X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1096080915000

Well Details

Well ID: 1096080915000
Loading map...
Location: 00/15-09-109-08W6/0
Location Alias: 00/15-09-09-08 W6M
Location Alias 2: 00/15-09-109-08 W6/00
Country: Canada
Province: Alberta
Township: 109
Meridian: 6
Range: 08
Section: 09
County/Municipality: Mackenzie County
Well Name: HUSKY MOBIL RAINBOW 15-9-109-8
Operator Name: Husky Oil Operations Limited
License Number: 0034550
License Date: 1968-07-31
License Status: Suspension
Spud Date: 1968-08-07
Final Drill Date: 1968-08-31
Well Total Depth: 1946.10 m
Surface Hole Latitude: 58.454223
Surface Hole Longitude: -119.267768

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-07-31 Obtained License
1968-08-31 Finished Drilling
1968-08-31 Well Mode changed to Drilled and Cased
1968-09-06 Liner Casing Operation Performed
1968-09-23 Perforation Treatment Performed - Jet Perforation
1968-09-25 Well Began Production
1968-09-25 Well Fluid changed to Crude Oil
1968-09-25 Well Mode changed to Flowing
1972-03-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-03-14 Perforation Treatment Performed - Jet Perforation
1972-03-17 Well Began Injection
1972-03-17 Well Fluid changed to Gas
1972-03-17 Well Type changed to Injection
1982-05-07 Perforation Treatment Performed - Cement Squeeze
1982-05-13 Perforation Treatment Performed - Jet Perforation
1982-05-15 Perforation Treatment Performed - Cement Squeeze
1982-05-27 Perforation Treatment Performed - Cement Plug
1982-05-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-05-31 Perforation Treatment Performed - Jet Perforation
1982-06-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-10-03 Well Log Performed
1998-10-04 Perforation Treatment Performed - Jet Perforation
1998-10-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-09-01 Well Fluid changed to Gas
2010-09-01 Well Mode changed to Suspended
2010-09-01 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-09-23 Perforation 1837.90 1841.00 7
1982-06-01 Acid Treatment 1814.30 1817.40 0
1998-10-04 Perforation 1791.00 1797.00 13
1998-10-05 Acid Treatment 1791.00 1797.00 0
1972-03-14 Perforation 1791.00 1797.10 7
1972-03-14 Acid Treatment 1791.00 1797.10 0
1982-05-07 Cement Squeeze 1791.00 1797.10 0
1982-05-13 Perforation 1825.50 1826.30 13
1982-05-15 Cement Squeeze 1825.50 1826.30 0
1982-05-27 Cement Plug 1833.00 1902.00 0
1982-05-30 Packing Device Capped w/Cement 1824.50 1824.50 0
1982-05-31 Perforation 1814.30 1817.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1968 1678 0.0 0.0 0.0
1969 7514 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 7244 0.0 0.0 0.0
1972 691 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0

For data sources see[5]

References