X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1206083001000

Well Details

Well ID: 1206083001000
Loading map...
Location: 00/01-30-120-08W6/0
Location Alias: 00/01-30-20-08 W6M
Location Alias 2: 00/01-30-120-08 W6/00
Country: Canada
Province: Alberta
Township: 120
Meridian: 6
Range: 08
Section: 30
County/Municipality: Mackenzie County
Well Name: BRCL AMIGO 1-30-120-8
Operator Name: ConocoPhillips Canada Operations ULC
License Number: 0221255
License Date: 1999-02-05
License Status: RecCertified
Spud Date: 1999-02-18
Final Drill Date: 1999-03-12
Well Total Depth: 1920.00 m
Surface Hole Latitude: 59.447957
Surface Hole Longitude: -119.353757

For data sources see[1][2]

Well History

Date Event
1999-02-05 Obtained License
1999-02-05 Well Log Performed
1999-02-18 Surface Casing Operation Performed
1999-02-26 Direction Drilling Operation Performed - Deviate
1999-03-08 Intermediate Casing Operation Performed
1999-03-11 Well Log Performed
1999-03-12 Finished Drilling
1999-03-14 Liner Casing Operation Performed
1999-03-15 Rig Released
1999-03-15 Well Mode changed to Drilled and Cased
1999-03-19 Well Log Performed
1999-03-20 Perforation Treatment Performed - Jet Perforation
1999-03-20 Well Log Performed
1999-03-22 Perforation Treatment Performed - Jet Perforation
1999-03-22 Well Log Performed
1999-03-22 Well Mode changed to Drilled and Cased
2002-03-04 Well Began Production
2002-03-04 Well Fluid changed to Gas
2002-03-04 Well Mode changed to Flowing
2004-03-01 Well Fluid changed to Gas
2004-03-01 Well Mode changed to Suspended
2004-03-02 Well Log Performed
2008-03-07 Well Log Performed
2008-03-09 Perforation Treatment Performed - Cement Squeeze
2008-03-09 Plug Back Performed
2008-03-09 Well Fluid changed to Gas
2008-03-09 Well Mode changed to Abandoned Zone
2008-03-10 Well Log Performed
2008-03-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-03-11 Perforation Treatment Performed - Jet Perforation
2008-03-11 Plug Back Performed
2008-03-11 Well Log Performed
2008-03-12 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2008-03-13 Perforation Treatment Performed - Jet Perforation
2008-03-13 Well Log Performed
2008-03-14 Perforation Treatment Performed - Remedial Casing
2009-01-28 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1999-02-26 1153.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-03-20 Perforation 1772.00 1775.00 17
1999-03-22 Perforation 1591.00 1595.00 17
2008-03-09 Cement Squeeze 1772.00 1775.00 0
2008-03-09 Cement Squeeze 1591.00 1595.00 0
2008-03-11 Packing Device Capped w/Cement 1575.00 1583.00 0
2008-03-11 Perforation 587.00 589.00 20
2008-03-12 Packing Dev Cpd w/Res-Gyp Cem 578.10 589.30 0
2008-03-13 Perforation 491.50 493.50 20
2008-03-14 Remedial Casing Cementing 491.50 493.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 1934 0.0 0.0 0.0
2003 3729 0.0 0.0 0.0
2004 930 0.0 0.0 0.0

For data sources see[6]

References