X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1096081011000

Well Details

Well ID: 1096081011000
Loading map...
Location: 00/11-10-109-08W6/0
Location Alias: 00/11-10-09-08 W6M
Location Alias 2: 00/11-10-109-08 W6/00
Country: Canada
Province: Alberta
Township: 109
Meridian: 6
Range: 08
Section: 10
County/Municipality: Mackenzie County
Well Name: HUSKY MOBIL RANIBOW 11-10-109-8
Operator Name: Husky Oil Operations Limited
License Number: 0154913
License Date: 1992-12-02
License Status: Issued
Spud Date: 1992-12-09
Final Drill Date: 1992-12-27
Well Total Depth: 1895.00 m
Surface Hole Latitude: 58.451880
Surface Hole Longitude: -119.245430

For data sources see[1][2]

Well History

Date Event
1992-12-02 Obtained License
1992-12-11 Surface Casing Operation Performed
1992-12-12 Direction Drilling Operation Performed - Deviate
1992-12-23 Production Casing Operation Performed
1992-12-24 Well Log Performed
1992-12-27 Finished Drilling
1992-12-27 Perforation Treatment Performed - Open-Hole Completion
1992-12-27 Well Log Performed
1992-12-27 Well Mode changed to Drilled and Cased
1992-12-29 Well Log Performed
1992-12-31 Rig Released
1993-01-09 Perforation Treatment Performed - Cement Plug
1993-01-11 Perforation Treatment Performed - Cement Plug
1993-01-12 Liner Casing Operation Performed
1993-01-12 Perforation Treatment Performed - Cement Squeeze
1993-01-16 Well Log Performed
1993-01-17 Perforation Treatment Performed - Jet Perforation
1993-01-17 Well Log Performed
1993-01-18 Perforation Treatment Performed - Cement Squeeze
1993-01-20 Well Log Performed
1993-01-21 Perforation Treatment Performed - Jet Perforation
1993-01-21 Well Log Performed
1993-01-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-01-28 Well Began Production
1993-01-28 Well Fluid changed to Crude Oil
1993-01-28 Well Mode changed to Flowing
2000-01-15 Well Log Performed
2006-06-30 Well Log Performed
2006-09-27 Well Began Injection
2006-09-27 Well Fluid changed to Solvent
2006-09-27 Well Type changed to Injection
2006-10-09 Well Log Performed
2009-05-28 Well Log Performed
2011-05-14 Perforation Treatment Performed - Cement Squeeze
2011-05-19 Well Log Performed
2011-05-20 Perforation Treatment Performed - Jet Perforation
2011-05-20 Well Log Performed
2011-05-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-05-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-05-23 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-05-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-05-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-05-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-05-27 Well Log Performed
2011-05-28 Perforation Treatment Performed - Cement Squeeze
2011-06-01 Well Log Performed
2011-06-02 Perforation Treatment Performed - Cement Squeeze
2011-06-12 Perforation Treatment Performed - Jet Perforation
2011-06-12 Well Log Performed
2011-06-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-06-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-06-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-06-16 Perforation Treatment Performed - Jet Perforation
2011-06-16 Well Log Performed
2011-06-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-06-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-06-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-06-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-06-21 Perforation Treatment Performed - Jet Perforation
2011-06-21 Well Log Performed
2011-06-23 Perforation Treatment Performed - Multi-Stage Fracture
2011-06-23 Well Log Performed
2012-07-22 Well Log Performed
2014-05-05 Well Log Performed
2017-06-19 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1992-12-12 236.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-12-27 Open Hole/Barefoot Completion 1795.00 1895.00 0
1993-01-21 Perforation 1812.00 1815.00 13
1993-01-21 Perforation 1820.00 1821.00 13
1993-01-21 Perforation 1825.00 1828.00 13
1993-01-23 Acid Treatment 1799.00 1828.00 0
2011-05-14 Cement Squeeze 1825.00 1828.00 0
2011-05-14 Cement Squeeze 1820.00 1821.00 0
2011-05-14 Cement Squeeze 1812.00 1815.00 0
2011-05-14 Cement Squeeze 1805.00 1807.00 0
2011-05-14 Cement Squeeze 1799.00 1801.00 0
2011-05-20 Perforation 1867.00 1868.00 17
1993-01-09 Cement Plug 1882.00 1888.70 0
2011-05-20 Perforation 1854.00 1856.00 17
2011-05-20 Perforation 1846.00 1848.00 17
2011-05-20 Perforation 1835.50 1838.00 17
2011-05-21 Acid Treatment 1867.00 1868.00 0
2011-05-22 Acid Treatment 1867.00 1868.00 0
2011-05-22 Acid Treatment 1854.00 1856.00 0
2011-05-23 Acid Treatment 1854.00 1856.00 0
2011-05-24 Acid Treatment 1854.00 1856.00 0
2011-05-25 Acid Treatment 1846.00 1848.00 0
2011-05-25 Acid Treatment 1835.50 1838.00 0
1993-01-11 Cement Plug 1875.00 1882.00 0
2011-05-26 Acid Treatment 1854.00 1856.00 0
2011-05-28 Cement Squeeze 1846.00 1848.00 0
2011-05-28 Cement Squeeze 1835.50 1838.00 0
2011-06-02 Cement Squeeze 1854.00 1856.00 0
2011-06-12 Perforation 1867.00 1868.00 20
2011-06-12 Perforation 1853.00 1856.00 20
2011-06-12 Perforation 1846.00 1848.00 20
2011-06-12 Perforation 1835.50 1838.00 20
2011-06-13 Acid Treatment 1867.00 1868.00 0
2011-06-14 Acid Treatment 1853.00 1856.00 0
1993-01-12 Cement Squeeze 1795.00 1875.00 0
2011-06-15 Acid Treatment 1853.00 1856.00 0
2011-06-16 Perforation 1857.50 1859.50 17
2011-06-17 Acid Treatment 1853.00 1856.00 0
2011-06-17 Acid Treatment 1857.50 1859.50 0
2011-06-18 Acid Treatment 1853.00 1856.00 0
2011-06-18 Acid Treatment 1857.50 1859.50 0
2011-06-19 Acid Treatment 1846.00 1848.00 0
2011-06-19 Acid Treatment 1853.00 1856.00 0
2011-06-19 Acid Treatment 1857.50 1859.50 0
2011-06-19 Acid Treatment 1835.50 1838.00 0
1993-01-17 Perforation 1771.00 1771.30 7
2011-06-21 Perforation 1802.00 1804.00 17
2011-06-21 Acid Treatment 1802.00 1804.00 0
2011-06-23 Multi-Stage Fracture 1858.60 1858.70 0
2011-06-23 Multi-Stage Fracture 1849.50 1849.60 0
2011-06-23 Multi-Stage Fracture 1840.40 1840.50 0
2011-06-23 Multi-Stage Fracture 1806.90 1807.00 0
1993-01-17 Perforation 1825.00 1825.30 7
1993-01-18 Cement Squeeze 1771.00 1825.30 0
1993-01-21 Perforation 1799.00 1801.00 13
1993-01-21 Perforation 1805.00 1807.00 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 7057 0.0 0.0 0.0
1994 8239 0.0 0.0 0.0
1995 8704 0.0 0.0 0.0
1996 8765 0.0 0.0 0.0
1997 8692 0.0 0.0 0.0
1998 6905 0.0 0.0 0.0
1999 2800 0.0 0.0 0.0
2000 696 0.0 0.0 0.0
2002 2327 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2011-06-24 No Incident Encountered 0.00 0.00
2016-08-11 No Incident Encountered 0.00 0.00

For data sources see[7]

References