X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1096080311000

Well Details

Well ID: 1096080311000
Loading map...
Location: 00/11-03-109-08W6/0
Location Alias: 00/11-03-09-08 W6M
Location Alias 2: 00/11-03-109-08 W6/00
Country: Canada
Province: Alberta
Township: 109
Meridian: 6
Range: 08
Section: 03
County/Municipality: Mackenzie County
Well Name: HUSKY ET AL RAINBOW 11-3-109-8
Operator Name: Husky Oil Operations Limited
License Number: 0121166
License Date: 1986-01-08
License Status: Suspension
Spud Date: 1986-01-10
Final Drill Date: 1986-02-01
Well Total Depth: 1885.00 m
Surface Hole Latitude: 58.436224
Surface Hole Longitude: -119.242903

For data sources see[1][2]

Well History

Date Event
1986-01-08 Obtained License
1986-01-10 Lost Circulation Occurred
1986-01-12 Surface Casing Operation Performed
1986-01-14 Well Log Performed
1986-01-24 Well Log Performed
1986-01-25 Intermediate Casing Operation Performed
1986-01-29 Well Log Performed
1986-01-30 Lost Circulation Occurred
1986-01-31 Lost Circulation Occurred
1986-01-31 Well Log Performed
1986-02-01 Finished Drilling
1986-02-01 Well Mode changed to Drilled and Cased
1986-02-02 Well Log Performed
1986-02-03 Liner Casing Operation Performed
1986-02-05 Rig Released
1986-03-08 Well Log Performed
1986-03-10 Perforation Treatment Performed - Jet Perforation
1986-03-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-03-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-03-21 Well Began Production
1986-03-21 Well Fluid changed to Crude Oil
1986-03-21 Well Mode changed to Flowing
1994-11-14 Well Log Performed
1994-11-15 Perforation Treatment Performed - Jet Perforation
1994-11-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-11-18 Well Log Performed
1994-11-21 Perforation Treatment Performed - Cement Squeeze
1994-11-25 Well Log Performed
1994-11-26 Perforation Treatment Performed - Jet Perforation
1994-11-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-11-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-11-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-11-29 Well Log Performed
1994-11-30 Perforation Treatment Performed - Jet Perforation
1994-12-03 Well Log Performed
2003-07-20 Perforation Treatment Performed - Jet Perforation
2003-07-20 Well Log Performed
2003-07-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-07-23 Well Log Performed
2009-03-26 Well Fluid changed to Crude Oil
2009-03-26 Well Mode changed to Suspended
2016-01-13 Well Fluid changed to Crude Oil
2016-01-13 Well Mode changed to Flowing
2016-01-22 Well Fluid changed to Crude Oil
2016-01-22 Well Mode changed to Suspended
2020-01-09 Well Log Performed
2020-01-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-01-11 Perforation Treatment Performed - Cement Plug
2020-01-11 Plug Back Performed
2020-01-11 Well Fluid changed to Crude Oil
2020-01-11 Well Log Performed
2020-01-11 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-03-10 Perforation 1811.00 1816.00 13
1994-11-26 Perforation 1802.00 1805.50 13
1994-11-26 Perforation 1811.00 1816.00 13
1994-11-27 Acid Treatment 1811.00 1816.00 0
1994-11-28 Acid Treatment 1802.00 1805.50 0
1994-11-29 Acid Treatment 1783.00 1785.00 0
1994-11-30 Perforation 1823.00 1825.00 13
2003-07-20 Perforation 1853.00 1856.00 13
2003-07-20 Perforation 1845.00 1847.00 13
2003-07-20 Perforation 1838.00 1840.00 13
2003-07-22 Acid Treatment 1838.00 1856.00 0
1986-03-10 Perforation 1802.00 1805.50 13
2020-01-11 Cement Plug 1758.00 1768.70 0
2020-01-11 Packing Device Capped w/Cement 1718.00 1729.00 0
1986-03-10 Perforation 1793.00 1797.00 13
1986-03-15 Acid Treatment 1793.00 1797.00 0
1986-03-19 Acid Treatment 1793.00 1797.00 0
1994-11-15 Perforation 1783.00 1785.00 13
1994-11-16 Acid Treatment 1783.00 1785.00 0
1994-11-21 Cement Squeeze 1783.00 1816.00 0
1994-11-26 Perforation 1783.00 1785.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 6659 0.0 0.0 0.0
1987 8579 0.0 0.0 0.0
1988 8422 0.0 0.0 0.0
1989 8164 0.0 0.0 0.0
1990 8517 0.0 0.0 0.0
1991 7337 0.0 0.0 0.0
1992 7129 0.0 0.0 0.0
1993 7334 0.0 0.0 0.0
1994 7051 0.0 0.0 0.0
1995 7492 0.0 0.0 0.0
1996 8740 0.0 0.0 0.0
1997 8698 0.0 0.0 0.0
1998 8718 0.0 0.0 0.0
1999 8408 0.0 0.0 0.0
2000 8283 0.0 0.0 0.0
2001 2923 0.0 0.0 0.0
2002 4979 0.0 0.0 0.0
2003 3753 0.0 0.0 0.0
2004 8712 0.0 0.0 0.0
2005 8645 0.0 0.0 0.0
2006 1414 0.0 0.0 0.0
2007 25 0.0 0.0 0.0
2016 72 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1986-01-30 Lost Circulation 1826.00 1826.00
1986-01-10 Lost Circulation 43.00 43.00
1986-01-31 Lost Circulation 1864.00 1885.00
2020-01-14 No Incident Encountered 0.00 0.00

For data sources see[6]

References