If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-013-20603 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.97,"lon":-80.86,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Belmont | |
Municipality: Mead Township | |
Operator Name: XTO ENERGY INC. | |
Well Pad ID: | |
Farm/Lease Name: GULLEY UNIT | |
License Status: Final Restoration | |
License Date: 2013-05-21 | |
Spud Date: 2009-08-05 | |
Spud Drilling Contractor: CO TOOLS | |
Final Drill Date: 2009-08-18 | |
Well Total Depth: 5934.00 ft | |
Configuration: Vertical | |
Latitude: 39.970000 | |
Longitude: -80.860000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2009-07-17 | Proposed Formations:MARCELLUS SHALE, Issued Date:7/17/2009, Expired Date:7/17/2010 6:00:00 AM, Drilling unit acres:262.97, Proposed Well Type:OG, Proposed Well Class:EDPW |
Correction to Well | 2009-07-24 | CHANGE IN CASING PROGRAM & ADDITION OF PERMIT CONDITIONS. |
Reached Total Depth | 2009-08-18 | |
Completion Report Received | 2009-11-12 | |
APP | 2010-09-01 | Proposed Formations:ORISKANY, Issued Date:9/1/2010, Expired Date:8/31/2012 12:00:00 PM, Drilling unit acres:266, Proposed Well Type:OG, Proposed Well Class: |
Change of Owner | 2012-01-24 | Operator changed from 8243, PHILLIPS EXPLORATION INC to 8063, XTO ENERGY INC. |
APP | 2013-05-21 | Proposed Formations:ORISKANY, Issued Date:5/21/2013, Expired Date:5/21/2015 12:00:00 PM, Drilling unit acres:262.97, Proposed Well Type:OG, Proposed Well Class: |
Plugged/Abandoned | 2013-08-30 | |
Construction Permit Expires | 2015-05-21 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2010-01-27 | 5658 | 5698 | 66 |
2010-01-27 | 5725 | 5770 | 90 |
5658 | 5698 | 66 | |
5725 | 5770 | 90 | |
5658 | 5698 | 66 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 35887 Bbl | 909800 | 3080M SCF NITROGEN |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2009 | PHILLIPS EXPLORATION INC | 8481.00 | 31.00 | 49 |
2010 | PHILLIPS EXPLORATION INC | 0.00 | 0.00 | 0 |
2011 | PHILLIPS EXPLORATION INC | 0.00 | 0.00 | 0 |
2012 | PHILLIPS EXPLORATION INC | 0.00 | 0.00 | 0 |
2013 | XTO ENERGY INC. | 0.00 | 0.00 | 0 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2009 | PHILLIPS EXPLORATION INC | Brine | 4802 | 49 |
2010 | PHILLIPS EXPLORATION INC | Brine | 0 | 0 |
2011 | PHILLIPS EXPLORATION INC | Brine | 0 | 0 |
2012 | PHILLIPS EXPLORATION INC | Brine | 0 | 0 |
2013 | XTO ENERGY INC. | Brine | 0 | 0 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1298159076 | 2013-2-14 0:00: | PB | No Violations | 4.00 |
-1322624997 | 2012-10-5 0:00: | PL | No Violations | |
-1598223418 | 2010-7-21 0:00: | PW | No Violations | 1.00 |
-1739354675 | 2010-7-9 0:00:0 | PW | No Violations | 1.00 |
0271772781 | 2010-06-17 | Preliminary Restoration | No Violations | On day of inspection well was supplied with a Texas well head and the separator and triethyelene glycol unit has been removed. There are three 210 bbl tanks and the dike and id are in place. Vegetation has been established. Production has been turned in. Well is shut in. Will check back at later date. Talked to the landowner said that well was shut in back in Nov. |
0881582993 | 2009-09-02 | Completion Testing | No Violations | WELL IS DRILLED AND PC IS GETTING READY FOR THE FRAC.THEY HAVE MADE A PIT THAT MEASURES AN ACRE ACROSS THE TOP.THEY INSTALLED A 20,000 PSI FRAC VALVE.WILL FRAC WITH 2 MILLION GALS OF WATER. |
1141037184 | 2013-08-29 | Plug / Plug Back | No Violations | On site to assist local inspector with plugging operation.
Bottom hole plug was set today after killing well it had 1980 psi on casing prior to killing it. |
1249600283 | 2009-08-06 | Drill / Deepen / Reopen | No Violations | THE RIG PUSHER JIM BENTZ FROM PHILLIPS DRILLING CALLED AND THEY WERE GOING TO DRILL THROUGH A POSSIBLE MINE SHAFT.AT 460-500.THEY DRILLED THROUGH WITH NO SHAFT.THEY HAD CALLED CEMENT TRUCKS.THEY WERE GOING TO HAVE 11 3/4 SURFACE JOB.TRUCKS GOT HELD UP IN A TRAFFIC JAM. |
1250076763 | 2009-08-12 | Drill / Deepen / Reopen | No Violations | ARRIVED ON SITE AT 3:00AM.PER CALL OF DRILLING SUPERINTENDENT RICH LIGHTNER.THEY HAVE HAD TROUBLE RUNNING THIS 8 5/8 CASING.THERE WAS GOING TO BE APPROX.2200 OF CASING RAN. |
1253626758 | 2009-09-15 | Completion Testing | No Violations | PC WAS FRACING WELL WITH 2 MILLION GAL OF WATER.THEY WERE ALLOWED 100,000 GAL WATER PER DAY.THE MARCELLUS WAS FRACED WITH 2 STAGES.IST STAGE TOOK MILLION GAL.THEY GOT A RATE OF 120 BBL PER MINUTE THROUGH 5.5 CASING. |
1296749795 | 2011-02-03 | Production Wells | No Violations | Well is capable but is shut in. Company has applied for plugging permit. Will check back at later date. |
1298159076 | 2013-02-14 | Plug / Plug Back | No Violations | On the day of my inspection I was accompanied by Inspector Dave Ball and XTO representative Stan Lowther. We discussed all aspects of plugging a well and what would be expected of XTO during the plugging of this well. Stan advised that plugging would not begin until April of this year at the earliest. |
1322624997 | 2012-10-05 | Preliminary Restoration | No Violations | Restoration work at site satisfactory pit has been filled in and site restored and well is shut in at present time, according to company rep they plan on plugging well in the near future and they have meeting with land owner scheduled for the first week of November to discuss plugging of said well. |
1360971642 | 2013-02-14 | Plug / Plug Back | No Violations | On site with local inspector and company rep to go over requirements for up coming plugging operation. |
1412080636 | 2015-07-16 | Final Restoration | No Violations | Location has met 1509.072B requirements. |
1598223418 | 2010-07-21 | Production Wells | No Violations | On day of inspection Stonerock and I went to this site. There was no change. |
1739354675 | 2010-07-09 | Production Wells | No Violations | On day of inspection well was shut in with a pressure of 1750psi on the annulas.Took pictures. Company plans to plug well. Makes 200bbl of water a day. |
271772781 | 2010-6-17 0:00: | PL | No Violations | 2.00 |
881582993 | 2009-9-2 0:00:0 | CT | No Violations |
For data sources see[9]