X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1096081015000

Well Details

Well ID: 1096081015000
Loading map...
Location: 00/15-10-109-08W6/0
Location Alias: 00/15-10-09-08 W6M
Location Alias 2: 00/15-10-109-08 W6/00
Country: Canada
Province: Alberta
Township: 109
Meridian: 6
Range: 08
Section: 10
County/Municipality: Mackenzie County
Well Name: HUSKY ET AL RAINBOW 15-10-109-8
Operator Name: Husky Oil Operations Limited
License Number: 0074709
License Date: 1979-03-01
License Status: Suspension
Spud Date: 1979-03-13
Final Drill Date: 1979-04-16
Well Total Depth: 1885.00 m
Surface Hole Latitude: 58.454860
Surface Hole Longitude: -119.240594

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-03-01 Obtained License
1979-03-13 Direction Drilling Operation Performed - 98
1979-04-16 Finished Drilling
1979-04-16 Well Mode changed to Drilled and Cased
1979-04-17 Drill Stem Test Performed
1979-04-20 Drill Stem Test Performed
1979-04-21 Drill Stem Test Performed
1979-04-21 Liner Casing Operation Performed
1979-05-18 Perforation Treatment Performed - Jet Perforation
1979-05-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-05-20 Well Began Production
1979-05-20 Well Fluid changed to Crude Oil
1979-05-20 Well Mode changed to Flowing
1983-06-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-04-20 Perforation Treatment Performed - Cement Squeeze
1984-04-23 Perforation Treatment Performed - Jet Perforation
1984-04-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-04-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-06-19 Well Began Injection
1984-06-19 Well Fluid changed to Solvent
1984-06-19 Well Type changed to Injection
1990-05-15 Perforation Treatment Performed - Jet Perforation
1990-05-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-05-18 Perforation Treatment Performed - Jet Perforation
1990-05-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-05-21 Perforation Treatment Performed - Cement Squeeze
1990-05-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-05-25 Perforation Treatment Performed - Jet Perforation
1990-05-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-05-29 Perforation Treatment Performed - Cement Squeeze
1990-06-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-06-02 Perforation Treatment Performed - Jet Perforation
1990-06-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-08-05 Well Log Performed
1996-08-06 Perforation Treatment Performed - Jet Perforation
1996-08-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-08-08 Well Log Performed
1996-08-10 Perforation Treatment Performed - Cement Squeeze
1996-08-15 Well Log Performed
1996-08-16 Perforation Treatment Performed - Jet Perforation
1996-08-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-08-18 Well Log Performed
1996-08-19 Perforation Treatment Performed - Jet Perforation
1996-08-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-09-01 Well Fluid changed to Crude Oil
1996-09-01 Well Mode changed to Flowing
2004-04-18 Perforation Treatment Performed - Cement Squeeze
2004-05-01 Perforation Treatment Performed - Jet Perforation
2004-05-01 Well Log Performed
2004-05-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-05-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-05-06 Perforation Treatment Performed - Cement Squeeze
2004-05-06 Well Log Performed
2004-05-11 Perforation Treatment Performed - Jet Perforation
2004-05-11 Well Log Performed
2004-05-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-05-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-05-15 Perforation Treatment Performed - Cement Squeeze
2004-05-15 Well Log Performed
2004-05-19 Perforation Treatment Performed - Jet Perforation
2004-05-19 Well Log Performed
2004-05-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-05-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-05-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-05-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-05-24 Perforation Treatment Performed - Jet Perforation
2004-05-24 Well Log Performed
2004-05-25 Well Log Performed
2015-02-02 Perforation Treatment Performed - Cement Squeeze
2015-02-07 Well Log Performed
2015-02-08 Well Log Performed
2015-02-10 Perforation Treatment Performed - Jet Perforation
2015-02-10 Well Log Performed
2015-02-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2015-02-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2015-02-17 Perforation Treatment Performed - Jet Perforation
2015-02-17 Well Log Performed
2015-02-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2015-02-19 Well Log Performed
2018-04-07 Well Fluid changed to Crude Oil
2018-04-07 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1979-03-13 1094.00 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-05-18 Perforation 1773.20 1774.20 7
1984-04-24 Acid Treatment 1773.20 1777.20 0
1984-04-25 Acid Treatment 1773.20 1777.20 0
1990-05-15 Perforation 1781.00 1783.00 13
1990-05-16 Acid Treatment 1781.00 1783.00 0
1990-05-18 Perforation 1788.00 1790.00 13
1990-05-19 Acid Treatment 1788.00 1790.00 0
1990-05-21 Cement Squeeze 1773.20 1790.00 0
1990-05-25 Perforation 1776.00 1779.00 13
1990-05-25 Perforation 1781.00 1783.00 13
1990-05-25 Acid Treatment 1781.00 1783.00 0
1979-05-18 Perforation 1776.20 1777.20 7
1990-05-26 Acid Treatment 1776.00 1783.00 0
1990-05-29 Cement Squeeze 1776.00 1783.00 0
1990-06-02 Perforation 1776.00 1779.00 13
1990-06-02 Perforation 1788.00 1790.00 13
1990-06-02 Acid Treatment 1776.00 1790.00 0
1990-06-03 Acid Treatment 1776.00 1779.00 0
1996-08-06 Perforation 1804.00 1807.00 13
1996-08-06 Perforation 1811.00 1814.00 13
1996-08-06 Perforation 1826.00 1828.00 13
1996-08-08 Acid Treatment 1804.00 1828.00 0
1979-05-18 Perforation 1779.70 1780.70 7
1996-08-10 Cement Squeeze 1776.00 1814.00 0
1996-08-16 Perforation 1804.00 1807.00 13
1996-08-16 Perforation 1811.00 1814.00 13
1996-08-16 Perforation 1832.00 1835.00 13
1996-08-17 Acid Treatment 1832.00 1835.00 0
1996-08-17 Acid Treatment 1804.00 1807.00 0
1996-08-19 Perforation 1778.00 1781.00 13
1996-08-20 Acid Treatment 1778.00 1781.00 0
2004-04-18 Cement Squeeze 1778.00 1835.00 0
2004-05-01 Perforation 1859.00 1862.00 13
1979-05-18 Perforation 1781.70 1782.70 7
2004-05-01 Perforation 1850.00 1853.00 13
2004-05-01 Perforation 1842.50 1845.00 13
2004-05-02 Acid Treatment 1859.00 1862.00 0
2004-05-03 Acid Treatment 1850.00 1853.00 0
2004-05-03 Acid Treatment 1842.50 1845.00 0
2004-05-06 Cement Squeeze 1842.50 1853.00 0
2004-05-11 Perforation 1859.00 1862.00 13
2004-05-11 Perforation 1850.00 1853.00 13
2004-05-11 Perforation 1842.50 1845.00 13
2004-05-12 Acid Treatment 1859.00 1862.00 0
1979-05-19 Acid Treatment 1773.20 1782.70 0
2004-05-12 Acid Treatment 1850.00 1853.00 0
2004-05-13 Acid Treatment 1842.50 1845.00 0
2004-05-15 Cement Squeeze 1842.50 1845.00 0
2004-05-19 Perforation 1859.50 1862.00 13
2004-05-19 Perforation 1850.00 1852.00 13
2004-05-19 Perforation 1843.00 1844.50 13
2004-05-20 Acid Treatment 1859.50 1862.00 0
2004-05-21 Acid Treatment 1859.50 1862.00 0
2004-05-22 Acid Treatment 1843.00 1844.50 0
2004-05-24 Perforation 1778.00 1781.00 13
1983-06-10 Acid Treatment 1773.20 1782.70 0
2004-05-24 Acid Treatment 1778.00 1781.00 0
2015-02-02 Cement Squeeze 1843.00 1844.50 0
2015-02-02 Cement Squeeze 1778.00 1781.00 0
2015-02-10 Perforation 1869.00 1870.00 13
2015-02-10 Perforation 1864.00 1865.00 13
2015-02-10 Perforation 1859.00 1860.00 13
2015-02-13 Acid Treatment 1864.00 1865.00 0
2015-02-15 Acid Treatment 1859.00 1860.00 0
2015-02-15 Acid Treatment 1869.00 1870.00 0
2015-02-17 Perforation 1778.00 1781.00 13
1984-04-20 Cement Squeeze 1773.20 1782.70 0
2015-02-18 Acid Treatment 1778.00 1781.00 0
1984-04-23 Perforation 1773.20 1774.20 13
1984-04-23 Perforation 1776.20 1777.20 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 5352 0.0 0.0 0.0
1980 8567 0.0 0.0 0.0
1981 7132 0.0 0.0 0.0
1982 8427 0.0 0.0 0.0
1983 3682 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1996 2912 0.0 0.0 0.0
1997 8741 0.0 0.0 0.0
1998 8750 0.0 0.0 0.0
1999 4732 0.0 0.0 0.0
2000 6950 0.0 0.0 0.0
2001 2249 0.0 0.0 0.0
2002 1155 0.0 0.0 0.0
2003 965 0.0 0.0 0.0
2004 4003 0.0 0.0 0.0
2005 5639 0.0 0.0 0.0
2006 4498 0.0 0.0 0.0
2010 7215 0.0 0.0 0.0
2011 7404 0.0 0.0 0.0
2012 8629 0.0 0.0 0.0
2013 8743 0.0 0.0 0.0
2014 6270 0.0 0.0 0.0
2015 7060 0.0 0.0 0.0
2016 5073 0.0 0.0 0.0
2017 8444 0.0 0.0 0.0
2018 625 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-02-20 No Incident Encountered 0.00 0.00

For data sources see[7]

References