X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1096080213000

Well Details

Well ID: 1096080213000
Loading map...
Location: 00/13-02-109-08W6/0
Location Alias: 00/13-02-09-08 W6M
Location Alias 2: 00/13-02-109-08 W6/00
Country: Canada
Province: Alberta
Township: 109
Meridian: 6
Range: 08
Section: 02
County/Municipality: Mackenzie County
Well Name: HUSKY MOBIL RAINBOW 13-2-109-8
Operator Name: Husky Oil Operations Limited
License Number: 0030106
License Date: 1966-02-25
License Status: Abandoned
Spud Date: 1966-03-02
Final Drill Date: 1966-04-25
Well Total Depth: 2178.70 m
Surface Hole Latitude: 58.439885
Surface Hole Longitude: -119.225288

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-02-25 Obtained License
1966-04-25 Finished Drilling
1966-04-25 Well Mode changed to Drilled and Cased
1966-04-28 Drill Stem Test Performed
1966-04-29 Drill Stem Test Performed
1966-04-30 Liner Casing Operation Performed
1966-05-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-05-05 Perforation Treatment Performed - Jet Perforation
1966-05-05 Well Began Production
1966-05-05 Well Fluid changed to Crude Oil
1966-05-05 Well Mode changed to Flowing
1966-08-22 Well Fluid changed to Crude Oil
1966-08-22 Well Mode changed to Suspended
1969-12-20 Perforation Treatment Performed - Jet Perforation
1969-12-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-01-05 Well Fluid changed to Crude Oil
1970-01-05 Well Mode changed to Flowing
1973-06-23 Perforation Treatment Performed - Cement Squeeze
1973-06-29 Perforation Treatment Performed - Jet Perforation
1973-06-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-05-15 Well Log Performed
1984-02-29 Perforation Treatment Performed - Jet Perforation
1984-02-29 Well Fluid changed to Crude Oil
1984-02-29 Well Mode changed to Flowing
1984-03-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-03-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-03-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-03-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-03-20 Perforation Treatment Performed - Cement Squeeze
1984-06-19 Well Began Injection
1984-06-19 Well Fluid changed to Solvent
1984-06-19 Well Type changed to Injection
1986-02-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-02-15 Perforation Treatment Performed - Cement Squeeze
1986-02-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-02-25 Perforation Treatment Performed - Jet Perforation
1986-02-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-02-28 Perforation Treatment Performed - Cement Squeeze
1993-04-09 Well Log Performed
1993-04-10 Well Log Performed
1993-04-11 Perforation Treatment Performed - Jet Perforation
1993-04-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-04-13 Well Log Performed
1993-04-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-04-18 Well Log Performed
1993-04-20 Perforation Treatment Performed - Cement Squeeze
1993-04-28 Well Log Performed
1993-04-29 Perforation Treatment Performed - Jet Perforation
1993-05-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-05-02 Well Log Performed
1993-05-07 Well Log Performed
1996-10-05 Perforation Treatment Performed - Chemical Squeeze
1996-10-18 Well Log Performed
1996-10-20 Perforation Treatment Performed - Jet Perforation
1996-10-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-07-18 Well Log Performed
2003-09-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-09-03 Plug Back Performed
2003-09-03 Well Fluid changed to Solvent
2003-09-03 Well Log Performed
2003-09-03 Well Mode changed to Abandoned Zone
2003-09-03 Well Type changed to Injection
2003-09-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-09-04 Plug Back Performed
2018-03-24 Perforation Treatment Performed - Jet Perforation
2018-03-24 Well Log Performed
2018-03-25 Well Log Performed
2018-03-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-03-27 Perforation Treatment Performed - Cement Plug
2018-03-27 Perforation Treatment Performed - Remedial Casing
2018-03-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-03-28 Perforation Treatment Performed - Cement Plug
2018-03-28 Perforation Treatment Performed - Jet Perforation
2018-03-28 Perforation Treatment Performed - Remedial Casing
2018-03-28 Well Log Performed
2018-03-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-03-29 Perforation Treatment Performed - Cement Plug
2018-03-29 Perforation Treatment Performed - Jet Perforation
2018-03-29 Perforation Treatment Performed - Remedial Casing
2018-03-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-03-30 Perforation Treatment Performed - Cement Plug
2018-03-30 Perforation Treatment Performed - Remedial Casing
2018-10-11 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-05-05 Perforation 1813.60 1816.60 7
1973-06-30 Acid Treatment 1766.00 1781.90 0
1984-02-29 Perforation 1761.40 1763.00 13
1984-02-29 Perforation 1756.60 1759.60 13
1984-02-29 Perforation 1719.70 1721.80 13
1984-02-29 Perforation 1714.50 1716.60 13
1984-02-29 Perforation 1711.10 1713.00 13
1984-02-29 Perforation 1707.50 1708.70 13
1984-03-03 Acid Treatment 1719.70 1721.80 0
1984-03-07 Acid Treatment 1719.70 1721.80 0
1984-03-12 Acid Treatment 1707.50 1721.80 0
1966-05-05 Acid Treatment 1813.60 1816.60 0
1984-03-16 Acid Treatment 1707.50 1708.70 0
1984-03-20 Cement Squeeze 1707.50 1721.80 0
1986-02-13 Acid Treatment 1765.90 1771.40 0
1986-02-15 Cement Squeeze 1765.90 1771.40 0
1986-02-23 Acid Treatment 1773.30 1781.90 0
1986-02-25 Perforation 1763.00 1765.00 13
1986-02-25 Perforation 1758.40 1761.10 13
1986-02-26 Acid Treatment 1756.60 1765.00 0
1986-02-28 Cement Squeeze 1756.00 1765.00 0
1993-04-11 Perforation 1758.00 1761.00 20
1969-12-20 Perforation 1802.00 1805.00 7
1993-04-11 Perforation 1766.00 1768.50 20
1993-04-12 Acid Treatment 1758.00 1768.50 0
1993-04-18 Acid Treatment 1758.00 1768.50 0
1993-04-20 Cement Squeeze 1758.00 1768.50 0
1993-04-29 Perforation 1766.00 1770.00 13
1993-04-29 Perforation 1781.00 1783.50 13
1993-05-02 Acid Treatment 1766.00 1770.00 0
1996-10-05 Chemical Squeeze 1766.00 1783.50 0
1996-10-20 Perforation 1788.00 1791.00 13
1996-10-22 Acid Treatment 1788.00 1791.00 0
1969-12-21 Acid Treatment 1802.00 1805.00 0
2003-09-03 Packing Device Capped w/Cement 1757.00 1765.30 0
2003-09-04 Packing Device Capped w/Cement 1631.00 1702.50 0
2018-03-24 Perforation 1003.00 1006.00 20
2018-03-24 Perforation 847.00 850.00 17
2018-03-27 Remedial Casing Cementing 1003.00 1006.00 0
2018-03-27 Cement Plug 999.00 1006.00 0
2018-03-27 Packing Device Capped w/Cement 990.00 999.00 0
2018-03-28 Remedial Casing Cementing 847.00 850.00 0
2018-03-28 Cement Plug 841.00 850.00 0
2018-03-28 Packing Device Capped w/Cement 832.00 841.00 0
1973-06-23 Cement Squeeze 1802.00 1816.60 0
2018-03-28 Perforation 650.00 653.00 20
2018-03-29 Remedial Casing Cementing 650.00 653.00 0
2018-03-29 Cement Plug 645.50 653.00 0
2018-03-29 Packing Device Capped w/Cement 636.50 645.50 0
2018-03-29 Perforation 437.00 440.00 17
2018-03-29 Perforation 423.00 426.00 17
2018-03-30 Remedial Casing Cementing 423.00 440.00 0
2018-03-30 Cement Plug 419.50 440.00 0
2018-03-30 Packing Device Capped w/Cement 410.00 419.50 0
1973-06-29 Perforation 1766.00 1768.40 10
1973-06-29 Perforation 1769.70 1771.50 10
1973-06-29 Perforation 1773.30 1775.50 10
1973-06-29 Perforation 1777.00 1781.90 10

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0
1970 3326 0.0 0.0 0.0
1971 5999 0.0 0.0 0.0
1972 8642 0.0 0.0 0.0
1973 8276 0.0 0.0 0.0
1974 8126 0.0 0.0 0.0
1975 6684 0.0 0.0 0.0
1976 7501 0.0 0.0 0.0
1977 5723 0.0 0.0 0.0
1978 7643 0.0 0.0 0.0
1979 8449 0.0 0.0 0.0
1980 8443 0.0 0.0 0.0
1981 6826 0.0 0.0 0.0
1982 8007 0.0 0.0 0.0
1983 2690 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-03-31 No Incident Encountered 0.00 0.00

For data sources see[6]

References