X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1096081104002

Well Details

Well ID: 1096081104002
Loading map...
Location: 00/04-11-109-08W6/2
Location Alias: 00/04-11-09-08 W6M
Location Alias 2: 00/04-11-109-08 W6/02
Country: Canada
Province: Alberta
Township: 109
Meridian: 6
Range: 08
Section: 11
County/Municipality: Mackenzie County
Well Name: HUSKY ET AL RAINBOW 4-11-109-8
Operator Name: Husky Oil Operations Limited
License Number: 0151571
License Date: 1992-01-30
License Status: Suspension
Spud Date: 1992-02-05
Final Drill Date: 1992-02-28
Well Total Depth: 1920.00 m
Surface Hole Latitude: 58.441127
Surface Hole Longitude: -119.222031

For data sources see[1][2]

Well History

Date Event
1992-01-30 Obtained License
1992-02-06 Surface Casing Operation Performed
1992-02-09 Direction Drilling Operation Performed - Deviate
1992-02-09 Lost Circulation Occurred
1992-02-25 Well Log Performed
1992-02-27 Production Casing Operation Performed
1992-02-28 Finished Drilling
1992-02-28 Perforation Treatment Performed - Open-Hole Completion
1992-02-28 Well Mode changed to Drilled and Cased
1992-02-29 Well Log Performed
1992-03-01 Well Log Performed
1992-03-03 Perforation Treatment Performed - Cement Plug
1992-03-03 Rig Released
1992-03-09 Well Log Performed
1992-03-14 Perforation Treatment Performed - Open-Hole Completion
1992-03-16 Perforation Treatment Performed - Cement Plug
1992-03-19 Perforation Treatment Performed - Open-Hole Completion
1992-03-21 Liner Casing Operation Performed
1992-03-21 Perforation Treatment Performed - Cement Squeeze
1992-03-26 Perforation Treatment Performed - Jet Perforation
1992-03-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-09-12 Well Log Performed
1996-09-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-09-14 Perforation Treatment Performed - Cement Squeeze
1996-09-17 Well Log Performed
1996-09-18 Perforation Treatment Performed - Jet Perforation
1996-09-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-09-18 Perforation Treatment Performed - Jet Perforation
2005-09-18 Well Log Performed
2005-10-10 Well Began Production
2005-10-10 Well Fluid changed to Gas
2005-10-10 Well Mode changed to Flowing
2010-11-26 Well Fluid changed to Gas
2010-11-26 Well Mode changed to Suspended
2011-02-14 Well Log Performed
2011-02-15 Perforation Treatment Performed - Cement Squeeze
2011-03-03 Perforation Treatment Performed - Cement Squeeze
2011-03-08 Perforation Treatment Performed - Jet Perforation
2011-03-08 Well Log Performed
2011-03-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-03-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-03-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-03-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-03-18 Perforation Treatment Performed - Jet Perforation
2011-03-18 Well Log Performed
2011-03-19 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1992-02-09 878.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-02-28 Open Hole/Barefoot Completion 1806.70 1920.00 0
1992-03-26 Perforation 1846.00 1848.00 13
1992-03-27 Acid Treatment 1842.00 1848.00 0
1996-09-13 Acid Treatment 1832.50 1848.00 0
1996-09-14 Cement Squeeze 1832.50 1848.00 0
1996-09-18 Perforation 1839.00 1840.00 13
1996-09-18 Perforation 1850.00 1852.00 13
1996-09-18 Perforation 1859.00 1861.00 13
1996-09-19 Acid Treatment 1859.00 1861.00 0
1996-09-19 Acid Treatment 1812.50 1815.50 0
2005-09-18 Perforation 1725.00 1726.00 13
1992-03-03 Cement Plug 1806.70 1920.00 0
2011-02-15 Cement Squeeze 1725.00 1726.00 0
2011-03-03 Cement Squeeze 1859.00 1861.00 0
2011-03-03 Cement Squeeze 1812.50 1815.50 0
2011-03-03 Cement Squeeze 1839.00 1840.00 0
2011-03-03 Cement Squeeze 1850.00 1852.00 0
2011-03-08 Perforation 1875.00 1877.00 13
2011-03-08 Perforation 1884.00 1886.00 13
2011-03-08 Perforation 1898.00 1900.00 13
2011-03-08 Perforation 1892.50 1894.50 13
2011-03-09 Acid Treatment 1898.00 1900.00 0
1992-03-14 Open Hole/Barefoot Completion 1806.70 1912.00 0
2011-03-10 Acid Treatment 1892.50 1894.50 0
2011-03-14 Acid Treatment 1884.00 1886.00 0
2011-03-15 Acid Treatment 1875.00 1877.00 0
2011-03-18 Perforation 1814.00 1816.00 13
2011-03-19 Acid Treatment 1814.00 1816.00 0
1992-03-16 Cement Plug 1806.70 1912.00 0
1992-03-19 Open Hole/Barefoot Completion 1806.70 1912.00 0
1992-03-21 Cement Squeeze 1806.70 1912.00 0
1992-03-26 Perforation 1812.50 1815.50 13
1992-03-26 Perforation 1832.50 1834.50 13
1992-03-26 Perforation 1842.00 1844.00 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 1478 0.0 0.0 0.0
2006 7162 0.0 0.0 0.0
2007 293 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1992-02-09 Lost Circulation 878.00 878.00

For data sources see[7]

References