X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-007-20924

Well Details

Well ID: 34-007-20924
Loading map...
Country: United States
State: Ohio
County: Ashtabula
Municipality: Monroe Township
Operator Name: CLARENCE K TUSSEL JR LTD
Well Pad ID:
Farm/Lease Name: COLE ARTHUR R& JOSEPHINE
License Status: Producing
License Date: 1978-05-17
Spud Date: 1978-06-07
Spud Drilling Contractor:
Final Drill Date: 1978-09-08
Well Total Depth: 3253.00 ft
Configuration: Vertical
Latitude: 41.880000
Longitude: -80.540000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1978-05-17 12 TUSSELL CLARENCE JR GeoDate 5/17/78
Original Spud 1978-06-07
Completed 1978-09-08
Reached Total Depth 1978-09-08
Record Last Modified 2013-10-03

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-11 3109 3166 0
3109 3166 0
3109 3166 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 1690 Bbl 57500

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1985 TUSSEL CLARENCE JR 7759.00 0.00 0
1986 TUSSEL CLARENCE JR 7281.00 0.00 365
1987 TUSSEL CLARENCE JR 5315.00 0.00 365
1988 TUSSEL CLARENCE JR 4834.00 0.00 365
1990 TUSSEL CLARENCE JR 4478.00 0.00 365
1991 TUSSEL CLARENCE JR 4070.00 0.00 365
1992 TUSSEL CLARENCE JR 3754.00 0.00 365
1993 TUSSEL CLARENCE JR 4210.00 0.00 365
1995 TUSSEL CLARENCE JR 4032.00 0.00 365
1996 TUSSEL CLARENCE JR 3743.00 0.00 365
1997 TUSSEL CLARENCE JR 35871.00 0.00 365
1998 TUSSEL CLARENCE JR 3765.00 0.00 365
1999 TUSSEL CLARENCE JR 3547.00 0.00 365
2000 TUSSEL CLARENCE JR 3296.00 0.00 365
2001 TUSSEL CLARENCE JR 3509.00 0.00 365
2002 TUSSEL CLARENCE JR 3738.00 0.00 365
2003 TUSSEL CLARENCE JR 3972.00 0.00 365
2004 TUSSEL CLARENCE JR 3663.00 0.00 365
2005 TUSSEL CLARENCE JR 3630.00 0.00 365
2006 TUSSEL CLARENCE JR 3351.00 0.00 365
2007 TUSSEL CLARENCE JR 3729.00 0.00 365
2008 TUSSEL CLARENCE JR 3324.00 0.00 365
2009 TUSSEL CLARENCE JR 3471.00 0.00 365
2010 TUSSEL CLARENCE JR 3720.00 0.00 365
2011 TUSSEL CLARENCE JR 4049.00 0.00 365
2012 TUSSEL CLARENCE JR 4375.00 0.00 366
2013 TUSSEL CLARENCE JR 3372.00 0.00 365
2014 TUSSEL CLARENCE JR 3360.00 0.00 365
2015 TUSSEL CLARENCE JR 3753.00 0.00 365
2016 TUSSEL CLARENCE JR 3428.00 0.00 365
2017 TUSSEL CLARENCE JR 2932.00 0.00 365
2018 TUSSEL CLARENCE JR 2880.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1985 TUSSEL CLARENCE JR Brine 188 0
1986 TUSSEL CLARENCE JR Brine 101 365
1987 TUSSEL CLARENCE JR Brine 127 365
1988 TUSSEL CLARENCE JR Brine 105 365
1990 TUSSEL CLARENCE JR Brine 104 365
1991 TUSSEL CLARENCE JR Brine 86 365
1992 TUSSEL CLARENCE JR Brine 38 365
1993 TUSSEL CLARENCE JR Brine 130 365
1995 TUSSEL CLARENCE JR Brine 80 365
1996 TUSSEL CLARENCE JR Brine 106 365
1997 TUSSEL CLARENCE JR Brine 0 365
1998 TUSSEL CLARENCE JR Brine 75 365
1999 TUSSEL CLARENCE JR Brine 59 365
2000 TUSSEL CLARENCE JR Brine 51 365
2001 TUSSEL CLARENCE JR Brine 78 365
2002 TUSSEL CLARENCE JR Brine 79 365
2003 TUSSEL CLARENCE JR Brine 42 365
2004 TUSSEL CLARENCE JR Brine 26 365
2005 TUSSEL CLARENCE JR Brine 88 365
2006 TUSSEL CLARENCE JR Brine 50 365
2007 TUSSEL CLARENCE JR Brine 49 365
2008 TUSSEL CLARENCE JR Brine 0 365
2009 TUSSEL CLARENCE JR Brine 49 365
2010 TUSSEL CLARENCE JR Brine 53 365
2011 TUSSEL CLARENCE JR Brine 47 365
2012 TUSSEL CLARENCE JR Brine 103 366
2013 TUSSEL CLARENCE JR Brine 44 365
2014 TUSSEL CLARENCE JR Brine 65 365
2015 TUSSEL CLARENCE JR Brine 60 365
2016 TUSSEL CLARENCE JR Brine 74 365
2017 TUSSEL CLARENCE JR Brine 67 365
2018 TUSSEL CLARENCE JR Brine 0 365

For data sources see[7] [8]

References