X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1116052714000

Well Details

Well ID: 1116052714000
Loading map...
Location: 00/14-27-111-05W6/0
Location Alias: 00/14-27-11-05 W6M
Location Alias 2: 00/14-27-111-05 W6/00
Country: Canada
Province: Alberta
Township: 111
Meridian: 6
Range: 05
Section: 27
County/Municipality: Mackenzie County
Well Name: TOURNEX RAINBOW 14-27-111-5
Operator Name: Raimount Energy Corp.
License Number: 0283114
License Date: 2003-02-20
License Status: Abandoned
Spud Date: 2003-03-11
Final Drill Date: 2003-03-18
Well Total Depth: 1571.00 m
Surface Hole Latitude: 58.670734
Surface Hole Longitude: -118.747537

For data sources see[1][2]

Well History

Date Event
2003-02-20 Obtained License
2003-03-13 Surface Casing Operation Performed
2003-03-18 Finished Drilling
2003-03-18 Well Log Performed
2003-03-18 Well Mode changed to Drilled and Cased
2003-03-19 Production Casing Operation Performed
2003-03-19 Rig Released
2003-03-20 Perforation Treatment Performed - Jet Perforation
2003-03-20 Well Log Performed
2003-03-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-03-21 Well Began Production
2003-03-21 Well Fluid changed to Crude Oil
2003-03-21 Well Mode changed to Pumping
2005-01-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-01-06 Perforation Treatment Performed - Jet Perforation
2005-01-06 Plug Back Performed
2005-01-06 Well Fluid changed to Crude Oil
2005-01-06 Well Log Performed
2005-01-06 Well Mode changed to Abandoned Zone
2005-01-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-01-26 Perforation Treatment Performed - Jet Perforation
2005-01-26 Well Log Performed
2005-03-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-03-10 Plug Back Performed
2005-03-10 Well Log Performed
2005-03-17 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-03-20 Perforation 1511.50 1514.50 17
2005-03-10 Packing Device Capped w/Cement 332.00 340.00 0
2003-03-20 Perforation 1507.00 1510.00 17
2003-03-20 Perforation 1504.00 1505.50 17
2003-03-20 Perforation 1500.50 1502.00 17
2003-03-21 Acid Treatment 1500.50 1514.50 0
2005-01-06 Packing Device Capped w/Cement 1480.00 1488.00 0
2005-01-06 Perforation 345.00 346.00 17
2005-01-20 Acid Treatment 345.00 346.00 0
2005-01-26 Perforation 346.00 348.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 2330 0.0 0.0 0.0

For data sources see[5]

References