X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1116072012000

Well Details

Well ID: 1116072012000
Loading map...
Location: 00/12-20-111-07W6/0
Location Alias: 00/12-20-11-07 W6M
Location Alias 2: 00/12-20-111-07 W6/00
Country: Canada
Province: Alberta
Township: 111
Meridian: 6
Range: 07
Section: 20
County/Municipality: Mackenzie County
Well Name: TOURNEX RAINBOW 12-20-111-7
Operator Name: Raimount Energy Corp.
License Number: 0105715
License Date: 1984-02-03
License Status: Abandoned
Spud Date: 1984-02-11
Final Drill Date: 1984-02-24
Well Total Depth: 1608.00 m
Surface Hole Latitude: 58.655105
Surface Hole Longitude: -119.148852

For data sources see[1][2]

Well History

Date Event
1984-02-03 Obtained License
1984-02-11 Lost Circulation Occurred
1984-02-23 Lost Circulation Occurred
1984-02-24 Finished Drilling
1984-02-24 Well Mode changed to Drilled and Cased
1984-02-25 Well Log Performed
1984-02-26 Production Casing Operation Performed
1984-03-12 Well Log Performed
1984-03-13 Perforation Treatment Performed - Jet Perforation
1984-03-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-03-23 Well Began Production
1984-03-23 Well Fluid changed to Crude Oil
1984-03-23 Well Mode changed to Pumping
1992-08-21 Well Fluid changed to Crude Oil
1992-08-21 Well Mode changed to Suspended
1993-02-13 Perforation Treatment Performed - Jet Perforation
1993-02-13 Well Log Performed
1993-02-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-02-25 Well Fluid changed to Crude Oil
1993-02-25 Well Mode changed to Pumping
1994-02-28 Perforation Treatment Performed - Bridge Plug No Cement Required
1994-02-28 Plug Back Performed
1994-02-28 Well Fluid changed to Crude Oil
1994-02-28 Well Mode changed to Abandoned and Whipstocked
1998-08-08 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-03-13 Perforation 1581.50 1584.00 7
1984-03-14 Acid Treatment 1581.50 1584.00 0
1993-02-13 Perforation 1563.00 1569.00 13
1993-02-14 Acid Treatment 1563.00 1569.00 0
1994-02-28 Bridge Plug, No Cement 1554.00 1554.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 3296 0.0 0.0 0.0
1985 4870 0.0 0.0 0.0
1986 5837 0.0 0.0 0.0
1987 6872 0.0 0.0 0.0
1988 8302 0.0 0.0 0.0
1989 8254 0.0 0.0 0.0
1990 8329 0.0 0.0 0.0
1991 4365 0.0 0.0 0.0
1993 1092 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1984-02-11 Lost Circulation 74.00 163.00
1984-02-23 Lost Circulation 1585.80 1590.10

For data sources see[6]

References