X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1096081509000

Well Details

Well ID: 1096081509000
Loading map...
Location: 00/09-15-109-08W6/0
Location Alias: 00/09-15-09-08 W6M
Location Alias 2: 00/09-15-109-08 W6/00
Country: Canada
Province: Alberta
Township: 109
Meridian: 6
Range: 08
Section: 15
County/Municipality: Mackenzie County
Well Name: HUSKY B UNIT RAIN 9-15-109-8
Operator Name: Husky Oil Operations Limited
License Number: 0044025
License Date: 1972-11-01
License Status: Issued
Spud Date: 1972-11-10
Final Drill Date: 1972-11-26
Well Total Depth: 1876.50 m
Surface Hole Latitude: 58.464154
Surface Hole Longitude: -119.229710

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1972-11-01 Obtained License
1972-11-20 Lost Circulation Occurred
1972-11-23 Lost Circulation Occurred
1972-11-24 Production Casing Operation Performed
1972-11-26 Finished Drilling
1972-11-26 Perforation Treatment Performed - Open-Hole Completion
1972-11-26 Well Mode changed to Drilled and Cased
1972-11-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-12-05 Well Began Production
1972-12-05 Well Fluid changed to Crude Oil
1972-12-05 Well Mode changed to Flowing
1983-03-20 Perforation Treatment Performed - Cement Plug
1983-03-20 Perforation Treatment Performed - Jet Perforation
1983-03-20 Perforation Treatment Performed - Open-Hole Completion
1983-03-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-03-31 Well Began Injection
1983-03-31 Well Fluid changed to Solvent
1983-03-31 Well Type changed to Injection
1993-08-25 Perforation Treatment Performed - Open-Hole Completion
1993-08-25 Well Log Performed
1993-08-27 Well Log Performed
1993-08-28 Perforation Treatment Performed - Cement Plug
1993-09-01 Perforation Treatment Performed - Open-Hole Completion
1993-09-02 Liner Casing Operation Performed
1993-09-02 Perforation Treatment Performed - Jet Perforation
1993-09-06 Well Log Performed
1993-09-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-10-07 Well Log Performed
2002-01-10 Perforation Treatment Performed - Cement Squeeze
2002-01-14 Perforation Treatment Performed - Jet Perforation
2002-01-14 Well Log Performed
2002-01-18 Perforation Treatment Performed - Cement Squeeze
2002-01-21 Perforation Treatment Performed - Jet Perforation
2002-01-21 Well Log Performed
2002-01-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-01-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-01-25 Perforation Treatment Performed - Jet Perforation
2002-01-25 Well Log Performed
2002-01-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-01-29 Well Log Performed
2002-07-17 Well Fluid changed to Water
2002-07-17 Well Type changed to Injection
2002-08-28 Well Fluid changed to Solvent
2002-08-28 Well Type changed to Injection
2003-06-19 Well Log Performed
2003-11-03 Well Fluid changed to Water
2003-11-03 Well Type changed to Injection
2003-12-05 Well Fluid changed to Solvent
2003-12-05 Well Type changed to Injection
2004-02-18 Well Fluid changed to Water
2004-02-18 Well Type changed to Injection
2004-03-18 Well Fluid changed to Solvent
2004-03-18 Well Type changed to Injection
2004-05-27 Well Fluid changed to Water
2004-05-27 Well Type changed to Injection
2004-06-30 Well Fluid changed to Solvent
2004-06-30 Well Type changed to Injection
2004-09-15 Well Fluid changed to Water
2004-09-15 Well Type changed to Injection
2004-10-27 Well Fluid changed to Solvent
2004-10-27 Well Type changed to Injection
2005-01-07 Well Fluid changed to Water
2005-01-07 Well Type changed to Injection
2005-02-16 Well Fluid changed to Solvent
2005-02-16 Well Type changed to Injection
2005-04-08 Well Fluid changed to Water
2005-04-08 Well Type changed to Injection
2005-05-10 Well Fluid changed to Solvent
2005-05-10 Well Type changed to Injection
2005-06-09 Well Log Performed
2005-06-10 Well Log Performed
2005-06-13 Perforation Treatment Performed - Jet Perforation
2005-06-13 Well Log Performed
2005-06-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-06-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-06-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-06-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-06-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-06-20 Perforation Treatment Performed - Cement Squeeze
2005-06-24 Perforation Treatment Performed - Jet Perforation
2005-06-24 Well Log Performed
2005-06-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-06-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-06-28 Perforation Treatment Performed - Cement Squeeze
2005-07-02 Perforation Treatment Performed - Jet Perforation
2005-07-02 Well Log Performed
2005-07-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-07-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-07-07 Perforation Treatment Performed - Cement Squeeze
2005-07-11 Perforation Treatment Performed - Jet Perforation
2005-07-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-07-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-07-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-07-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-07-19 Perforation Treatment Performed - Jet Perforation
2005-07-19 Well Log Performed
2005-07-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-09-08 Well Fluid changed to Water
2005-09-08 Well Type changed to Injection
2005-10-07 Well Fluid changed to Solvent
2005-10-07 Well Type changed to Injection
2005-12-08 Well Fluid changed to Water
2005-12-08 Well Type changed to Injection
2006-01-10 Well Fluid changed to Solvent
2006-01-10 Well Type changed to Injection
2006-05-10 Well Fluid changed to Water
2006-05-10 Well Type changed to Injection
2006-06-06 Well Fluid changed to Gas
2006-06-06 Well Type changed to Injection
2006-11-09 Well Fluid changed to Water
2006-11-09 Well Type changed to Injection
2006-12-14 Well Fluid changed to Gas
2006-12-14 Well Type changed to Injection
2007-01-29 Well Fluid changed to Water
2007-01-29 Well Type changed to Injection
2007-03-07 Well Fluid changed to Gas
2007-03-07 Well Type changed to Injection
2007-05-08 Well Fluid changed to Water
2007-05-08 Well Type changed to Injection
2007-06-18 Well Fluid changed to Gas
2007-06-18 Well Type changed to Injection
2007-08-21 Well Fluid changed to Water
2007-08-21 Well Type changed to Injection
2007-09-07 Well Log Performed
2007-09-25 Well Fluid changed to Gas
2007-09-25 Well Type changed to Injection
2007-11-27 Well Fluid changed to Water
2007-11-27 Well Type changed to Injection
2007-12-20 Well Fluid changed to Gas
2007-12-20 Well Type changed to Injection
2008-03-19 Well Fluid changed to Water
2008-03-19 Well Type changed to Injection
2008-04-30 Well Fluid changed to Gas
2008-04-30 Well Type changed to Injection
2008-07-08 Well Fluid changed to Water
2008-07-08 Well Type changed to Injection
2008-11-15 Well Fluid changed to Gas
2008-11-15 Well Type changed to Injection
2009-01-06 Well Fluid changed to Water
2009-01-06 Well Type changed to Injection
2009-01-27 Well Fluid changed to Gas
2009-01-27 Well Type changed to Injection
2009-05-30 Well Log Performed
2011-05-13 Perforation Treatment Performed - Multi-Stage Fracture
2011-05-13 Well Log Performed
2013-06-02 Well Log Performed
2017-06-18 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1972-11-26 Open Hole/Barefoot Completion 1758.70 1770.90 0
1993-09-02 Perforation 1756.00 1760.50 13
1993-09-02 Perforation 1773.00 1776.50 13
1993-09-02 Perforation 1782.50 1785.50 13
1993-09-02 Perforation 1791.50 1794.50 13
1993-09-09 Acid Treatment 1756.00 1794.50 0
2002-01-10 Cement Squeeze 1756.00 1870.30 0
2002-01-14 Perforation 1821.00 1824.00 13
2002-01-14 Perforation 1812.00 1815.00 13
2002-01-14 Perforation 1802.00 1805.50 13
2002-01-18 Cement Squeeze 1802.00 1824.00 0
1972-11-29 Acid Treatment 1758.70 1770.90 0
2002-01-21 Perforation 1821.50 1824.00 13
2002-01-21 Perforation 1812.50 1814.50 13
2002-01-21 Perforation 1802.00 1805.00 13
2002-01-22 Acid Treatment 1821.50 1824.00 0
2002-01-23 Acid Treatment 1821.50 1824.00 0
2002-01-23 Acid Treatment 1812.50 1814.50 0
2002-01-23 Acid Treatment 1802.00 1805.00 0
2002-01-25 Perforation 1761.00 1767.00 13
2002-01-25 Perforation 1756.00 1761.00 13
2002-01-26 Acid Treatment 1756.00 1767.00 0
1983-03-20 Cement Plug 1762.70 1770.90 0
2002-01-26 Acid Treatment 1756.00 1767.00 0
2005-06-13 Perforation 1850.00 1854.00 13
2005-06-13 Perforation 1838.50 1843.00 13
2005-06-13 Perforation 1829.00 1834.00 13
2005-06-13 Perforation 1820.00 1825.00 13
2005-06-14 Acid Treatment 1850.00 1854.00 0
2005-06-15 Acid Treatment 1838.50 1843.00 0
2005-06-16 Acid Treatment 1829.00 1834.00 0
2005-06-17 Acid Treatment 1820.00 1825.00 0
2005-06-18 Acid Treatment 1756.00 1757.00 0
1983-03-20 Open Hole/Barefoot Completion 1758.70 1762.70 0
2005-06-20 Cement Squeeze 1756.00 1824.00 0
2005-06-24 Perforation 1850.00 1854.00 13
2005-06-24 Perforation 1838.50 1843.00 13
2005-06-24 Perforation 1829.00 1834.00 13
2005-06-24 Perforation 1820.00 1825.00 13
2005-06-25 Acid Treatment 1850.00 1854.00 0
2005-06-26 Acid Treatment 1838.50 1843.00 0
2005-06-26 Acid Treatment 1829.00 1834.00 0
2005-06-26 Acid Treatment 1820.00 1825.00 0
2005-06-28 Cement Squeeze 1820.00 1854.00 0
1983-03-20 Perforation 1758.50 1762.40 13
2005-07-02 Perforation 1850.00 1854.00 13
2005-07-02 Perforation 1838.50 1843.00 13
2005-07-02 Perforation 1829.00 1834.00 13
2005-07-02 Perforation 1820.00 1825.00 13
2005-07-03 Acid Treatment 1850.00 1854.00 0
2005-07-05 Acid Treatment 1838.50 1843.00 0
2005-07-07 Cement Squeeze 1838.50 1854.00 0
2005-07-11 Perforation 1850.00 1854.00 13
2005-07-11 Perforation 1839.00 1843.00 13
2005-07-11 Perforation 1829.00 1833.50 13
1983-03-23 Acid Treatment 1758.50 1762.70 0
2005-07-11 Perforation 1820.00 1824.50 13
2005-07-12 Acid Treatment 1850.00 1854.00 0
2005-07-13 Acid Treatment 1839.00 1843.00 0
2005-07-17 Acid Treatment 1829.00 1833.50 0
2005-07-18 Acid Treatment 1820.00 1824.50 0
2005-07-19 Perforation 1771.00 1776.00 13
2005-07-19 Perforation 1762.00 1767.00 13
2005-07-19 Perforation 1756.00 1762.00 13
2005-07-20 Acid Treatment 1771.00 1776.00 0
2005-07-20 Acid Treatment 1756.00 1767.00 0
1993-08-25 Open Hole/Barefoot Completion 1758.70 1876.50 0
2011-05-13 Multi-Stage Fracture 1834.00 1834.10 0
1993-08-28 Cement Plug 1723.40 1876.50 0
1993-09-01 Open Hole/Barefoot Completion 1758.70 1870.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1972 638 0.0 0.0 0.0
1973 8393 0.0 0.0 0.0
1974 8513 0.0 0.0 0.0
1975 8043 0.0 0.0 0.0
1976 5580 0.0 0.0 0.0
1977 5623 0.0 0.0 0.0
1978 6772 0.0 0.0 0.0
1979 7850 0.0 0.0 0.0
1980 7088 0.0 0.0 0.0
1981 8613 0.0 0.0 0.0
1982 1498 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1972-11-20 Lost Circulation 1621.50 1621.50
1972-11-23 Lost Circulation 1758.60 1758.60

For data sources see[6]

References