 3.00
0109806723 2012-11-01 Drill / Deepen / Reopen No Violations On the day of my inspection the rig was drilling in the lateral section at 13429ft. No violations were noted.
0172631786 2012-11-21 Drill / Deepen / Reopen No Violations On the day of my inspection Precision was drilling at 9970ft and were planning to reach total depth by Saturday. No violations noted.
0281274751 2018-07-16 Production Wells No Violations On the day of my inspection I witnessed that the well was equipped with a four-string casing design, 5.5-inch diameter production casing and 2.875 inch diameter tubing that appeared to be open flowing with no artificial lift technology. Annular pressure monitoring was in place on both the 13.325-inch diameter surface casing and the 9.625-inch diameter deep intermediate casing, pressures were monitored with transducers with no ability to read pressures at the well head. Both casings had bleed down lines ran to the production fluid tanks, at the time of my inspection the 13.375-inch diameter casing was open flowing into tanks through a choke manifold. Production equipment included a Gas Processing Unit, that was inside of containment. There were also 4- 400-barrel production fluid tanks inside containment. Production fluid tanks were all shared with 34013207760000, 34013206540000. There was also a defoamer injection tank near the well head and production fluid tanks. There was also a gas compressor on the northeast corner of the pad, and a flare stack that had a 6 foot flare at the time of my inspection. There was also a 500 barrel frack tank on location that was no longer hooked up to the wells. Identification tags were present, and production was up to date. No violations were found at the time of my inspection.
0361175172 2013-02-27 Completion Testing No Violations On the day of my inspection the mud had been cleaned and the contaminated soil removed and will be disposed of in a landfill.
0374327213 2013-01-24 Completion Testing No Violations On the day of my inspection basic was moving onto this hole to drill out cement shoe. No violations noted.
0375593663 2012-11-07 Drill / Deepen / Reopen No Violations On the day of my inspection rig was drilling the lateral section at 16,075 ft. TD will be 16,090ft. No violations noted.
0377426721 2012-11-23 Drill / Deepen / Reopen No Violations On the day of my inspection Precision was drilling at 10840ft and were still planning to reach total depth by Saturday. No violations noted.
0521344407 2013-05-16 Preliminary Restoration No Violations On site with local inspector Andrew Corder to look over restoration work preformed at site and I told inspector Corder that once vegetation is fully established restoration work would be satisfactory.
0711262759 2016-01-26 Production Wells No Violations On this day the well was equipped to be considered capable of production. The pad area appeared to be in satisfactory condition.
0739897619 2013-02-14 Completion Testing No Violations On the day of my inspection I was accompanied by Inspector Dave Ball. Universal Well Services was on site stimulating the well. No violations noted.
1048121181 2013-01-31 Completion Testing No Violations On the day of my inspection the company was preparing for fracing operations. The earth pit was being filled with fresh water. Universal was present and company was working with the well head. Fracing anticipated to begin on 02/11/2013. No violations noted.
109806723 2012-11-1 0:00: DD No Violations 1.00
1350769989 2012-10-18 Drill / Deepen / Reopen No Violations On the day of my inspection rig was still down and waiting on top head drive parts. No violations noted.
1352984643 2012-11-14 Drill / Deepen / Reopen No Violations On the day of my inspection Precision Drilling 228 tagged cement at 4610 and will start drilling after circulating three bottoms up. Kick off will be at 5014. No violations noted.
1416092894 2012-10-19 Drill / Deepen / Reopen No Violations Call from company man that rig had been fixed and they were back to drilling.
1481130018 2012-10-25 Drill / Deepen / Reopen No Violations On the day of my inspection the rig was drilling in the lateral section. No violations were noted.
1495296578 2013-02-13 Completion Testing No Violations On the day of my inspection Universal Well Services was on site stimulating the well. I spoke with Ed Smith of XTO who advised that they will be completing 7 stages and drilling out the plugs after commencement of the stimulation. No violations noted.
1555755015 2013-03-14 Administrative Inspection No Violations Received call from Stan Lowther of XTO. They will be testing BOPs on 03/15/2013.
1559079057 2013-02-27 Completion Testing No Violations I received a call from Todd Snyder of XTO who informed me of a FRESH WATER based mud spill on site. Upon arrival I found that most of the mud was within containment and all was contained on the pad. Buckeye Water services was on site to help with the remediation.
1587832858 2013-02-26 Completion Testing No Violations On the day of my inspection the company was waiting on mud to load the hole and begin pulling tubing. No violations noted.
1687104599 2012-12-17 Completion Testing No Violations On the day of my inspection completion efforts had not begun. There was no activity taking place. No violations noted.
1728737064 2012-11-21 Drill / Deepen / Reopen No Violations Rig is currently drilling at depth of 9972 and the highest gas in unit has been 2200 units. The Measurement while drilling tools were laid out on site. Pulse tool is on bottom. The gamma ray tool , Batteries and then the Brain or the electronics part of the tool is on the top toward the rig. This tool tells where and what is going on at the bit at all times.
2050991984 2013-02-20 Completion Testing No Violations On the day of my inspection the Universal Well Services were stimulating the well. No violations noted.
361175172 2013-2-27 0:00: CT No Violations 1.00
375593663 2012-11-7 0:00: DD No Violations 2.00