X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1096080915020

Well Details

Well ID: 1096080915020
Loading map...
Location: 02/15-09-109-08W6/0
Location Alias: 02/15-09-09-08 W6M
Location Alias 2: 02/15-09-109-08 W6/00
Country: Canada
Province: Alberta
Township: 109
Meridian: 6
Range: 08
Section: 09
County/Municipality: Mackenzie County
Well Name: HUSKY MOBIL RAINBOW A15-9-109-8
Operator Name: Husky Oil Operations Limited
License Number: 0038630
License Date: 1970-08-21
License Status: Suspension
Spud Date: 1970-09-02
Final Drill Date: 1970-09-22
Well Total Depth: 1907.10 m
Surface Hole Latitude: 58.452521
Surface Hole Longitude: -119.267772

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1970-08-21 Obtained License
1970-09-22 Finished Drilling
1970-09-22 Well Mode changed to Drilled and Cased
1970-09-24 Liner Casing Operation Performed
1970-10-02 Perforation Treatment Performed - Jet Perforation
1970-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-10-28 Perforation Treatment Performed - Cement Squeeze
1970-11-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-11-01 Perforation Treatment Performed - Jet Perforation
1970-11-02 Perforation Treatment Performed - Jet Perforation
1970-11-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-11-08 Perforation Treatment Performed - Jet Perforation
1970-11-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-11-09 Well Began Production
1970-11-09 Well Fluid changed to Crude Oil
1970-11-09 Well Mode changed to Flowing
1971-01-19 Well Fluid changed to Crude Oil
1971-01-19 Well Mode changed to Suspended
1971-02-05 Well Fluid changed to Crude Oil
1971-02-05 Well Mode changed to Flowing
1977-05-31 Well Log Performed
1977-06-01 Well Log Performed
1984-05-23 Tie-Back Casing Operation Performed
1984-06-06 Perforation Treatment Performed - Cement Squeeze
1984-06-06 Plug Back Performed
1984-06-09 Perforation Treatment Performed - Jet Perforation
1984-06-12 Perforation Treatment Performed - Cement Squeeze
1984-06-14 Perforation Treatment Performed - Jet Perforation
1984-06-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-06-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-12-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-05-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-09-15 Well Log Performed
1998-09-16 Perforation Treatment Performed - Jet Perforation
1998-09-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-09-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-05-08 Well Fluid changed to Crude Oil
2007-05-08 Well Mode changed to Suspended
2008-08-30 Well Fluid changed to Crude Oil
2008-08-30 Well Mode changed to Flowing
2010-11-05 Well Fluid changed to Crude Oil
2010-11-05 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1970-10-02 Perforation 1886.70 1894.00 7
1970-11-09 Acid Treatment 1859.30 1862.30 0
1984-06-06 Cement Squeeze 1859.30 1902.60 0
1984-06-09 Perforation 1883.00 1885.80 13
1984-06-09 Perforation 1869.80 1873.90 13
1984-06-12 Cement Squeeze 1869.80 1885.80 0
1984-06-14 Perforation 1883.00 1885.80 13
1984-06-14 Perforation 1869.80 1873.90 13
1984-06-15 Acid Treatment 1869.80 1885.80 0
1984-06-18 Acid Treatment 1869.80 1885.80 0
1991-12-02 Acid Treatment 1869.80 1885.80 0
1970-10-04 Acid Treatment 1886.70 1894.00 0
1992-05-27 Acid Treatment 1869.80 1885.80 0
1998-09-16 Perforation 1837.00 1840.00 13
1998-09-16 Perforation 1822.90 1825.90 13
1998-09-16 Perforation 1802.20 1804.20 13
1998-09-16 Perforation 1752.00 1756.00 13
1998-09-16 Perforation 1729.30 1730.80 13
1998-09-18 Acid Treatment 1729.30 1840.00 0
1998-09-22 Acid Treatment 1752.00 1756.00 0
1970-10-28 Cement Squeeze 1886.70 1894.00 0
1970-11-01 Perforation 1901.60 1903.20 7
1970-11-01 Acid Treatment 1901.60 1903.20 0
1970-11-02 Perforation 1901.00 1902.60 7
1970-11-02 Perforation 1900.10 1902.60 7
1970-11-04 Acid Treatment 1900.10 1902.60 0
1970-11-08 Perforation 1859.30 1862.30 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1970 1451 0.0 0.0 0.0
1971 6287 0.0 0.0 0.0
1972 8343 0.0 0.0 0.0
1973 2560 0.0 0.0 0.0
1974 44 0.0 0.0 0.0
1977 150 0.0 0.0 0.0
1978 2759 0.0 0.0 0.0
1979 8109 0.0 0.0 0.0
1980 4819 0.0 0.0 0.0
1982 2682 0.0 0.0 0.0
1983 7039 0.0 0.0 0.0
1984 4258 0.0 0.0 0.0
1985 1344 0.0 0.0 0.0
1986 2161 0.0 0.0 0.0
1987 8476 0.0 0.0 0.0
1988 6908 0.0 0.0 0.0
1989 2375 0.0 0.0 0.0
1990 6803 0.0 0.0 0.0
1991 2951 0.0 0.0 0.0
1992 7788 0.0 0.0 0.0
1993 3411 0.0 0.0 0.0
1994 987 0.0 0.0 0.0
1995 8756 0.0 0.0 0.0
1996 8049 0.0 0.0 0.0
1997 5038 0.0 0.0 0.0
1998 1268 0.0 0.0 0.0
1999 8415 0.0 0.0 0.0
2000 7227 0.0 0.0 0.0
2001 8152 0.0 0.0 0.0
2002 3921 0.0 0.0 0.0
2003 5520 0.0 0.0 0.0
2004 5285 0.0 0.0 0.0
2005 7509 0.0 0.0 0.0
2006 1454 0.0 0.0 0.0
2008 2733 0.0 0.0 0.0
2009 6569 0.0 0.0 0.0
2010 3766 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1998-09-15 No Incident Encountered 0.00 0.00

For data sources see[6]

References