If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 1096081009000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":58.452284,"lon":-119.231681,"icon":""}]} |
Location: 00/09-10-109-08W6/0 | |
Location Alias: 00/09-10-09-08 W6M | |
Location Alias 2: 00/09-10-109-08 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 109 | |
Meridian: 6 | |
Range: 08 | |
Section: 10 | |
County/Municipality: Mackenzie County | |
Well Name: HUSKY ET AL RAINBOW 9-10-109-8 | |
Operator Name: Husky Oil Operations Limited | |
License Number: 0104018 | |
License Date: 1983-11-08 | |
License Status: Issued | |
Spud Date: 1983-11-18 | |
Final Drill Date: 1983-12-23 | |
Well Total Depth: 1935.00 m | |
Surface Hole Latitude: 58.452284 | |
Surface Hole Longitude: -119.231681 |
Date | Event |
---|---|
1983-11-08 | Obtained License |
1983-11-18 | Direction Drilling Operation Performed - 98 |
1983-12-13 | Well Log Performed |
1983-12-22 | Lost Circulation Occurred |
1983-12-23 | Finished Drilling |
1983-12-23 | Well Mode changed to Drilled and Cased |
1983-12-25 | Well Log Performed |
1983-12-27 | Liner Casing Operation Performed |
1984-05-01 | Perforation Treatment Performed - Jet Perforation |
1984-05-02 | Perforation Treatment Performed - Cement Squeeze |
1984-05-02 | Perforation Treatment Performed - Jet Perforation |
1984-05-03 | Perforation Treatment Performed - Jet Perforation |
1984-05-04 | Perforation Treatment Performed - Cement Squeeze |
1984-05-08 | Perforation Treatment Performed - Jet Perforation |
1984-05-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1984-05-25 | Well Began Production |
1984-05-25 | Well Fluid changed to Crude Oil |
1984-05-25 | Well Mode changed to Flowing |
1987-02-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1987-02-27 | Perforation Treatment Performed - Jet Perforation |
1987-02-28 | Perforation Treatment Performed - Jet Perforation |
1987-03-01 | Well Fluid changed to Crude Oil |
1987-03-01 | Well Mode changed to Suspended |
1991-11-24 | Well Log Performed |
1991-11-28 | Well Log Performed |
1991-11-29 | Perforation Treatment Performed - Cement Squeeze |
1991-12-03 | Perforation Treatment Performed - Jet Perforation |
1991-12-11 | Well Log Performed |
1991-12-12 | Perforation Treatment Performed - Jet Perforation |
1991-12-15 | Well Log Performed |
1992-01-08 | Well Fluid changed to Crude Oil |
1992-01-08 | Well Mode changed to Flowing |
1996-02-16 | Well Log Performed |
1996-02-17 | Perforation Treatment Performed - Jet Perforation |
1996-03-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1997-04-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2003-01-05 | Well Log Performed |
2003-01-10 | Perforation Treatment Performed - Jet Perforation |
2003-01-10 | Well Log Performed |
2003-01-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2003-01-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2003-01-14 | Well Log Performed |
2007-08-15 | Well Fluid changed to Crude Oil |
2007-08-15 | Well Mode changed to Suspended |
2009-04-15 | Well Fluid changed to Crude Oil |
2009-04-15 | Well Mode changed to Flowing |
2012-01-18 | Well Log Performed |
2012-01-24 | Perforation Treatment Performed - Cement Squeeze |
2012-02-01 | Perforation Treatment Performed - Cement Squeeze |
2012-02-01 | Plug Back Performed |
2012-02-10 | Perforation Treatment Performed - Cement Squeeze |
2012-02-14 | Well Log Performed |
2012-02-15 | Perforation Treatment Performed - Jet Perforation |
2012-02-15 | Well Log Performed |
2012-02-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2012-02-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2012-02-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2012-02-20 | Perforation Treatment Performed - Jet Perforation |
2012-02-20 | Well Log Performed |
2012-02-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2012-02-23 | Well Log Performed |
2019-03-04 | Well Log Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1983-11-18 | 900.00 | Conversion |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1984-05-01 | Perforation | 1831.00 | 1832.00 | 13 |
1984-05-08 | Perforation | 1834.00 | 1837.00 | 0 |
1984-05-08 | Perforation | 1819.00 | 1825.00 | 0 |
1984-05-08 | Perforation | 1797.50 | 1800.50 | 0 |
1984-05-13 | Acid Treatment | 1797.50 | 1845.00 | 0 |
1987-02-25 | Packing Device Capped w/Cement | 1748.00 | 1756.00 | 0 |
1987-02-27 | Perforation | 1726.00 | 1729.00 | 13 |
1987-02-28 | Perforation | 1718.00 | 1725.00 | 13 |
1991-11-29 | Cement Squeeze | 1718.00 | 1729.00 | 0 |
1991-12-03 | Perforation | 1797.50 | 1800.50 | 13 |
1991-12-03 | Perforation | 1819.00 | 1825.00 | 13 |
1984-05-02 | Cement Squeeze | 1831.00 | 1832.00 | 0 |
1991-12-03 | Perforation | 1828.00 | 1831.00 | 13 |
1991-12-03 | Perforation | 1834.00 | 1837.00 | 13 |
1991-12-03 | Perforation | 1840.00 | 1845.00 | 13 |
1991-12-12 | Perforation | 1717.50 | 1719.50 | 13 |
1991-12-12 | Perforation | 1726.00 | 1728.00 | 13 |
1996-02-17 | Perforation | 1848.00 | 1853.00 | 13 |
1996-03-15 | Acid Treatment | 1834.00 | 1853.00 | 0 |
1997-04-16 | Acid Treatment | 1848.00 | 1853.00 | 0 |
2003-01-10 | Perforation | 1880.50 | 1882.50 | 13 |
2003-01-10 | Perforation | 1874.00 | 1877.50 | 13 |
1984-05-02 | Perforation | 1796.00 | 1797.00 | 13 |
2003-01-10 | Perforation | 1866.00 | 1869.00 | 13 |
2003-01-10 | Perforation | 1857.00 | 1860.00 | 13 |
2003-01-10 | Perforation | 1848.00 | 1853.00 | 13 |
2003-01-11 | Acid Treatment | 1880.50 | 1882.50 | 0 |
2003-01-11 | Acid Treatment | 1874.00 | 1877.50 | 0 |
2003-01-11 | Acid Treatment | 1866.00 | 1869.00 | 0 |
2003-01-12 | Acid Treatment | 1857.00 | 1860.00 | 0 |
2003-01-12 | Acid Treatment | 1874.00 | 1877.50 | 0 |
2003-01-12 | Acid Treatment | 1866.00 | 1869.00 | 0 |
2012-01-24 | Cement Squeeze | 1819.00 | 1825.00 | 0 |
1984-05-02 | Perforation | 1820.00 | 1820.80 | 13 |
2012-01-24 | Cement Squeeze | 1797.50 | 1800.50 | 0 |
2012-02-01 | Cement Squeeze | 1717.50 | 1728.00 | 0 |
2012-02-10 | Cement Squeeze | 1874.00 | 1877.50 | 0 |
2012-02-10 | Cement Squeeze | 1866.00 | 1869.00 | 0 |
2012-02-10 | Cement Squeeze | 1880.50 | 1882.50 | 0 |
2012-02-10 | Cement Squeeze | 1828.00 | 1831.00 | 0 |
2012-02-10 | Cement Squeeze | 1840.00 | 1845.00 | 0 |
2012-02-10 | Cement Squeeze | 1834.00 | 1837.00 | 0 |
2012-02-10 | Cement Squeeze | 1857.00 | 1860.00 | 0 |
2012-02-10 | Cement Squeeze | 1848.00 | 1853.00 | 0 |
1984-05-03 | Perforation | 1824.00 | 1825.00 | 13 |
2012-02-15 | Perforation | 1894.00 | 1895.00 | 17 |
2012-02-15 | Perforation | 1884.00 | 1885.00 | 17 |
2012-02-15 | Perforation | 1889.00 | 1890.00 | 17 |
2012-02-17 | Acid Treatment | 1894.00 | 1895.00 | 0 |
2012-02-18 | Acid Treatment | 1889.00 | 1890.00 | 0 |
2012-02-19 | Acid Treatment | 1884.00 | 1885.00 | 0 |
2012-02-20 | Perforation | 1796.00 | 1800.00 | 17 |
2012-02-21 | Acid Treatment | 1796.00 | 1800.00 | 0 |
1984-05-03 | Perforation | 1801.00 | 1802.00 | 13 |
1984-05-04 | Cement Squeeze | 1796.00 | 1825.00 | 0 |
1984-05-08 | Perforation | 1828.00 | 1831.00 | 13 |
1984-05-08 | Perforation | 1840.00 | 1845.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1984 | 4951 | 0.0 | 0.0 | 0.0 |
1985 | 7292 | 0.0 | 0.0 | 0.0 |
1986 | 24 | 0.0 | 0.0 | 0.0 |
1991 | 120 | 0.0 | 0.0 | 0.0 |
1992 | 8219 | 0.0 | 0.0 | 0.0 |
1993 | 8636 | 0.0 | 0.0 | 0.0 |
1994 | 8366 | 0.0 | 0.0 | 0.0 |
1995 | 8541 | 0.0 | 0.0 | 0.0 |
1996 | 7665 | 0.0 | 0.0 | 0.0 |
1997 | 7592 | 0.0 | 0.0 | 0.0 |
1998 | 284 | 0.0 | 0.0 | 0.0 |
1999 | 172 | 0.0 | 0.0 | 0.0 |
2003 | 8134 | 0.0 | 0.0 | 0.0 |
2004 | 3547 | 0.0 | 0.0 | 0.0 |
2005 | 1629 | 0.0 | 0.0 | 0.0 |
2006 | 647 | 0.0 | 0.0 | 0.0 |
2009 | 5107 | 0.0 | 0.0 | 0.0 |
2010 | 8060 | 0.0 | 0.0 | 0.0 |
2011 | 4320 | 0.0 | 0.0 | 0.0 |
2012 | 6620 | 0.0 | 0.0 | 0.0 |
2013 | 8007 | 0.0 | 0.0 | 0.0 |
2014 | 6652 | 0.0 | 0.0 | 0.0 |
2015 | 8065 | 0.0 | 0.0 | 0.0 |
2016 | 7852 | 0.0 | 0.0 | 0.0 |
2017 | 8007 | 0.0 | 0.0 | 0.0 |
2018 | 8042 | 0.0 | 0.0 | 0.0 |
2019 | 7356 | 0.0 | 0.0 | 0.0 |
2020 | 1973 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1983-12-22 | Lost Circulation | 1839.00 | 1935.00 |
2003-01-16 | No Incident Encountered | 0.00 | 0.00 |
2012-02-26 | No Incident Encountered | 0.00 | 0.00 |
2012-02-26 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]