X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-007-20172

Well Details

Well ID: 34-007-20172
Loading map...
Country: United States
State: Ohio
County: Ashtabula
Municipality: Monroe Township
Operator Name: CLARENCE K TUSSEL JR LTD
Well Pad ID:
Farm/Lease Name: HUMPHREY RUSSELL
License Status: Producing
License Date: 1962-01-26
Spud Date: 1962-01-19
Spud Drilling Contractor:
Final Drill Date: 1962-02-19
Well Total Depth: 3257.00 ft
Configuration: Vertical
Latitude: 41.840000
Longitude: -80.600000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Original Spud 1962-01-19 GL=847.7
Completed 1962-02-19 GL=847.7
Reached Total Depth 1962-02-19 GL=847.7
Record Last Modified 2013-10-03 GL=847.7

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-11 3142 3143 3
3142 3143 3
3142 3143 3

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 600 Bbl 20000
ACID 0 1000 Gal 22000 24 HRS.

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1985 TUSSEL CLARENCE JR 273.00 0.00 0
1986 TUSSEL CLARENCE JR 2472.00 39.00 365
1987 TUSSEL CLARENCE JR 2771.00 0.00 365
1988 TUSSEL CLARENCE JR 2767.00 57.00 365
1990 TUSSEL CLARENCE JR 2569.00 0.00 365
1991 TUSSEL CLARENCE JR 2318.00 58.00 365
1992 TUSSEL CLARENCE JR 2337.00 0.00 365
1993 TUSSEL CLARENCE JR 2118.00 56.00 365
1995 TUSSEL CLARENCE JR 1219.00 0.00 365
1996 TUSSEL CLARENCE JR 979.00 59.00 365
1997 TUSSEL CLARENCE JR 440.00 0.00 365
1998 TUSSEL CLARENCE JR 1275.00 30.00 365
1999 TUSSEL CLARENCE JR 1218.00 37.00 365
2000 TUSSEL CLARENCE JR 832.00 0.00 365
2001 TUSSEL CLARENCE JR 1151.00 0.00 365
2002 TUSSEL CLARENCE JR 2053.00 94.00 365
2003 TUSSEL CLARENCE JR 1565.00 0.00 365
2004 TUSSEL CLARENCE JR 1351.00 0.00 365
2005 TUSSEL CLARENCE JR 1408.00 46.00 365
2006 TUSSEL CLARENCE JR 1366.00 0.00 365
2007 TUSSEL CLARENCE JR 1792.00 35.00 365
2008 TUSSEL CLARENCE JR 1279.00 0.00 365
2009 TUSSEL CLARENCE JR 1547.00 0.00 365
2010 TUSSEL CLARENCE JR 1789.00 37.00 365
2011 TUSSEL CLARENCE JR 1647.00 0.00 365
2012 TUSSEL CLARENCE JR 1351.00 0.00 366
2013 TUSSEL CLARENCE JR 1198.00 0.00 365
2014 TUSSEL CLARENCE JR 1246.00 0.00 365
2015 TUSSEL CLARENCE JR 1207.00 0.00 365
2016 TUSSEL CLARENCE JR 1081.00 0.00 365
2017 TUSSEL CLARENCE JR 943.00 0.00 365
2018 TUSSEL CLARENCE JR 761.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1985 TUSSEL CLARENCE JR Brine 0 0
1986 TUSSEL CLARENCE JR Brine 0 365
1987 TUSSEL CLARENCE JR Brine 0 365
1988 TUSSEL CLARENCE JR Brine 0 365
1990 TUSSEL CLARENCE JR Brine 0 365
1991 TUSSEL CLARENCE JR Brine 9 365
1992 TUSSEL CLARENCE JR Brine 37 365
1993 TUSSEL CLARENCE JR Brine 35 365
1995 TUSSEL CLARENCE JR Brine 28 365
1996 TUSSEL CLARENCE JR Brine 16 365
1997 TUSSEL CLARENCE JR Brine 0 365
1998 TUSSEL CLARENCE JR Brine 48 365
1999 TUSSEL CLARENCE JR Brine 20 365
2000 TUSSEL CLARENCE JR Brine 41 365
2001 TUSSEL CLARENCE JR Brine 27 365
2002 TUSSEL CLARENCE JR Brine 11 365
2003 TUSSEL CLARENCE JR Brine 0 365
2004 TUSSEL CLARENCE JR Brine 0 365
2005 TUSSEL CLARENCE JR Brine 24 365
2006 TUSSEL CLARENCE JR Brine 0 365
2007 TUSSEL CLARENCE JR Brine 26 365
2008 TUSSEL CLARENCE JR Brine 0 365
2009 TUSSEL CLARENCE JR Brine 0 365
2010 TUSSEL CLARENCE JR Brine 32 365
2011 TUSSEL CLARENCE JR Brine 0 365
2012 TUSSEL CLARENCE JR Brine 22 366
2013 TUSSEL CLARENCE JR Brine 12 365
2014 TUSSEL CLARENCE JR Brine 0 365
2015 TUSSEL CLARENCE JR Brine 56 365
2016 TUSSEL CLARENCE JR Brine 0 365
2017 TUSSEL CLARENCE JR Brine 28 365
2018 TUSSEL CLARENCE JR Brine 0 365

For data sources see[7] [8]

References