X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1096080905002

Well Details

Well ID: 1096080905002
Loading map...
Location: 00/05-09-109-08W6/2
Location Alias: 00/05-09-09-08 W6M
Location Alias 2: 00/05-09-109-08 W6/02
Country: Canada
Province: Alberta
Township: 109
Meridian: 6
Range: 08
Section: 09
County/Municipality: Mackenzie County
Well Name: HUSKY MOBIL RAINBOW 5-9-109-8
Operator Name: Husky Oil Operations Limited
License Number: 0030796
License Date: 1966-08-08
License Status: Suspension
Spud Date: 1966-08-09
Final Drill Date: 1966-09-11
Well Total Depth: 2071.10 m
Surface Hole Latitude: 58.446400
Surface Hole Longitude: -119.278871

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-08-08 Obtained License
1966-09-11 Finished Drilling
1966-09-11 Well Mode changed to Drilled and Cased
1966-09-13 Liner Casing Operation Performed
1970-04-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-04-06 Perforation Treatment Performed - Jet Perforation
1975-11-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1975-12-02 Perforation Treatment Performed - Jet Perforation
1975-12-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-12-03 Perforation Treatment Performed - Acid Wash - No Pressure
1976-03-12 Well Began Injection
1976-03-12 Well Fluid changed to Gas
1976-03-12 Well Type changed to Injection
1983-03-21 Perforation Treatment Performed - Jet Perforation
1983-03-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-03-23 Perforation Treatment Performed - Cement Squeeze
1983-03-29 Perforation Treatment Performed - Jet Perforation
1983-04-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-04-03 Perforation Treatment Performed - Jet Perforation
1983-04-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-03-21 Well Fluid changed to Gas
1996-03-21 Well Mode changed to Closed
1996-03-21 Well Type changed to Injection
1996-04-01 Well Fluid changed to Gas
1996-04-01 Well Type changed to Injection
2005-04-01 Well Fluid changed to Gas
2005-04-01 Well Mode changed to Suspended
2005-04-01 Well Type changed to Injection
2008-02-28 Well Log Performed
2008-03-04 Perforation Treatment Performed - Jet Perforation
2008-03-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-03-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-03-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-03-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-03-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-03-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-03-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-03-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-03-17 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1970-04-06 Perforation 1964.70 1972.10 7
1983-03-22 Acid Treatment 1925.60 1926.60 0
1983-03-23 Cement Squeeze 1850.10 1926.60 0
1983-03-29 Perforation 1850.10 1853.20 7
1983-04-03 Acid Treatment 1850.10 1853.20 0
1983-04-03 Perforation 1923.00 1926.60 7
1983-04-06 Acid Treatment 1923.00 1926.60 0
2008-03-04 Perforation 1914.10 1917.10 13
2008-03-04 Perforation 1902.00 1905.00 13
2008-03-04 Perforation 1889.80 1892.80 13
2008-03-04 Perforation 1879.40 1882.50 13
1970-04-06 Perforation 1986.70 1992.80 7
2008-03-04 Perforation 1865.40 1868.40 13
2008-03-04 Perforation 1825.70 1828.20 13
2008-03-08 Acid Treatment 1914.10 1917.10 0
2008-03-09 Acid Treatment 1902.00 1905.00 0
2008-03-10 Acid Treatment 1889.80 1892.80 0
2008-03-12 Acid Treatment 1879.40 1882.50 0
2008-03-13 Acid Treatment 1865.40 1868.40 0
2008-03-13 Acid Treatment 1825.70 1828.20 0
2008-03-14 Acid Treatment 1825.70 1828.20 0
2008-03-15 Acid Treatment 1825.70 1828.20 0
1970-04-06 Acid Treatment 1964.70 1992.80 0
2008-03-16 Acid Treatment 1825.70 1828.20 0
2008-03-17 Acid Treatment 1825.70 1828.20 0
1975-11-30 Packing Device Capped w/Cement 1946.10 1949.20 0
1975-12-02 Perforation 1902.00 1906.80 13
1975-12-02 Perforation 1850.10 1853.20 13
1975-12-03 Acid Wash 1850.10 1906.80 0
1975-12-03 Acid Treatment 1850.10 1906.80 0
1983-03-21 Perforation 1925.60 1926.60 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0

For data sources see[5]

References