Well Details

Well ID: 1126070901000
Loading map...
Location: 00/01-09-112-07W6/0
Location Alias: 00/01-09-12-07 W6M
Location Alias 2: 00/01-09-112-07 W6/00
Country: Canada
Province: Alberta
Township: 112
Meridian: 6
Range: 07
Section: 09
County/Municipality: Mackenzie County
Well Name: SCARLET FIRE 1-9-112-7
Operator Name: Advantage Oil & Gas Ltd.
License Number: 0035810
License Date: 1969-02-13
License Status: RecCertified
Spud Date: 1969-02-15
Final Drill Date: 1969-03-15
Well Total Depth: 1892.80 m
Surface Hole Latitude: 58.704070
Surface Hole Longitude: -119.100629

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-02-13 Obtained License
1969-03-01 Drill Stem Test Performed
1969-03-06 Drill Stem Test Performed
1969-03-15 Finished Drilling
1969-03-15 Well Mode changed to Drilled and Cased
1969-03-17 Drill Stem Test Performed
1969-03-18 Liner Casing Operation Performed
1969-03-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-03-20 Perforation Treatment Performed - Jet Perforation
1969-03-21 Well Began Production
1969-03-21 Well Fluid changed to Crude Oil
1969-03-21 Well Mode changed to Flowing
1973-03-10 Well Fluid changed to Crude Oil
1973-03-10 Well Mode changed to Suspended
1980-06-20 Well Fluid changed to Crude Oil
1980-06-20 Well Mode changed to Pumping
1986-03-07 Well Fluid changed to Crude Oil
1986-03-07 Well Mode changed to Suspended
1991-02-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-02-18 Perforation Treatment Performed - Jet Perforation
1991-02-18 Plug Back Performed
1991-02-18 Well Fluid changed to Crude Oil
1991-02-18 Well Mode changed to Abandoned Zone
2001-03-01 Well Log Performed
2001-03-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-03-03 Perforation Treatment Performed - Jet Perforation
2001-03-03 Plug Back Performed
2001-03-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-03-04 Plug Back Performed
2002-02-05 Well Log Performed
2002-02-10 Perforation Treatment Performed - Jet Perforation
2002-02-12 Perforation Treatment Performed - Remedial Casing
2003-01-19 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-03-20 Perforation 1516.70 1526.70 7
2002-02-12 Remedial Casing Cementing 400.00 401.00 0
1969-03-20 Acid Treatment 1516.70 1526.70 0
1991-02-18 Packing Device Capped w/Cement 1468.00 1474.00 0
1991-02-18 Perforation 1448.00 1450.00 7
1991-02-18 Perforation 1452.00 1454.50 7
2001-03-03 Packing Device Capped w/Cement 1429.00 1437.00 0
2001-03-03 Perforation 762.00 763.00 14
2001-03-04 Packing Device Capped w/Cement 760.00 761.00 0
2002-02-10 Perforation 400.00 401.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1969 0 0.0 0.0 0.0
1970 2663 0.0 0.0 0.0
1971 1710 0.0 0.0 0.0
1972 2043 0.0 0.0 0.0
1973 63 0.0 0.0 0.0
1980 2622 0.0 0.0 0.0
1981 3874 0.0 0.0 0.0
1982 318 0.0 0.0 0.0
1983 6840 0.0 0.0 0.0
1984 8170 0.0 0.0 0.0
1985 7768 0.0 0.0 0.0
1986 349 0.0 0.0 0.0

For data sources see[5]