Well Details

Well ID: 34-013-20641
Loading map...
Country: United States
State: Ohio
County: Belmont
Municipality: Warren Township
Operator Name: OXFORD OIL
Well Pad ID:
Farm/Lease Name: WILSON DUDZIK
License Status: Lost Hole
License Date: 2011-07-06
Spud Date: 2011-08-24
Spud Drilling Contractor: G & L DRILLING
Final Drill Date: 2011-08-18
Well Total Depth: 126.00 ft
Configuration: Vertical
Latitude: 40.000000
Longitude: -81.140000

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2011-07-06 Proposed Formations:BEREA THRU KNOX, Issued Date:7/6/2011, Expired Date:7/5/2013 12:00:00 PM, Drilling unit acres:44, Proposed Well Type:OG, Proposed Well Class:EDPW
Correction to Well 2011-07-15 CORRECTION TO FOOTAGE, SHOULD BE "1125'NL & 2430'EL OF SEC. 10".
Reached Total Depth 2011-08-18 LOST HOLE WHILE DRILLING CONDUCTOR. FILLED WITH REDI-MIX. WILL SKID ~ 30 FEET TO NORTHEAST AND RE-DRILL. NEW LOCATION LAT-
Construction Permit Expires 2013-07-05 LOST HOLE WHILE DRILLING CONDUCTOR. FILLED WITH REDI-MIX. WILL SKID ~ 30 FEET TO NORTHEAST AND RE-DRILL. NEW LOCATION LAT-
Completion Report Received 2014-06-20 LOST HOLE WHILE DRILLING CONDUCTOR. FILLED WITH REDI-MIX. WILL SKID ~ 30 FEET TO NORTHEAST AND RE-DRILL. NEW LOCATION LAT-
Record Last Modified 2014-06-20 LOST HOLE WHILE DRILLING CONDUCTOR. FILLED WITH REDI-MIX. WILL SKID ~ 30 FEET TO NORTHEAST AND RE-DRILL. NEW LOCATION LAT-

For data sources see[2]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2011 OXFORD OIL 0.00 0.00 0
2012 OXFORD OIL 0.00 0.00 366

For data sources see[3] [4]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2011 OXFORD OIL Brine 385
2012 OXFORD OIL Brine 0 366

For data sources see[5] [6]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1358595730 2012-12-12 0:00 PW No Violations 0.50
-1493577573 2011-8-23 0:00: DD No Violations 1.00
0389354478 2013-01-22 Production Wells No Violations On the day of my inspection the well as equipped with a pumping unit and capable of production. The tank battery contents included two 100 bbl oil storage tanks, one 75 bbl brine storage tank, and a mechanical separator. No violations noted.
0657029459 2012-10-15 Preliminary Restoration No Violations This site is now has production tanks set but is not properly restored. I will check back at a later date. No violations noted.
1314192706 2011-08-16 Drill / Deepen / Reopen No Violations On day of inspection I was accompanied by inspector Brett Farnsworth. The G & L rig was on site. They were having trouble with the hole caving in on them and washing out. They decided to fill the hole with a ready mix truck. The cement job consisted of a total of 16 yards of cement to top off the hole. The hole was 126ft to total depth.
1358595730 2012-12-12 Production Wells No Violations On the day of my inspection the well was equipped with a pumping unit and capable of production. No violations were noted.
1493577573 2011-08-23 Drill / Deepen / Reopen No Violations On day of inspection I was accompanied by inspector Brett Farnsworth. The company has skidded the rig and kept within compliance of laws regarding skidding of the rig. G & L were waiting for parts to arrive so that they can begin drilling again.
389354478 2013-1-22 0:00: PW No Violations 0.50
657029459 2012-10-15 0:00 PL No Violations 0.50