1096081502000

Well Details

Well ID: 1096081502000
Loading map...
Location: 00/02-15-109-08W6/0
Location Alias: 00/02-15-09-08 W6M
Location Alias 2: 00/02-15-109-08 W6/00
Country: Canada
Province: Alberta
Township: 109
Meridian: 6
Range: 08
Section: 15
County/Municipality: Mackenzie County
Well Name: HUSKY ET AL RAINBOW 2-15-109-8
Operator Name: Husky Oil Operations Limited
License Number: 0151045
License Date: 1991-12-13
License Status: Issued
Spud Date: 1992-01-08
Final Drill Date: 1992-01-28
Well Total Depth: 1901.00 m
Surface Hole Latitude: 58.459664
Surface Hole Longitude: -119.235336

For data sources see[1][2]

Well History

Date Event
1991-12-13 Obtained License
1992-01-10 Surface Casing Operation Performed
1992-01-14 Lost Circulation Occurred
1992-01-24 Well Log Performed
1992-01-26 Production Casing Operation Performed
1992-01-28 Finished Drilling
1992-01-28 Perforation Treatment Performed - Open-Hole Completion
1992-01-28 Well Log Performed
1992-01-28 Well Mode changed to Drilled and Cased
1992-01-29 Well Log Performed
1992-02-01 Well Log Performed
1992-02-02 Rig Released
1992-02-05 Well Log Performed
1992-02-15 Perforation Treatment Performed - Cement Plug
1992-02-19 Perforation Treatment Performed - Open-Hole Completion
1992-02-23 Liner Casing Operation Performed
1992-02-23 Perforation Treatment Performed - Cement Squeeze
1992-02-29 Perforation Treatment Performed - Jet Perforation
1992-03-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-03-05 Perforation Treatment Performed - Jet Perforation
1992-03-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-03-07 Well Log Performed
1992-03-09 Well Began Production
1992-03-09 Well Fluid changed to Crude Oil
1992-03-09 Well Mode changed to Flowing
1998-02-23 Liner Casing Operation Performed
1998-02-23 Perforation Treatment Performed - Open-Hole Completion
1998-11-30 Perforation Treatment Performed - Cement Squeeze
1998-12-05 Perforation Treatment Performed - Jet Perforation
1998-12-05 Well Log Performed
1998-12-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-12-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-12-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-12-08 Perforation Treatment Performed - Jet Perforation
1998-12-08 Well Log Performed
1998-12-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-12-10 Well Log Performed
2001-07-19 Well Began Injection
2001-07-19 Well Fluid changed to Water
2001-07-19 Well Type changed to Injection
2001-08-02 Well Fluid changed to Crude Oil
2001-08-02 Well Mode changed to Flowing
2007-01-24 Well Fluid changed to Crude Oil
2007-01-24 Well Mode changed to Suspended
2011-05-14 Well Log Performed
2011-08-20 Perforation Treatment Performed - Remedial Casing
2011-08-24 Perforation Treatment Performed - Jet Perforation
2011-08-24 Well Log Performed
2011-08-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-08-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-08-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-08-30 Perforation Treatment Performed - Jet Perforation
2011-08-30 Well Log Performed
2011-08-31 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-09-01 Perforation Treatment Performed - Jet Perforation
2011-09-01 Well Log Performed
2011-09-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-09-03 Well Log Performed
2011-10-03 Well Fluid changed to Crude Oil
2011-10-03 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-01-28 Open Hole/Barefoot Completion 1771.60 1901.00 0
1992-03-06 Acid Treatment 1800.50 1804.50 0
1998-02-23 Open Hole/Barefoot Completion 1900.00 1901.00 0
1998-11-30 Cement Squeeze 1809.50 1812.50 0
1998-11-30 Cement Squeeze 1800.50 1804.50 0
1998-11-30 Cement Squeeze 1793.00 1796.00 0
1998-11-30 Cement Squeeze 1778.00 1781.00 0
1998-12-05 Perforation 1837.00 1838.00 13
1998-12-05 Perforation 1828.00 1830.00 13
1998-12-05 Perforation 1821.00 1822.00 13
1998-12-05 Perforation 1815.50 1816.50 13
1992-02-15 Cement Plug 1771.60 1901.00 0
1998-12-05 Perforation 1810.00 1811.50 13
1998-12-05 Perforation 1778.00 1779.00 13
1998-12-06 Acid Treatment 1837.00 1838.00 0
1998-12-06 Acid Treatment 1828.00 1830.00 0
1998-12-07 Acid Treatment 1821.00 1822.00 0
1998-12-07 Acid Treatment 1815.50 1816.50 0
1998-12-07 Acid Treatment 1810.00 1811.50 0
1998-12-08 Perforation 1837.00 1840.00 13
1998-12-08 Acid Treatment 1837.00 1840.00 0
1998-12-09 Acid Treatment 1837.00 1840.00 0
1992-02-19 Open Hole/Barefoot Completion 1771.60 1901.00 0
2011-08-20 Remedial Casing Cementing 1837.00 1840.00 0
2011-08-20 Remedial Casing Cementing 1828.00 1830.00 0
2011-08-20 Remedial Casing Cementing 1821.00 1822.00 0
2011-08-20 Remedial Casing Cementing 1815.50 1816.50 0
2011-08-20 Remedial Casing Cementing 1810.00 1811.50 0
2011-08-20 Remedial Casing Cementing 1778.00 1779.00 0
2011-08-24 Perforation 1863.50 1864.50 13
2011-08-24 Perforation 1858.00 1859.00 13
2011-08-24 Perforation 1851.00 1852.00 13
2011-08-24 Perforation 1845.00 1846.00 13
1992-02-23 Cement Squeeze 1771.60 1901.00 0
2011-08-25 Acid Treatment 1863.50 1864.50 0
2011-08-27 Acid Treatment 1858.00 1859.00 0
2011-08-28 Acid Treatment 1851.00 1852.00 0
2011-08-28 Acid Treatment 1845.00 1846.00 0
2011-08-30 Perforation 1778.00 1779.00 13
2011-08-31 Acid Treatment 1778.00 1779.00 0
2011-09-01 Perforation 1793.00 1794.00 13
2011-09-02 Acid Treatment 1793.00 1794.00 0
1992-02-29 Perforation 1778.00 1781.00 13
1992-02-29 Perforation 1793.00 1796.00 13
1992-02-29 Perforation 1809.50 1812.50 13
1992-03-01 Acid Treatment 1809.50 1812.50 0
1992-03-05 Perforation 1800.50 1804.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 6878 0.0 0.0 0.0
1993 8236 0.0 0.0 0.0
1994 8217 0.0 0.0 0.0
1995 8685 0.0 0.0 0.0
1996 8770 0.0 0.0 0.0
1997 8723 0.0 0.0 0.0
1998 4557 0.0 0.0 0.0
1999 1948 0.0 0.0 0.0
2001 3170 0.0 0.0 0.0
2002 3402 0.0 0.0 0.0
2003 2569 0.0 0.0 0.0
2004 265 0.0 0.0 0.0
2005 180 0.0 0.0 0.0
2011 2162 0.0 0.0 0.0
2012 8420 0.0 0.0 0.0
2013 8642 0.0 0.0 0.0
2014 6559 0.0 0.0 0.0
2015 8208 0.0 0.0 0.0
2016 8658 0.0 0.0 0.0
2017 8480 0.0 0.0 0.0
2018 8746 0.0 0.0 0.0
2019 7827 0.0 0.0 0.0
2020 2072 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1992-01-14 Lost Circulation 992.00 992.00

For data sources see[6]