X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1126060211000

Well Details

Well ID: 1126060211000
Loading map...
Location: 00/11-02-112-06W6/0
Location Alias: 00/11-02-12-06 W6M
Location Alias 2: 00/11-02-112-06 W6/00
Country: Canada
Province: Alberta
Township: 112
Meridian: 6
Range: 06
Section: 02
County/Municipality: Mackenzie County
Well Name: MOBIL VIEW RAIN 11-2-112-6
Operator Name: ExxonMobil Canada Ltd.
License Number: 0033697
License Date: 1968-02-20
License Status: RecCertified
Spud Date: 1968-02-21
Final Drill Date: 1968-03-22
Well Total Depth: 1661.20 m
Surface Hole Latitude: 58.698410
Surface Hole Longitude: -118.889169

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-02-20 Obtained License
1968-03-10 Drill Stem Test Performed
1968-03-13 Drill Stem Test Performed
1968-03-17 Drill Stem Test Performed
1968-03-22 Finished Drilling
1968-03-22 Well Mode changed to Drilled and Cased
1968-03-24 Production Casing Operation Performed
1968-12-30 Perforation Treatment Performed - Jet Perforation
1968-12-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-01-04 Perforation Treatment Performed - Cement Squeeze
1969-01-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-01-12 Perforation Treatment Performed - Jet Perforation
1969-02-17 Well Began Production
1969-02-17 Well Fluid changed to Crude Oil
1969-02-17 Well Mode changed to Flowing
1969-08-25 Well Fluid changed to Crude Oil
1969-08-25 Well Mode changed to Suspended
1985-01-09 Well Fluid changed to Crude Oil
1985-01-09 Well Mode changed to Flowing
1985-02-28 Perforation Treatment Performed - Jet Perforation
1985-02-28 Well Log Performed
1985-03-01 Perforation Treatment Performed - Fractured
1985-03-05 Well Log Performed
1985-03-25 Well Fluid changed to Crude Oil
1985-03-25 Well Mode changed to Suspended
1991-01-19 Well Fluid changed to Crude Oil
1991-01-19 Well Mode changed to Flowing
1993-03-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-03-06 Perforation Treatment Performed - Cement Plug
1993-03-06 Plug Back Performed
1993-03-11 Well Log Performed
1993-03-12 Perforation Treatment Performed - Jet Perforation
1993-03-12 Perforation Treatment Performed - Remedial Casing
1993-03-12 Well Fluid changed to Crude Oil
1993-03-12 Well Log Performed
1993-03-12 Well Mode changed to Abandoned
1993-03-15 Well Abandoned
1993-04-11 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-12-30 Perforation 1405.70 1407.60 7
1985-02-28 Perforation 1405.70 1411.80 13
1985-03-01 Fracture 1405.70 1464.60 0
1993-03-06 Packing Device Capped w/Cement 1365.00 1373.00 0
1993-03-06 Cement Plug 922.00 952.00 0
1993-03-12 Perforation 363.00 364.00 10
1993-03-12 Remedial Casing Cementing 363.00 364.00 0
1968-12-30 Perforation 1407.60 1408.80 3
1968-12-31 Acid Treatment 1405.70 1408.80 0
1969-01-04 Cement Squeeze 1405.70 1408.80 0
1969-01-12 Perforation 1418.20 1421.30 7
1969-01-12 Acid Treatment 1418.20 1421.30 0
1985-02-28 Perforation 1463.00 1464.60 13
1985-02-28 Perforation 1454.80 1456.60 13
1985-02-28 Perforation 1436.80 1439.90 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1969 0 0.0 0.0 0.0
1985 595 0.0 0.0 0.0
1991 298 0.0 0.0 0.0

For data sources see[5]

References