If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-007-22455 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.62,"lon":-80.77,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Ashtabula | |
Municipality: New Lyme Township | |
Operator Name: CLARENCE K TUSSEL JR LTD | |
Well Pad ID: | |
Farm/Lease Name: WILLIAMS T | |
License Status: Producing | |
License Date: 1984-07-19 | |
Spud Date: 1984-07-27 | |
Spud Drilling Contractor: PEP DRLG | |
Final Drill Date: 1984-08-01 | |
Well Total Depth: 3702.00 ft | |
Configuration: Vertical | |
Latitude: 41.620000 | |
Longitude: -80.770000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1983-11-22 | 1464 HLH DRILLING INC GeoDate 11/22/83 |
Oil and Gas | 1983-11-22 | Issued Date 11/22/83 Expired Date 5/20/84 Acres 0020000 Tool Type RTA Proposed Formation CLINTON Proposed Depth 00000 Proposed Drill Depth 00000 |
CO | 1984-07-19 | 1869 WHO MINERAL DEVELOP INC GeoDate 7/19/84 |
Oil and Gas | 1984-07-19 | Issued Date 7/19/84 Expired Date 1/15/85 Acres 0020000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 03702 Proposed Drill Depth 03702 |
Original Spud | 1984-07-27 | R.I. R.L. 7-14-84 |
Completed | 1984-08-01 | R.I. R.L. 7-14-84 |
Reached Total Depth | 1984-08-01 | R.I. R.L. 7-14-84 |
Construction Permit Expires | 1985-01-15 | R.I. R.L. 7-14-84 |
Completion Report Received | 1985-11-06 | R.I. R.L. 7-14-84 |
Change of Owner | 2012-10-16 | Operator changed from 1869, WHO MINERAL DEVELOP INC to 7443, FORRISTAL PUMPING INC |
Change of Owner | 2016-11-22 | Operator changed from 7443, FORRISTAL PUMPING INC to 12, TUSSEL CLARENCE JR |
Record Last Modified | 2017-02-15 | R.I. R.L. 7-14-84 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 3480 | 3570 | 34 |
3480 | 3570 | 34 | |
3480 | 3570 | 34 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 86850 Bbl | 80000 | FRAC: H2O,SAND |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1986 | WHO MINERAL DEVELOP INC | 1423.00 | 35.00 | 320 |
1987 | DIXIE ENERGY CO INC | 12103.00 | 276.00 | 365 |
1988 | WHO MINERAL DEVELOP INC | 1621.00 | 17.00 | 365 |
1989 | WHO MINERAL DEVELOP INC | 143.00 | 13.00 | 0 |
1991 | WHO MINERAL DEVELOP INC | 684.00 | 35.00 | 365 |
1992 | WHO MINERAL DEVELOP INC | 481.00 | 16.00 | 365 |
1993 | WHO MINERAL DEVELOP INC | 82.00 | 15.00 | 365 |
1997 | WHO MINERAL DEVELOP INC | 5523.00 | 0.00 | 365 |
2002 | WHO MINERAL DEVELOP INC | 0.00 | 0.00 | 0 |
2006 | WHO MINERAL DEVELOP INC | 602.00 | 68.00 | 365 |
2007 | WHO MINERAL DEVELOP INC | 592.00 | 63.00 | 365 |
2008 | WHO MINERAL DEVELOP INC | 566.00 | 53.00 | 365 |
2009 | WHO MINERAL DEVELOP II IN | 699.00 | 0.00 | 365 |
2010 | WHO MINERAL DEVELOP II IN | 546.00 | 58.00 | 365 |
2013 | FORRISTAL PUMPING INC | 517.00 | 0.00 | 365 |
2014 | FORRISTAL PUMPING INC | 187.00 | 0.00 | 59 |
2016 | FORRISTAL PUMPING INC | 0.00 | 0.00 | 0 |
2017 | TUSSEL CLARENCE JR | 37.00 | 0.00 | 365 |
2018 | TUSSEL CLARENCE JR | 749.00 | 0.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1986 | WHO MINERAL DEVELOP INC | Brine | 72 | 320 |
1987 | DIXIE ENERGY CO INC | Brine | 145 | 365 |
1988 | WHO MINERAL DEVELOP INC | Brine | 45 | 365 |
1989 | WHO MINERAL DEVELOP INC | Brine | 40 | 0 |
1991 | WHO MINERAL DEVELOP INC | Brine | 118 | 365 |
1992 | WHO MINERAL DEVELOP INC | Brine | 97 | 365 |
1993 | WHO MINERAL DEVELOP INC | Brine | 57 | 365 |
1997 | WHO MINERAL DEVELOP INC | Brine | 60 | 365 |
2002 | WHO MINERAL DEVELOP INC | Brine | 0 | 0 |
2006 | WHO MINERAL DEVELOP INC | Brine | 160 | 365 |
2007 | WHO MINERAL DEVELOP INC | Brine | 0 | 365 |
2008 | WHO MINERAL DEVELOP INC | Brine | 28 | 365 |
2009 | WHO MINERAL DEVELOP II IN | Brine | 0 | 365 |
2010 | WHO MINERAL DEVELOP II IN | Brine | 0 | 365 |
2013 | FORRISTAL PUMPING INC | Brine | 75 | 365 |
2014 | FORRISTAL PUMPING INC | Brine | 40 | 59 |
2016 | FORRISTAL PUMPING INC | Brine | 0 | 0 |
2017 | TUSSEL CLARENCE JR | Brine | 0 | 365 |
2018 | TUSSEL CLARENCE JR | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1215842085 | 2014-11-7 0:00: | PW | No Violations | |
-1865206625 | 2006-1-24 0:00: | PW | No Violations | |
-1906831028 | 2012-3-23 0:00: | PW | No Violations | |
-1943464025 | 2017-7-14 0:00: | PW | No Violations | |
0000007934 | Preliminary Restoration | No Violations | PASSED Y WITNESSED 4/8/92 INSPECTOR JERRY KOHL DATE 04/0819/92 DATA FROM OLD VAX INFO | |
0460222742 | 2017-03-09 | Production Wells | No Violations | Complaint# 5548, Allison Cycyk. My inspection found the well was equipped with a plunger lift system. I found no leaks from the well. There was a natural drain route just south of the well head. I found no compliance issues with this well. |
1215842085 | 2014-11-07 | Production Wells | No Violations | My inspection of this well found no compliance issues. |
1474361127 | 2009-03-06 | Production Wells | No Violations | no violations . |
1659018162 | 2017-01-18 | Production Wells | No Violations | My inspection found no compliance issues with this well. |
1865206625 | 2006-01-24 | Production Wells | No Violations | no violations . |
1871800265 | 2020-4-17 0:00: | PW | No Violations | |
1906831028 | 2012-03-23 | Production Wells | No Violations | no violations . |
1943464025 | 2017-07-14 | Production Wells | No Violations | On location to follow-up on compliant # 5548. The well is equipped with a plunger lift system. No violations noted at the time of this inspection. Identification posted at the well and tank battery. Lease road is gated. |
2106077555 | 2017-11-03 | Production Wells | No Violations | I conducted an inspection on this well regarding complaint # 5548. During this inspection, the well was equipped with a plunger lift assembly and the valves on the annulus and flow lines were closed. The dike around the well had been repaired and plugged. The tank battery consisted of one 210 BBL production tank, one 100 BBL brine tank and a mechanical separator. Valves on the separator were open. The tank battery was diked and fenced and was shared with well 2-2454. Legible signage was located at the well and tank battery and the lease access was stable. No violations observed. |
460222742 | 2017-3-9 0:00:0 | PW | No Violations | |
7934 | PL | No Violations |
For data sources see[9]