If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 1106062411000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":58.565948,"lon":-118.854156,"icon":""}]} |
Location: 00/11-24-110-06W6/0 | |
Location Alias: 00/11-24-10-06 W6M | |
Location Alias 2: 00/11-24-110-06 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 110 | |
Meridian: 6 | |
Range: 06 | |
Section: 24 | |
County/Municipality: Mackenzie County | |
Well Name: MOBIL PRISM RAIN 11-24-110-6 | |
Operator Name: ExxonMobil Canada Ltd. | |
License Number: 0034608 | |
License Date: 1968-08-09 | |
License Status: RecExempt | |
Spud Date: 1968-08-22 | |
Final Drill Date: 1968-09-13 | |
Well Total Depth: 1837.90 m | |
Surface Hole Latitude: 58.565948 | |
Surface Hole Longitude: -118.854156 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1968-08-09 | Obtained License |
1968-09-13 | Finished Drilling |
1968-09-15 | Drill Stem Test Performed |
1968-09-17 | Drill Stem Test Performed |
1968-09-18 | Well Abandoned |
1968-09-18 | Well Mode changed to Abandoned |
2000-02-20 | Plug Back Performed |
2000-02-21 | Plug Back Performed |
2001-02-16 | Production Casing Operation Performed |
2001-03-30 | Well Log Performed |
2002-03-16 | Well Log Performed |
2002-03-19 | Perforation Treatment Performed - Jet Perforation |
2002-03-19 | Well Log Performed |
2002-03-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-03-22 | Perforation Treatment Performed - Cement Squeeze |
2002-03-23 | Perforation Treatment Performed - Jet Perforation |
2002-03-23 | Well Log Performed |
2002-03-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2002-03-24 | Perforation Treatment Performed - Cement Squeeze |
2002-03-25 | Perforation Treatment Performed - Bridge Plug No Cement Required |
2002-03-25 | Perforation Treatment Performed - Jet Perforation |
2002-03-25 | Well Log Performed |
2002-03-28 | Perforation Treatment Performed - Cement Squeeze |
2002-03-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2013-02-15 | Well Log Performed |
2013-02-24 | Well Log Performed |
2013-03-06 | Perforation Treatment Performed - Jet Perforation |
2013-03-06 | Well Log Performed |
2013-03-08 | Perforation Treatment Performed - Cement Plug |
2013-03-08 | Perforation Treatment Performed - Remedial Casing |
2013-03-08 | Plug Back Performed |
2013-03-09 | Well Log Performed |
2013-03-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2013-03-10 | Perforation Treatment Performed - Jet Perforation |
2013-03-10 | Perforation Treatment Performed - Remedial Casing |
2013-03-10 | Well Log Performed |
2013-03-11 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2002-03-19 | Perforation | 465.50 | 466.50 | 17 |
2002-03-29 | Packing Device Capped w/Cement | 198.30 | 205.20 | 0 |
2013-03-06 | Perforation | 251.00 | 252.00 | 17 |
2013-03-06 | Perforation | 218.00 | 219.00 | 17 |
2013-03-08 | Remedial Casing Cementing | 218.00 | 252.00 | 0 |
2013-03-08 | Cement Plug | 215.50 | 261.70 | 0 |
2013-03-10 | Perforation | 201.00 | 202.00 | 17 |
2013-03-10 | Remedial Casing Cementing | 201.00 | 202.00 | 0 |
2013-03-10 | Packing Device Capped w/Cement | 190.60 | 215.00 | 0 |
2013-03-10 | Packing Device Capped w/Cement | 180.00 | 190.00 | 0 |
2002-03-22 | Cement Squeeze | 465.50 | 466.50 | 0 |
2002-03-22 | Packing Device Capped w/Cement | 448.00 | 460.00 | 0 |
2002-03-23 | Perforation | 338.50 | 339.50 | 17 |
2002-03-24 | Cement Squeeze | 338.50 | 339.50 | 0 |
2002-03-24 | Packing Device Capped w/Cement | 328.90 | 344.00 | 0 |
2002-03-25 | Perforation | 218.50 | 220.50 | 17 |
2002-03-25 | Bridge Plug, No Cement | 225.00 | 225.10 | 0 |
2002-03-28 | Cement Squeeze | 218.50 | 220.50 | 0 |
For data sources see[4]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2001-02-19 | No Incident Encountered | 0.00 | 0.00 |
2013-03-12 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[5]