X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1096073604000

Well Details

Well ID: 1096073604000
Loading map...
Location: 00/04-36-109-07W6/0
Location Alias: 00/04-36-09-07 W6M
Location Alias 2: 00/04-36-109-07 W6/00
Country: Canada
Province: Alberta
Township: 109
Meridian: 6
Range: 07
Section: 36
County/Municipality: Mackenzie County
Well Name: HUSKY RAINBOW 4-36-109-7
Operator Name: Husky Oil Operations Limited
License Number: 0031964
License Date: 1967-03-15
License Status: Issued
Spud Date: 1967-03-16
Final Drill Date: 1967-04-25
Well Total Depth: 1944.60 m
Surface Hole Latitude: 58.502078
Surface Hole Longitude: -119.030504

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-03-15 Obtained License
1967-04-04 Drill Stem Test Performed
1967-04-20 Lost Circulation Occurred
1967-04-25 Finished Drilling
1967-04-25 Well Mode changed to Drilled and Cased
1967-04-27 Liner Casing Operation Performed
1967-05-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-05-03 Perforation Treatment Performed - Jet Perforation
1967-05-15 Well Began Production
1967-05-15 Well Fluid changed to Crude Oil
1967-05-15 Well Mode changed to Flowing
1973-08-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-01-20 Perforation Treatment Performed - Abrasa-Jet Perforation
1976-01-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-10-02 Well Log Performed
1986-08-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-08-09 Well Log Performed
1986-08-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-08-11 Well Log Performed
1986-08-18 Perforation Treatment Performed - Cement Squeeze
1986-08-21 Perforation Treatment Performed - Jet Perforation
1986-08-21 Well Log Performed
1986-08-27 Perforation Treatment Performed - Cement Squeeze
1986-08-28 Perforation Treatment Performed - Jet Perforation
1986-08-29 Perforation Treatment Performed - Cement Squeeze
1986-08-30 Perforation Treatment Performed - Jet Perforation
1986-09-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-02-28 Well Log Performed
1998-03-02 Well Log Performed
1998-03-05 Well Log Performed
1998-03-06 Well Log Performed
1998-04-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-04-25 Perforation Treatment Performed - Jet Perforation
1999-06-18 Well Fluid changed to Crude Oil
1999-06-18 Well Mode changed to Pumping
2000-08-09 Well Log Performed
2000-08-12 Perforation Treatment Performed - Cement Squeeze
2000-08-15 Perforation Treatment Performed - Cement Squeeze
2000-08-16 Perforation Treatment Performed - Cement Plug
2000-08-16 Perforation Treatment Performed - Jet Perforation
2000-08-16 Well Log Performed
2000-08-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-08-22 Well Log Performed
2005-08-29 Perforation Treatment Performed - Jet Perforation
2005-08-30 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-07-01 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-05-03 Perforation 1734.30 1737.40 7
1986-08-21 Perforation 1721.00 1723.00 7
1986-08-21 Perforation 1727.00 1730.00 7
1986-08-27 Cement Squeeze 1721.00 1730.00 0
1986-08-28 Perforation 1727.00 1730.00 7
1986-08-29 Cement Squeeze 1727.00 1730.00 0
1986-08-30 Perforation 1727.00 1730.00 7
1986-08-30 Perforation 1721.00 1723.00 7
1986-09-01 Acid Treatment 1721.00 1730.00 0
1998-04-25 Perforation 1711.70 1713.80 13
1998-04-25 Acid Treatment 1711.70 1713.00 0
1967-05-03 Acid Treatment 1734.30 1737.40 0
2000-08-12 Cement Squeeze 1711.70 1713.80 0
2000-08-15 Cement Squeeze 1711.70 1713.80 0
2000-08-16 Cement Plug 1710.00 1710.50 0
2000-08-16 Perforation 1706.00 1708.00 13
2000-08-17 Acid Treatment 1706.00 1708.00 0
2005-08-29 Perforation 1700.00 1702.00 13
2005-08-30 Acid Treatment 1700.00 1702.00 0
1973-08-14 Acid Treatment 1734.30 1737.40 0
1976-01-20 Hydra Jet Perforation 1698.30 1702.00 7
1976-01-20 Hydra Jet Perforation 1706.30 1713.00 7
1976-01-23 Acid Treatment 1698.30 1713.00 0
1986-08-09 Acid Treatment 1698.30 1713.00 0
1986-08-10 Acid Treatment 1698.30 1713.00 0
1986-08-18 Cement Squeeze 1698.30 1713.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1967 0 0.0 0.0 0.0
1968 3710 0.0 0.0 0.0
1969 5167 0.0 0.0 0.0
1970 5854 0.0 0.0 0.0
1971 3624 0.0 0.0 0.0
1972 6947 0.0 0.0 0.0
1973 8006 0.0 0.0 0.0
1974 8259 0.0 0.0 0.0
1975 8200 0.0 0.0 0.0
1976 8090 0.0 0.0 0.0
1977 7854 0.0 0.0 0.0
1978 7908 0.0 0.0 0.0
1979 8248 0.0 0.0 0.0
1980 8196 0.0 0.0 0.0
1981 7208 0.0 0.0 0.0
1982 7852 0.0 0.0 0.0
1983 8076 0.0 0.0 0.0
1984 8268 0.0 0.0 0.0
1985 7781 0.0 0.0 0.0
1986 6485 0.0 0.0 0.0
1987 8288 0.0 0.0 0.0
1988 7975 0.0 0.0 0.0
1989 7983 0.0 0.0 0.0
1990 8640 0.0 0.0 0.0
1991 6797 0.0 0.0 0.0
1992 8068 0.0 0.0 0.0
1993 8046 0.0 0.0 0.0
1994 6094 0.0 0.0 0.0
1995 8346 0.0 0.0 0.0
1996 6794 0.0 0.0 0.0
1997 8696 0.0 0.0 0.0
1998 6509 0.0 0.0 0.0
1999 8312 0.0 0.0 0.0
2000 7946 0.0 0.0 0.0
2001 8528 0.0 0.0 0.0
2002 8501 0.0 0.0 0.0
2003 7033 0.0 0.0 0.0
2004 8592 0.0 0.0 0.0
2005 7422 0.0 0.0 0.0
2006 7635 0.0 0.0 0.0
2007 8395 0.0 0.0 0.0
2008 7673 0.0 0.0 0.0
2009 8425 0.0 0.0 0.0
2010 8720 0.0 0.0 0.0
2011 5974 0.0 0.0 0.0
2012 8473 0.0 0.0 0.0
2013 8740 0.0 0.0 0.0
2014 7912 0.0 0.0 0.0
2015 8554 0.0 0.0 0.0
2016 8398 0.0 0.0 0.0
2017 8072 0.0 0.0 0.0
2018 8324 0.0 0.0 0.0
2019 5894 0.0 0.0 0.0
2020 2173 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1967-04-20 Lost Circulation 1734.00 1734.00

For data sources see[6]

References