34-007-20850

Well Details

Well ID: 34-007-20850
Loading map...
Country: United States
State: Ohio
County: Ashtabula
Municipality: Sheffield Township
Operator Name: BIG SKY ENERGY INC
Well Pad ID:
Farm/Lease Name: CASE M & M
License Status: Producing
License Date: 1977-08-04
Spud Date: 1977-09-23
Spud Drilling Contractor:
Final Drill Date: 1977-09-29
Well Total Depth: 3285.00 ft
Configuration: Vertical
Latitude: 41.820000
Longitude: -80.630000

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1977-08-04 300 PETROLEUM ENERGY PROD COR GeoDate 8/4/77
Oil and Gas 1977-08-04 Issued Date 8/4/77 Expired Date Acres 0044450 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 00000 Proposed Drill Depth 00000
Original Spud 1977-09-23 BW=23.6
Completed 1977-09-29 BW=23.6
Reached Total Depth 1977-09-29 BW=23.6
Completion Report Received 1978-05-17 BW=23.6
CO 1991-10-09 201 GREEN GAS CO GeoDate 8/4/77
CO 1992-04-08 1453 GREEN ENERGY INC GeoDate 8/4/77
Change of Owner 2001-02-06 Operator changed from 1453, GREEN ENERGY INC to 1333, BARR ROBT/dba BIG SKY PET
Record Last Modified 2013-10-03 BW=23.6

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-11 3170 3213 0
3170 3213 0
3170 3213 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 1200 Bbl 90000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1985 EVERFLOW EASTERN PARTNERS LP 25.00 0.00 214
1986 EVERFLOW EASTERN PARTNERS LP 0.00 0.00 365
1987 EVERFLOW EASTERN PARTNERS LP 0.00 0.00 365
1990 EVERFLOW EASTERN PARTNERS LP 0.00 0.00 365
1991 EVERFLOW EASTERN PARTNERS LP 0.00 0.00 365
1992 GREEN ENERGY INC 550.00 78.00 365
1993 GREEN ENERGY INC 21.00 0.00 89
1994 GREEN ENERGY INC 25.00 0.00 59
1995 GREEN ENERGY INC 10.00 0.00 30
1996 GREEN ENERGY INC 30.00 0.00 61
1997 GREEN ENERGY INC 25.00 0.00 61
1998 GREEN ENERGY INC 20.00 0.00 61
1999 GREEN ENERGY INC 20.00 0.00 61
2000 GREEN ENERGY INC 16.00 0.00 61
2001 BIG SKY ENERGY INC 0.00 0.00 365
2002 BIG SKY ENERGY INC 0.00 0.00 0
2003 BIG SKY ENERGY INC 3.00 0.00 365
2004 BIG SKY ENERGY INC 67.00 0.00 365
2005 BIG SKY ENERGY INC 36.00 0.00 365
2006 BIG SKY ENERGY INC 33.00 0.00 365
2007 BIG SKY ENERGY INC 6.00 0.00 365
2008 BIG SKY ENERGY INC 0.00 0.00 365
2009 BIG SKY ENERGY INC 1.00 0.00 365
2010 BIG SKY ENERGY INC 1.00 10.00 365
2011 BIG SKY ENERGY INC 2.00 8.00 365
2012 BIG SKY ENERGY INC 138.00 4.00 366
2013 BIG SKY ENERGY INC 275.00 0.00 280
2014 BIG SKY ENERGY INC 7.00 0.00 365
2016 BIG SKY ENERGY INC 0.00 0.00 0
2017 BIG SKY ENERGY INC 0.00 0.00 0

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1985 EVERFLOW EASTERN PARTNERS LP Brine 0 214
1986 EVERFLOW EASTERN PARTNERS LP Brine 163 365
1987 EVERFLOW EASTERN PARTNERS LP Brine 0 365
1990 EVERFLOW EASTERN PARTNERS LP Brine 0 365
1991 EVERFLOW EASTERN PARTNERS LP Brine 0 365
1992 GREEN ENERGY INC Brine 724 365
1993 GREEN ENERGY INC Brine 0 89
1994 GREEN ENERGY INC Brine 0 59
1995 GREEN ENERGY INC Brine 0 30
1996 GREEN ENERGY INC Brine 0 61
1997 GREEN ENERGY INC Brine 0 61
1998 GREEN ENERGY INC Brine 0 61
1999 GREEN ENERGY INC Brine 0 61
2000 GREEN ENERGY INC Brine 0 61
2001 BIG SKY ENERGY INC Brine 0 365
2002 BIG SKY ENERGY INC Brine 0
2003 BIG SKY ENERGY INC Brine 0 365
2004 BIG SKY ENERGY INC Brine 0 365
2005 BIG SKY ENERGY INC Brine 0 365
2006 BIG SKY ENERGY INC Brine 0 365
2007 BIG SKY ENERGY INC Brine 0 365
2008 BIG SKY ENERGY INC Brine 1 365
2009 BIG SKY ENERGY INC Brine 0 365
2010 BIG SKY ENERGY INC Brine 0 365
2011 BIG SKY ENERGY INC Brine 0 365
2012 BIG SKY ENERGY INC Brine 0 366
2013 BIG SKY ENERGY INC Brine 0 280
2014 BIG SKY ENERGY INC Brine 0 365
2016 BIG SKY ENERGY INC Brine 0 0
2017 BIG SKY ENERGY INC Brine 0 0

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1088241694 2016-12-22 0:00 PW No Violations
-1156442221 2017-2-17 0:00: PW No Violations
-1394312027 2014-12-11 0:00 PW No Violations
-143727494 2015-5-28 0:00: PW No Violations
-1463591095 2015-8-31 0:00: PW No Violations
-1875528880 2015-11-20 0:00 PW No Violations
-2012069969 2020-1-3 0:00:0 PW No Violations
-2101897558 2015-7-9 0:00:0 PW No Violations
-313611087 2015-5-5 0:00:0 PW No Violations
-582837911 2017-10-30 0:00 PW No Violations 1.00
-594909935 2015-11-23 0:00 PW No Violations
-598152589 2020-1-3 0:00:0 PW No Violations
-807930705 2020-9-2 0:00:0 PW No Violations
-826605535 2018-5-15 0:00: PW No Violations 1.00
-880216665 2015-12-17 0:00 PW No Violations
-899610114 2015-11-24 0:00 PW No Violations
0143727494 2015-05-28 Production Wells No Violations Myself, Tom Hill and Rick Anderson inspected the site. We found the stockpiled soil from the oil spill clean-up has not been removed. The reclamation still needs to be completed.
0313611087 2015-05-05 Production Wells No Violations My inspection of the pile of oil saturated soil from the oil spill clean-up still remains near the original spill location. I have not received a response from Bob Barr Sr. from my phone call to him upon my last inspection on 3-30-2015.
0538026613 2015-08-19 Production Wells No Violations I was on location for a compliance notice follow-up inspection. During my inspection, I found the stockpiled soil from the oil spill not removed. There is a backhoe parked on top of the stockpile. The west end of the stockpile has small pools of oil. Photos were taken and available upon request.
0582837911 2017-10-30 Production Wells No Violations I inspected this well location as part of legal proceedings. As such, the following deficiencies had been noted previously: leakage of oil from the wellhead that had impacted the areas surrounding the wellhead and migrated to an adjacent tributary stream as well as a small, farm pond, as well as improper storage/disposal of oil-impacted soils, and clean-up materials, which had been stockpiled or otherwise left on site following mitigation and clean-up activity.. At the time of this inspection, I noted the following: a wellhead with closure swage and 2-inch hard-line flow connection located in a relatively level, open farm field. The flow-line valve was closed. There was a small pile of gravel and gravelly soils adjacent to the wellhead. There was no visible or discernible signs of oil leakage or impact in the areas surrounding the wellhead. The battery was comprised of one 100-barrel, steel production tank and horizontal separator, which was surrounding by mature grasses which obscured much of the battery. I did not observe any obvious signs of oil or impacted areas in or around the area of the tank battery, or along the course of the flow-line. I walked the areas surrounding the pond, and walked the upstream course of the small tributary stream, between the pond and the wellhead and found no discernible evidence of impacts. There was some portions of left-over storm culvert. There were several areas of disturbed soils from remedial excavation that require re-grading. I observed no other signs of discarded soil or remnant debris from clean-up activity. ID signage was present but not complete (lacking complete API permit #).
0594909935 2015-11-23 Production Wells No Violations I was on site to witness the removal of 12 yards of material from the oil spill in December of 2014.
0626209028 2015-03-30 Production Wells No Violations I walked to the spill location to find the stockpiled soil from the oil spill clean-up is still on sight. I called Bob Barr Sr. and left a message telling him to remove oil saturated soil and complete the restoration from the spill clean-up.
0826605535 2018-05-15 Production Wells No Violations I inspected this well pursuant to open compliance violations. At the time of this inspection, I noted the following: a wellhead with closure swage and 2-inch hard-line flow connection located in a open portion of a level field. The flow-line valve was closed. The battery was comprised of one 100-barrel, steel production tank and horizontal separator. The tank was empty. I did not observe any obvious signs of oil or impacted areas in or around the area of the tank battery, or along the course of the flow-line. There was a chart recorder that was not active. There were no signs the well was being produced. Areas previously disturbed by remediation activity had not been re-graded or restored completely. There was a discarded half-round steel tank that needed removed.
0880216665 2015-12-17 Production Wells No Violations I was on site to take photos of the remaining stockpiled soil and of the lime spread over the area where the soil had been removed.
0899610114 2015-11-24 Production Wells No Violations I was on site to witness the removal of 20 yards of material from the oil spill in December of 2014. I had the company dig four test holes in the remaining stockpiled soil from the clean-up operations and could find no more oil saturated soil at this time. The remaining remedial work of reclaiming the disturbed areas from the oil spill clean-up should be done when the weather conditions permit the remedial work. NOTE: A total of 56 yards of material was removed from the oil spill site.
1088241694 2016-12-22 Production Wells No Violations My inspection of this well found the company has failed to complete the restoration in the disturbed area from the oil spill clean-up.
1156442221 2017-02-17 Production Wells No Violations Myself, Tom Hill, Rick Anderson, Terry Whitehair and Gene Park with ODNR Division of Oil & Gas met with Bob Barr Sr., Charles Mosco and Gino Pulito with Big Sky Energy on site to discuss the required remedial work needed to comply with the compliance issues with this well.
1171589355 2015-10-23 Production Wells No Violations I was on site to find the company had moved a steel half tank on site. Upon inspection of the tank I found several holes in the bottom of the tank. The company had planned to place the oil saturated soil in the tank to move it to the road to be removed from the site. I denied them from using the tank due to the integrity of the tank. I then left the site.
1394312027 2014-12-11 Production Wells No Violations I arrived on site to find the spill origin had a earthen dike around it. There was a brine truck by pond and workers were vacuuming the oil from the surface of the pond. There was also workers working down stream removing the oil.
1440689181 2015-08-26 Production Wells No Violations On site with Reggie Brown (OEPA) and Steve Tompkins (DOGRM Inspector), inspection of the spill area confirmed that the operator had started redistributing the soil stockpile from the oil spill clean-up operations, against direction of DOGRM, OEPA and Federal EPA. Reggie Brown (OEPA) indicated that additional soil redistribution had taken place after the operator was order to stop redistribution by OEPA. Operator has yet to submit a restoration plan to the DOGRM nor the OEPA, as agreed that Big Sky Energy Inc. would do on the inspection conducted 07/09/2015 (Big Sky Inc. agreed to submit a restoration plan by O9/15/15 to the Division for review.) During that inspection the operator was informed by DOGRM and OEPA that soil testing could be completed by the operator and if sections of the stockpile tested clean, the clean soil could be redistributed. No test results for soil sampling have been received by the DOGRM or the OEPA. Review of the affected pond during the inspection revealed that an oil sheen is still evident when the ponds edges are disturbed. Debris from the siphon dams constructed on the north edge of the pond remains on location. Debris from the first siphon dam in the stream remains on location, there is one culvert pipe still in the stream under the remaining portion of the dam. One culvert pipe on the bank of the stream and one further down stream. A sheet of plywood and t-posts remain from the second siphon dam in the stream. Brush, small trees and stumps that were removed and stockpiled during the initial clean-up effort are still on location and need to be addressed.
1458743221 2015-10-08 Production Wells No Violations I was on site to witness the pressure test on the flow line. The company pressured the flow line with the pressure from the well to 56 PSI. They held the pressure for 15 minutes with no loss of pressure. The pressure test passed.
1463591095 2015-08-31 Production Wells No Violations No change on location. Operator has taken no additional actions to reclaim the location. Well was located during this inspection. Well is an open flow well, 4 swage reduced to two inch nipple attaching it to the flow line.
1624710363 2018-03-12 UrbanProduction Wells No Violations I inspected this well pursuant to Chiefs Order #2016-300 issued for lack of insurance. The well and associated battery are located on a rural parcel. At the time of this inspection, I noted the following: a wellhead with closure swage and 2-inch hard-line flow connection located in a open portion of a level field. The flow-line valve was closed. There was no visible or discernible signs of oil leakage or impact in the areas surrounding the wellhead, which were covered in several inches of snow. The battery was comprised of one 100-barrel, steel production tank and horizontal separator. The tank was empty. I did not observe any obvious signs of oil or impacted areas in or around the area of the tank battery, or along the course of the flow-line. There was a chart recorder that was not active. There were no signs the well was being produced.
1705775389 2016-03-18 Production Wells No Violations I was accompanied by Jen Barret, Dan Martin, Mike Williams [ Attorney Generals Office ], Rick Anderson and Tom Hill [ ODNR Division of Oil & Gas ]. Upon arrival we found there was a new chart on the gas meter with the date of 3-16-2016 wrote on it. The chart indicated the well was in production at the time of the inspection. We then walked to the oil spill location and discussed the reclamation that was needed. I took a photo of the chart on the gas meter.
1861835780 2016-09-12 Production Wells No Violations My inspection of the area that the soil from the oil spill clean-up had been stockpiled had been roughly graded, also the hole that the company created from building the syphon dam had not been filled in. The work that had been done was not sufficient enough to resolve the remedial work needed.
1871976658 2015-10-14 Production Wells No Violations I arrived on site to find there has been reclamation work done at the syphon dam location north-east of overflow of the pond and at the end of the stream where the oil had flowed. More reclamation is needed in both of these areas.
1875528880 2015-11-20 Production Wells No Violations I was on site to witness the removal of the oil saturated soil from the oil spill in December of 2014. The company was using a backhoe to move the soil from the oil spill location to a dump truck at Sheffield road. The dump truck then transported the soil to Big Skys yard located north of route 307 and east of route 11. The soil was placed on a plastic liner with a dike constructed from 8.625 steel casing surrounding the area. The dump truck was able to move four yards of material per load. I witnessed the removal of 24 yards of soil. I then left the site.
1890863746 2015-09-18 Production Wells No Violations I was on site to witness the excavation of the flow at the area the line had leaked. Upon the excavation of the gas line we found there was a 5 section removed from the gas line. The company workers then replaced the missing section of the gas line. We then closed the gas line in at the tank battery and the well and attempted to pressure test the line with the well pressure. They were unable to pressure up on the gas line to properly test the line. The company will test the gas line when enough pressure builds up in the well.
2068928948 2014-12-09 Production Wells Violations Noted I received a phone call from Darren Sable on 12-8-2014 in the evening. He told me the oil company that owns the well on his property had a oil spill which had entered a small pond and then traveled down stream for some distance. I met Darren at the well the next morning when he showed me the location of the origin of the oil spill. I witnessed oil on the ground in the lease road about 1000 south of the tank battery location. The oil covered an area 70X 20 and had traveled about 50 in a ditch where the oil had entered a small pond, the oil had then flowed to the overflow of the pond and entered a small stream. I walked down stream 800- 1000 to find small puddles of oil had been caught in debris in the stream in about 10 different spots. The amount of oil down stream was a very small amount. The amount of oil spilt from the flow line leak was about 2-3 barrels. Reggie Brown with the EPA then arrived and I walked with him to the oil spill origin. We discussed the clean-up procedures the company needed to perform to remediate the oil spill. The stream and pond clean-up was under EPAs authority. Bob Barr Jr. arrived and myself and Reggie Brown discussed with Bob the clean-up needed . The end result was to remove all oil from the spill origin, the pond and the stream and dispose of in an approved manner. Note: The coordinates of the spill origin are 41.82597, -80.63139 and the coordinates of the end of oil found in the stream are 41.82885, -80.63056..
2101897558 2015-07-09 Production Wells No Violations Myself, Tom Hill [ ODNR Division of Oil & Gas ], Rick Anderson [ ODNR Division of Oil & Gas ], Reggie Brown [ Ohio EPA ], Bob Barr Sr. and his attorney [ Big Sky Energy ] met on site. We walked over the disturbed area created from the oil spill in December of 2014. We discussed the remediation needed to correct the pending violations
538026613 2015-8-19 0:00: PW No Violations
626209028 2015-3-30 0:00: PW No Violations

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
2068928948 US-OH-121095 2017-01-31 Inadequate pipeline strength
2068928948 US-OH-121096 2017-01-31 Well operation causing pollution and contamination

For data sources see[9]