X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1116070409002

Well Details

Well ID: 1116070409002
Loading map...
Location: 00/09-04-111-07W6/2
Location Alias: 00/09-04-11-07 W6M
Location Alias 2: 00/09-04-111-07 W6/02
Country: Canada
Province: Alberta
Township: 111
Meridian: 6
Range: 07
Section: 04
County/Municipality: Mackenzie County
Well Name: TOURNEX RAINBOW 9-4-111-7
Operator Name: Raimount Energy Corp.
License Number: 0033936
License Date: 1968-03-28
License Status: Suspension
Spud Date: 1968-04-02
Final Drill Date: 1968-04-28
Well Total Depth: 1790.70 m
Surface Hole Latitude: 58.611961
Surface Hole Longitude: -119.105486

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-03-28 Obtained License
1968-04-26 Drill Stem Test Performed
1968-04-28 Finished Drilling
1968-04-29 Liner Casing Operation Performed
1968-05-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-05-12 Perforation Treatment Performed - Jet Perforation
1973-08-13 Perforation Treatment Performed - Cement Squeeze
1973-08-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-08-26 Perforation Treatment Performed - Jet Perforation
1987-07-16 Perforation Treatment Performed - Cement Squeeze
1987-07-19 Perforation Treatment Performed - Jet Perforation
1987-07-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-03-29 Well Log Performed
1991-03-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-03-30 Perforation Treatment Performed - Jet Perforation
1991-03-30 Perforation Treatment Performed - Remedial Casing
1991-03-30 Plug Back Performed
1991-03-30 Well Mode changed to Drilled and Cased
1991-06-21 Well Log Performed
1991-07-13 Well Log Performed
1991-12-16 Well Began Injection
1991-12-16 Well Fluid changed to Water
1991-12-16 Well Type changed to Disposal
1994-03-01 Well Fluid changed to Water
1994-03-01 Well Mode changed to Suspended
1994-03-01 Well Type changed to Disposal
1999-03-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-03-07 Plug Back Performed
1999-03-07 Well Fluid changed to Water
1999-03-07 Well Mode changed to Abandoned Zone
1999-03-07 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-05-12 Perforation 1741.90 1744.10 7
1991-03-30 Packing Device Capped w/Cement 882.00 890.00 0
1991-03-30 Perforation 480.00 480.30 13
1991-03-30 Remedial Casing Cementing 480.00 480.30 0
1999-03-07 Packing Device Capped w/Cement 702.00 710.00 0
1968-05-12 Acid Treatment 1741.90 1744.10 0
1973-08-13 Cement Squeeze 1741.90 1744.10 0
1973-08-26 Perforation 1738.30 1739.80 7
1973-08-26 Acid Treatment 1738.30 1739.80 0
1987-07-16 Cement Squeeze 1738.30 1739.80 0
1987-07-19 Perforation 1738.30 1739.80 7
1987-07-20 Acid Treatment 1738.30 1739.80 0
1991-03-30 Perforation 722.00 725.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0

For data sources see[5]

References