X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1096080312002

Well Details

Well ID: 1096080312002
Loading map...
Location: 00/12-03-109-08W6/2
Location Alias: 00/12-03-09-08 W6M
Location Alias 2: 00/12-03-109-08 W6/02
Country: Canada
Province: Alberta
Township: 109
Meridian: 6
Range: 08
Section: 03
County/Municipality: Mackenzie County
Well Name: HUSKY MOBIL RAINBOW 12-3-109-8
Operator Name: Husky Oil Operations Limited
License Number: 0030696
License Date: 1966-07-15
License Status: Issued
Spud Date: 1966-07-24
Final Drill Date: 1966-08-30
Well Total Depth: 1887.90 m
Surface Hole Latitude: 58.436606
Surface Hole Longitude: -119.253209

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-07-15 Obtained License
1966-08-07 Production Casing Operation Performed
1966-08-13 Lost Circulation Occurred
1966-08-22 Lost Circulation Occurred
1966-08-30 Finished Drilling
1966-08-30 Perforation Treatment Performed - Open-Hole Completion
1966-08-30 Well Mode changed to Drilled and Cased
1984-05-25 Perforation Treatment Performed - Jet Perforation
1984-05-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-05-27 Perforation Treatment Performed - Jet Perforation
1984-05-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-06-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-06-14 Well Began Production
1984-06-14 Well Fluid changed to Gas
1984-06-14 Well Mode changed to Flowing
1988-09-30 Well Fluid changed to Gas
1988-09-30 Well Mode changed to Suspended
1990-09-04 Well Fluid changed to Gas
1990-09-04 Well Mode changed to Flowing
1994-05-01 Well Log Performed
1994-05-13 Well Log Performed
1994-05-15 Perforation Treatment Performed - Cement Squeeze
1994-05-16 Well Log Performed
1994-05-17 Well Log Performed
1994-05-18 Perforation Treatment Performed - Jet Perforation
1994-05-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-05-25 Well Fluid changed to Gas
1994-05-25 Well Mode changed to Suspended
2003-05-26 Perforation Treatment Performed - Jet Perforation
2003-05-26 Well Log Performed
2003-05-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-05-30 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-05-30 Perforation Treatment Performed - Jet Perforation
2003-05-30 Well Log Performed
2003-06-01 Well Log Performed
2006-10-03 Well Log Performed
2009-05-29 Well Log Performed
2010-07-11 Well Log Performed
2010-07-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-07-17 Perforation Treatment Performed - Cement Squeeze
2010-07-24 Well Log Performed
2010-07-25 Perforation Treatment Performed - Jet Perforation
2010-07-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-07-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-07-29 Well Log Performed
2010-07-30 Perforation Treatment Performed - Cement Squeeze
2010-08-04 Perforation Treatment Performed - Jet Perforation
2010-08-04 Well Log Performed
2010-08-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-08-06 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-08-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-08-09 Perforation Treatment Performed - Jet Perforation
2010-08-09 Well Log Performed
2010-08-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-08-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-08-14 Perforation Treatment Performed - Fractured
2010-08-14 Perforation Treatment Performed - Open-Hole Completion
2011-05-11 Perforation Treatment Performed - Multi-Stage Fracture
2011-05-11 Well Log Performed
2012-06-24 Well Log Performed
2013-06-05 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-08-30 Open Hole/Barefoot Completion 1777.00 1887.90 0
1994-05-18 Perforation 1796.00 1799.00 13
1994-05-18 Perforation 1783.00 1788.00 13
1994-05-19 Acid Treatment 1783.00 1799.00 0
2003-05-26 Perforation 1834.00 1837.00 13
2003-05-26 Perforation 1826.00 1829.00 13
2003-05-26 Perforation 1819.00 1822.00 13
2003-05-28 Acid Treatment 1826.00 1829.00 0
2003-05-28 Acid Treatment 1819.00 1822.00 0
2003-05-28 Acid Treatment 1783.00 1788.00 0
2003-05-28 Acid Treatment 1783.00 1788.00 0
1984-05-25 Perforation 1781.20 1785.00 13
2003-05-28 Acid Treatment 1783.00 1788.00 0
2003-05-28 Acid Treatment 1783.00 1788.00 0
2003-05-30 Perforation 1788.00 1792.00 13
2003-05-30 Acid Treatment 1783.00 1789.00 0
2003-05-30 Acid Treatment 1783.00 1789.00 0
2010-07-15 Acid Treatment 1826.00 1829.00 0
2010-07-15 Acid Treatment 1819.00 1822.00 0
2010-07-17 Cement Squeeze 1834.00 1837.00 0
2010-07-17 Cement Squeeze 1819.00 1822.00 0
2010-07-17 Cement Squeeze 1788.00 1792.00 0
1984-05-25 Perforation 1778.80 1781.00 13
2010-07-17 Cement Squeeze 1783.00 1788.00 0
2010-07-25 Perforation 1855.00 1858.00 13
2010-07-25 Perforation 1842.00 1845.00 13
2010-07-25 Perforation 1834.50 1838.50 13
2010-07-25 Perforation 1826.50 1828.50 13
2010-07-26 Acid Treatment 1855.00 1858.00 0
2010-07-27 Acid Treatment 1842.00 1845.00 0
2010-07-30 Cement Squeeze 1842.00 1845.00 0
2010-07-30 Cement Squeeze 1834.50 1838.50 0
2010-07-30 Cement Squeeze 1826.00 1829.00 0
1984-05-26 Acid Treatment 1777.00 1787.90 0
2010-07-30 Cement Squeeze 1806.00 1809.00 0
2010-07-30 Cement Squeeze 1796.00 1799.00 0
2010-08-04 Perforation 1842.00 1845.00 13
2010-08-04 Perforation 1835.00 1836.00 13
2010-08-04 Perforation 1826.00 1827.00 13
2010-08-05 Acid Treatment 1855.00 1858.00 0
2010-08-05 Acid Treatment 1842.00 1845.00 0
2010-08-06 Acid Treatment 1842.00 1845.00 0
2010-08-07 Acid Treatment 1835.00 1836.00 0
2010-08-07 Acid Treatment 1826.00 1827.00 0
1984-05-27 Perforation 1737.80 1742.20 13
2010-08-09 Perforation 1786.00 1791.00 13
2010-08-11 Acid Treatment 1786.00 1791.00 0
2010-08-12 Acid Treatment 1786.00 1791.00 0
2010-08-14 Open Hole/Barefoot Completion 1777.00 1887.90 0
2010-08-14 Fracture 1777.00 1887.90 0
2011-05-11 Multi-Stage Fracture 1838.00 1838.10 0
1984-05-30 Acid Treatment 1737.80 1742.20 0
1984-06-14 Acid Treatment 1737.80 1742.20 0
1994-05-15 Cement Squeeze 1737.80 1887.90 0
1994-05-18 Perforation 1806.00 1809.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 155 0.0 0.0 0.0
1985 120 0.0 0.0 0.0
1986 121 0.0 0.0 0.0
1990 1943 0.0 0.0 0.0
1991 6336 0.0 0.0 0.0
1992 1872 0.0 0.0 0.0
1993 4558 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1966-08-13 Lost Circulation 1815.00 1815.00
1966-08-22 Lost Circulation 1872.00 1872.00

For data sources see[6]

References