X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1096080313000

Well Details

Well ID: 1096080313000
Loading map...
Location: 00/13-03-109-08W6/0
Location Alias: 00/13-03-09-08 W6M
Location Alias 2: 00/13-03-109-08 W6/00
Country: Canada
Province: Alberta
Township: 109
Meridian: 6
Range: 08
Section: 03
County/Municipality: Mackenzie County
Well Name: HUSKY ET AL RAINBOW 13-3-109-8
Operator Name: Husky Oil Operations Limited
License Number: 0112357
License Date: 1985-01-09
License Status: Suspension
Spud Date: 1985-02-12
Final Drill Date: 1985-03-08
Well Total Depth: 1888.00 m
Surface Hole Latitude: 58.440547
Surface Hole Longitude: -119.251548

For data sources see[1][2]

Well History

Date Event
1985-01-09 Obtained License
1985-02-13 Surface Casing Operation Performed
1985-03-02 Well Log Performed
1985-03-03 Well Log Performed
1985-03-04 Drill Stem Test Performed
1985-03-05 Intermediate Casing Operation Performed
1985-03-08 Finished Drilling
1985-03-08 Lost Circulation Occurred
1985-03-08 Well Mode changed to Drilled and Cased
1985-03-09 Well Log Performed
1985-03-11 Liner Casing Operation Performed
1985-03-13 Rig Released
1985-03-21 Perforation Treatment Performed - Jet Perforation
1985-03-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-04-20 Well Began Production
1985-04-20 Well Fluid changed to Crude Oil
1985-04-20 Well Mode changed to Flowing
1988-11-27 Perforation Treatment Performed - Jet Perforation
1989-05-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-03-29 Well Log Performed
1995-03-30 Perforation Treatment Performed - Jet Perforation
1995-04-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-04-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-04-03 Well Log Performed
1995-04-05 Perforation Treatment Performed - Cement Squeeze
1995-04-07 Well Log Performed
1995-04-08 Perforation Treatment Performed - Jet Perforation
1995-04-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-04-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-04-11 Well Log Performed
2004-11-23 Perforation Treatment Performed - Jet Perforation
2004-11-23 Well Log Performed
2004-11-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-11-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-11-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-11-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-12-01 Well Log Performed
2006-12-05 Perforation Treatment Performed - Cement Squeeze
2006-12-12 Well Log Performed
2006-12-14 Perforation Treatment Performed - Jet Perforation
2006-12-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-12-18 Perforation Treatment Performed - Jet Perforation
2006-12-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-06-14 Well Log Performed
2010-06-18 Well Log Performed
2013-02-04 Well Log Performed
2013-03-28 Well Fluid changed to Crude Oil
2013-03-28 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-03-21 Perforation 1813.00 1815.00 13
1995-04-02 Acid Treatment 1790.50 1792.50 0
1995-04-05 Cement Squeeze 1790.00 1820.00 0
1995-04-08 Perforation 1790.50 1792.50 13
1995-04-08 Perforation 1812.50 1814.50 13
1995-04-08 Perforation 1817.50 1820.00 13
1995-04-09 Acid Treatment 1790.50 1820.00 0
1995-04-10 Acid Treatment 1790.50 1820.00 0
2004-11-23 Perforation 1835.00 1837.00 13
2004-11-23 Perforation 1841.00 1844.00 13
2004-11-23 Perforation 1847.00 1848.00 13
1985-03-21 Perforation 1806.00 1810.00 13
2004-11-26 Acid Treatment 1847.00 1848.00 0
2004-11-27 Acid Treatment 1841.00 1844.00 0
2004-11-28 Acid Treatment 1836.00 1837.00 0
2004-11-29 Acid Treatment 1790.00 1792.50 0
2006-12-05 Cement Squeeze 1790.00 1792.50 0
2006-12-05 Cement Squeeze 1812.50 1814.50 0
2006-12-05 Cement Squeeze 1817.50 1820.00 0
2006-12-05 Cement Squeeze 1824.00 1829.00 0
2006-12-05 Cement Squeeze 1835.00 1837.00 0
2006-12-05 Cement Squeeze 1841.00 1844.00 0
1985-03-21 Perforation 1799.50 1803.00 13
2006-12-05 Cement Squeeze 1847.00 1848.00 0
2006-12-14 Perforation 1863.00 1866.00 13
2006-12-14 Perforation 1857.00 1860.00 13
2006-12-14 Perforation 1847.50 1851.50 13
2006-12-14 Perforation 1842.00 1843.50 13
2006-12-17 Acid Treatment 1842.00 1843.50 0
2006-12-18 Perforation 1790.50 1792.50 13
2006-12-19 Acid Treatment 1790.50 1792.50 0
1985-03-22 Acid Treatment 1799.50 1815.00 0
1988-11-27 Perforation 1816.50 1820.00 13
1989-05-17 Acid Treatment 1816.50 1820.00 0
1995-03-30 Perforation 1790.00 1792.50 13
1995-03-30 Perforation 1824.00 1829.00 13
1995-04-01 Acid Treatment 1824.00 1829.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 5053 0.0 0.0 0.0
1986 8411 0.0 0.0 0.0
1987 8567 0.0 0.0 0.0
1988 8392 0.0 0.0 0.0
1989 8276 0.0 0.0 0.0
1990 8683 0.0 0.0 0.0
1991 7961 0.0 0.0 0.0
1992 8770 0.0 0.0 0.0
1993 8547 0.0 0.0 0.0
1994 8390 0.0 0.0 0.0
1995 5806 0.0 0.0 0.0
1996 8756 0.0 0.0 0.0
1997 8755 0.0 0.0 0.0
1998 4903 0.0 0.0 0.0
2000 6 0.0 0.0 0.0
2001 3002 0.0 0.0 0.0
2002 6419 0.0 0.0 0.0
2003 1037 0.0 0.0 0.0
2004 569 0.0 0.0 0.0
2005 8588 0.0 0.0 0.0
2006 4924 0.0 0.0 0.0
2007 7857 0.0 0.0 0.0
2008 6996 0.0 0.0 0.0
2009 3661 0.0 0.0 0.0
2010 8470 0.0 0.0 0.0
2011 1722 0.0 0.0 0.0
2012 736 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1985-03-08 Lost Circulation 1888.00 1888.00

For data sources see[6]

References