If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-005-23061 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.89,"lon":-82.15,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Ashland | |
Municipality: Perry Township | |
Operator Name: MILLER ROY/R A MILLER ENERGY L | |
Well Pad ID: | |
Farm/Lease Name: AUSTIN CLARK & THELMA | |
License Status: Final Restoration | |
License Date: 2006-07-05 | |
Spud Date: 1975-07-05 | |
Spud Drilling Contractor: | |
Final Drill Date: 1975-08-02 | |
Well Total Depth: 670.00 ft | |
Configuration: Vertical | |
Latitude: 40.890000 | |
Longitude: -82.150000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1975-04-21 | 133 QUAKER STATE OIL REF CORP GeoDate 4/21/75 |
Enhanced Recovery | 1975-04-21 | Issued Date 4/21/75 Expired Date Acres 0000000 Tool Type RTAF Proposed Formation BEDFORD Proposed Depth 00000 Proposed Drill Depth 00000 |
Original Spud | 1975-07-05 | RE-ISSUE 4-23-75 |
Completed | 1975-08-02 | RE-ISSUE 4-23-75 |
Reached Total Depth | 1975-08-02 | RE-ISSUE 4-23-75 |
Completion Report Received | 1976-03-23 | RE-ISSUE 4-23-75 |
CO | 1995-10-18 | 182 BELDEN & BLAKE CO GeoDate 4/21/75 |
Change of Owner | 2002-02-07 | Operator changed from 182, BELDEN & BLAKE CORPORATION to 2491, MILLER ROY/RA MILLER ENER |
APP | 2006-07-05 | Proposed Formations:BEREA, Issued Date:7/5/2006, Expired Date:7/5/2007 6:00:00 AM, Drilling unit acres:0, Proposed Well Type:EOR, Proposed Well Class:ERP |
Plugged/Abandoned | 2006-11-09 | RE-ISSUE 4-23-75 |
Construction Permit Expires | 2007-07-05 | RE-ISSUE 4-23-75 |
Record Last Modified | 2013-05-23 | RE-ISSUE 4-23-75 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 564 | 678 | 0 |
2006-09-11 | 604 | 614 | 0 |
564 | 678 | 0 | |
564 | 678 | 0 | |
2006-09-11 | 619 | 626 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
Not Treated | 0 | 20 Qts | 0 | |||
Not Treated | 0 | 228 Qts | 0 | |||
Not Treated | 0 | 14 Qts | 0 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2006 | MILLER ROY/R A MILLER ENERGY L | 0.00 | 0.00 | 0 |
2007 | DEEP RESOURCES LLC | 0.00 | 61.00 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2006 | MILLER ROY/R A MILLER ENERGY L | Brine | 0 | 0 |
2007 | DEEP RESOURCES LLC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1072004460 | 2005-4-27 0:00: | ER | No Violations | 0.50 |
-1091218352 | 2006-4-27 0:00: | ER | No Violations | 1.00 |
-431425239 | 2005-12-16 0:00 | ER | No Violations | 0.50 |
-683161936 | 2007-6-19 0:00: | FR | No Violations | 1.00 |
0017670976 | 2004-11-17 | Enhanced Recovery Project | No Violations | Injection thru 2 tubing. |
0431425239 | 2005-12-16 | Enhanced Recovery Project | No Violations | Injection pressure test. Well needs 1 tubing and packer installed. Advised Len Rex to install before next inspection. |
0683161936 | 2007-06-19 | Final Restoration | No Violations | Final restoration approved. Rain, 80 degrees. |
0708911930 | 2004-04-22 | Enhanced Recovery Project | No Violations | Injection pressure test. Injecting thru 2 tubing. No annular space. RBDMS shows well plugged, but is active. |
1072004460 | 2005-04-27 | Enhanced Recovery Project | No Violations | Injection well test. This well has 2 injection tubing only. |
1091218352 | 2006-04-27 | Enhanced Recovery Project | No Violations | Injection and annulus pressure test. This well is shut in on 2 tubing.Formation pressure is 100 psi. No 1 injection tubing in well. Planning to have well plugged. |
17670976 | 2004-11-17 0:00 | ER | No Violations | |
708911930 | 2004-4-22 0:00: | ER | No Violations | |
iDIAN00007 | 1998-08-20 | Final Restoration | No Violations | |
iDIAN000074 | 1998-8-20 0:00: | FR | No Violations |
For data sources see[9]