1096093405000

Well Details

Well ID: 1096093405000
Loading map...
Location: 00/05-34-109-09W6/0
Location Alias: 00/05-34-09-09 W6M
Location Alias 2: 00/05-34-109-09 W6/00
Country: Canada
Province: Alberta
Township: 109
Meridian: 6
Range: 09
Section: 34
County/Municipality: Rainbow Lake
Well Name: HUSKY PURCELL RAIN 5-34-109-9
Operator Name: Husky Oil Operations Limited
License Number: 0350332
License Date: 2006-01-27
License Status: Abandoned
Spud Date: 2006-03-29
Final Drill Date: 2006-04-22
Well Total Depth: 1965.00 m
Surface Hole Latitude: 58.504101
Surface Hole Longitude: -119.420613

For data sources see[1][2]

Well History

Date Event
2006-01-27 Obtained License
2006-03-31 Surface Casing Operation Performed
2006-04-04 Lost Circulation Occurred
2006-04-17 Well Log Performed
2006-04-18 Lost Circulation Occurred
2006-04-19 Intermediate Casing Operation Performed
2006-04-22 Finished Drilling
2006-04-23 Plug Back Performed
2006-04-23 Well Log Performed
2006-04-23 Well Mode changed to Abandoned
2006-04-25 Rig Released
2006-09-11 Well Log Performed
2009-01-17 Well Log Performed
2010-03-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-03-29 Perforation Treatment Performed - Jet Perforation
2010-03-29 Well Log Performed
2010-03-30 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-03-31 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-04-01 Perforation Treatment Performed - Remedial Casing
2010-04-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-04-02 Perforation Treatment Performed - Jet Perforation
2010-04-02 Well Log Performed
2010-04-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-04-04 Perforation Treatment Performed - Remedial Casing
2010-05-19 Perforation Treatment Performed - Jet Perforation
2010-05-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-05-28 Perforation Treatment Performed - Remedial Casing
2010-10-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-10-01 Perforation Treatment Performed - Jet Perforation
2010-10-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-10-03 Perforation Treatment Performed - Remedial Casing
2010-10-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-10-04 Perforation Treatment Performed - Jet Perforation
2010-10-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-10-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-10-06 Perforation Treatment Performed - Remedial Casing
2010-10-07 Perforation Treatment Performed - Jet Perforation
2010-10-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-10-08 Perforation Treatment Performed - Remedial Casing
2011-06-14 Well Log Performed
2011-07-09 Well Log Performed
2011-07-11 Perforation Treatment Performed - Jet Perforation
2011-07-12 Perforation Treatment Performed - Cement Plug
2011-07-12 Perforation Treatment Performed - Remedial Casing
2011-07-12 Plug Back Performed
2011-09-20 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-03-29 Packing Device Capped w/Cement 1127.00 1135.00 0
2010-05-19 Perforation 971.00 973.00 20
2010-05-27 Acid Treatment 971.00 973.00 0
2010-05-28 Remedial Casing Cementing 971.00 973.00 0
2010-10-01 Packing Device Capped w/Cement 956.50 964.50 0
2010-10-01 Packing Device Capped w/Cement 745.50 753.50 0
2010-10-01 Perforation 542.00 543.00 20
2010-10-02 Acid Treatment 542.00 543.00 0
2010-10-03 Remedial Casing Cementing 542.00 543.00 0
2010-10-04 Packing Device Capped w/Cement 530.10 538.10 0
2010-10-04 Perforation 516.00 517.00 20
2010-03-29 Perforation 1113.50 1114.50 17
2010-10-05 Acid Treatment 516.00 517.00 0
2010-10-06 Remedial Casing Cementing 516.00 517.00 0
2010-10-06 Packing Device Capped w/Cement 470.70 505.00 0
2010-10-07 Perforation 410.00 412.00 17
2010-10-08 Acid Treatment 410.00 412.00 0
2010-10-08 Remedial Casing Cementing 410.00 412.00 0
2011-07-11 Perforation 24.00 26.00 17
2011-07-12 Remedial Casing Cementing 24.00 26.00 0
2011-07-12 Cement Plug 9.40 26.00 0
2010-03-30 Acid Treatment 1113.50 1114.50 0
2010-03-31 Acid Treatment 1113.50 1114.50 0
2010-04-01 Remedial Casing Cementing 1113.50 1114.50 0
2010-04-02 Packing Device Capped w/Cement 1100.70 1110.50 0
2010-04-02 Perforation 761.50 763.50 17
2010-04-03 Acid Treatment 761.50 763.50 0
2010-04-04 Remedial Casing Cementing 761.50 763.50 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2006-04-04 Lost Circulation 525.00 576.00
2006-04-18 Lost Circulation 1789.00 1789.00

For data sources see[5]