X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1096081508000

Well Details

Well ID: 1096081508000
Loading map...
Location: 00/08-15-109-08W6/0
Location Alias: 00/08-15-09-08 W6M
Location Alias 2: 00/08-15-109-08 W6/00
Country: Canada
Province: Alberta
Township: 109
Meridian: 6
Range: 08
Section: 15
County/Municipality: Mackenzie County
Well Name: HUSKY ET AL RAINBOW 8-15-109-8
Operator Name: Husky Oil Operations Limited
License Number: 0095139
License Date: 1982-02-17
License Status: Issued
Spud Date: 1982-02-17
Final Drill Date: 1982-04-16
Well Total Depth: 1880.00 m
Surface Hole Latitude: 58.461329
Surface Hole Longitude: -119.231533

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-02-17 Obtained License
1982-03-03 Blow Occurred
1982-04-16 Finished Drilling
1982-04-16 Well Mode changed to Drilled and Cased
1982-04-20 Drill Stem Test Performed
1982-04-21 Drill Stem Test Performed
1982-04-22 Drill Stem Test Performed
1982-04-23 Liner Casing Operation Performed
1982-04-30 Perforation Treatment Performed - Jet Perforation
1982-05-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-05-20 Well Began Production
1982-05-20 Well Fluid changed to Crude Oil
1982-05-20 Well Mode changed to Flowing
1984-06-20 Perforation Treatment Performed - Jet Perforation
1984-06-29 Perforation Treatment Performed - Cement Squeeze
1984-07-02 Perforation Treatment Performed - Jet Perforation
1984-07-05 Perforation Treatment Performed - Jet Perforation
1984-07-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-07-08 Perforation Treatment Performed - Cement Squeeze
1984-07-11 Perforation Treatment Performed - Jet Perforation
1984-07-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-07-15 Perforation Treatment Performed - Jet Perforation
1984-07-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-07-20 Perforation Treatment Performed - Jet Perforation
1985-06-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-06-25 Perforation Treatment Performed - Cement Squeeze
1985-06-28 Perforation Treatment Performed - Jet Perforation
1985-06-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-02-24 Perforation Treatment Performed - Cement Squeeze
1990-02-28 Perforation Treatment Performed - Jet Perforation
1990-03-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-03-04 Perforation Treatment Performed - Jet Perforation
1990-03-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-12-05 Perforation Treatment Performed - Jet Perforation
1993-12-05 Well Log Performed
1993-12-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-11-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-11-11 Perforation Treatment Performed - Chemical Squeeze
1996-01-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-01-13 Perforation Treatment Performed - Cement Squeeze
1996-01-16 Perforation Treatment Performed - Jet Perforation
1996-01-22 Perforation Treatment Performed - Jet Perforation
1996-01-22 Well Log Performed
1996-01-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-01-26 Well Log Performed
1996-01-27 Perforation Treatment Performed - Cement Squeeze
1996-02-04 Well Log Performed
1996-02-05 Perforation Treatment Performed - Jet Perforation
1996-02-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-02-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-02-10 Perforation Treatment Performed - Jet Perforation
1996-02-10 Well Log Performed
2003-02-02 Well Log Performed
2004-01-21 Perforation Treatment Performed - Cement Squeeze
2004-01-27 Perforation Treatment Performed - Jet Perforation
2004-01-27 Well Log Performed
2004-02-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-02-02 Perforation Treatment Performed - Jet Perforation
2004-02-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-02-04 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-04-30 Perforation 1769.50 1775.50 13
1984-07-11 Perforation 1796.00 1801.00 13
1984-07-11 Perforation 1787.50 1790.00 13
1984-07-13 Acid Treatment 1812.00 1816.00 0
1984-07-13 Acid Treatment 1787.50 1790.00 0
1984-07-15 Perforation 1785.00 1787.50 13
1984-07-16 Acid Treatment 1796.00 1801.00 0
1984-07-16 Acid Treatment 1785.00 1790.00 0
1984-07-20 Perforation 1779.00 1781.50 13
1985-06-24 Acid Treatment 1779.00 1801.00 0
1985-06-25 Cement Squeeze 1779.00 1790.00 0
1982-05-01 Acid Treatment 1769.50 1775.50 0
1985-06-28 Perforation 1782.50 1786.00 13
1985-06-29 Acid Treatment 1782.50 1786.00 0
1990-02-24 Cement Squeeze 1782.50 1816.00 0
1990-02-28 Perforation 1791.50 1794.50 13
1990-02-28 Perforation 1797.50 1799.50 13
1990-03-01 Acid Treatment 1797.50 1799.50 0
1990-03-04 Perforation 1803.00 1805.00 13
1990-03-05 Acid Treatment 1803.00 1805.00 0
1993-12-05 Perforation 1771.50 1772.50 13
1993-12-06 Acid Treatment 1771.50 1772.50 0
1984-06-20 Perforation 1812.00 1816.00 13
1994-11-11 Acid Treatment 1791.50 1794.50 0
1994-11-11 Chemical Squeeze 1791.50 1794.50 0
1996-01-12 Acid Treatment 1791.50 1794.50 0
1996-01-13 Cement Squeeze 1771.50 1799.50 0
1996-01-16 Perforation 1812.00 1816.00 13
1996-01-22 Perforation 1805.00 1807.00 13
1996-01-22 Perforation 1812.00 1816.00 13
1996-01-22 Perforation 1821.00 1824.00 13
1996-01-24 Acid Treatment 1805.00 1824.00 0
1996-01-27 Cement Squeeze 1805.00 1816.00 0
1984-06-29 Cement Squeeze 1769.50 1775.50 0
1996-02-05 Perforation 1805.00 1807.00 13
1996-02-05 Perforation 1812.00 1816.00 13
1996-02-05 Perforation 1827.00 1829.00 13
1996-02-08 Acid Treatment 1805.00 1829.00 0
1996-02-10 Perforation 1771.50 1772.50 13
1996-02-10 Acid Treatment 1771.50 1772.50 0
2004-01-21 Cement Squeeze 1771.50 1829.00 0
2004-01-27 Perforation 1838.00 1840.00 13
2004-01-27 Perforation 1849.00 1852.00 13
2004-01-27 Perforation 1857.00 1860.00 13
1984-07-02 Perforation 1796.00 1801.00 13
2004-01-27 Perforation 1864.00 1866.00 13
2004-02-01 Acid Treatment 1838.00 1866.00 0
2004-02-02 Perforation 1771.50 1772.50 13
2004-02-03 Acid Treatment 1771.50 1772.50 0
1984-07-02 Perforation 1787.50 1790.00 13
1984-07-05 Perforation 1781.00 1785.00 13
1984-07-07 Acid Treatment 1787.50 1801.00 0
1984-07-08 Cement Squeeze 1781.00 1801.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 5166 0.0 0.0 0.0
1983 8627 0.0 0.0 0.0
1984 4973 0.0 0.0 0.0
1985 4147 0.0 0.0 0.0
1986 8433 0.0 0.0 0.0
1987 8570 0.0 0.0 0.0
1988 7951 0.0 0.0 0.0
1989 291 0.0 0.0 0.0
1990 6364 0.0 0.0 0.0
1991 7737 0.0 0.0 0.0
1992 7897 0.0 0.0 0.0
1993 7578 0.0 0.0 0.0
1994 5186 0.0 0.0 0.0
1995 7067 0.0 0.0 0.0
1996 7673 0.0 0.0 0.0
1997 8745 0.0 0.0 0.0
1998 4967 0.0 0.0 0.0
1999 5 0.0 0.0 0.0
2000 8 0.0 0.0 0.0
2004 5864 0.0 0.0 0.0
2005 3754 0.0 0.0 0.0
2006 1712 0.0 0.0 0.0
2007 270 0.0 0.0 0.0
2008 3347 0.0 0.0 0.0
2009 3630 0.0 0.0 0.0
2010 8711 0.0 0.0 0.0
2011 7551 0.0 0.0 0.0
2012 8653 0.0 0.0 0.0
2013 7654 0.0 0.0 0.0
2014 6969 0.0 0.0 0.0
2015 8046 0.0 0.0 0.0
2016 8010 0.0 0.0 0.0
2017 7980 0.0 0.0 0.0
2018 8081 0.0 0.0 0.0
2019 7570 0.0 0.0 0.0
2020 2018 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1982-03-03 Blow 1782.00 1782.00

For data sources see[6]

References