If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 1096073507002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":58.50441,"lon":-119.041515,"icon":""}]} |
Location: 00/07-35-109-07W6/2 | |
Location Alias: 00/07-35-09-07 W6M | |
Location Alias 2: 00/07-35-109-07 W6/02 | |
Country: Canada | |
Province: Alberta | |
Township: 109 | |
Meridian: 6 | |
Range: 07 | |
Section: 35 | |
County/Municipality: Mackenzie County | |
Well Name: HUSKY RAINBOW 7-35-109-7 | |
Operator Name: Husky Oil Operations Limited | |
License Number: 0030593 | |
License Date: 1966-06-21 | |
License Status: Issued | |
Spud Date: 1966-06-22 | |
Final Drill Date: 1966-07-30 | |
Well Total Depth: 1955.30 m | |
Surface Hole Latitude: 58.504410 | |
Surface Hole Longitude: -119.041515 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1966-06-21 | Obtained License |
1966-07-04 | Drill Stem Test Performed |
1966-07-21 | Drill Stem Test Performed |
1966-07-23 | Drill Stem Test Performed |
1966-07-25 | Drill Stem Test Performed |
1966-07-30 | Finished Drilling |
1966-07-30 | Well Mode changed to Drilled and Cased |
1966-07-31 | Drill Stem Test Performed |
1966-08-02 | Drill Stem Test Performed |
1966-08-03 | Liner Casing Operation Performed |
1966-08-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1966-08-06 | Perforation Treatment Performed - Bullet Perforation |
1967-03-01 | Perforation Treatment Performed - Cement Squeeze |
1967-03-02 | Perforation Treatment Performed - Cement Squeeze |
1967-03-05 | Perforation Treatment Performed - Jet Perforation |
1967-03-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1967-07-05 | Perforation Treatment Performed - Cement Squeeze |
1967-07-08 | Perforation Treatment Performed - Jet Perforation |
1967-07-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1974-01-26 | Perforation Treatment Performed - Cement Squeeze |
1974-02-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1974-02-17 | Perforation Treatment Performed - Jet Perforation |
1978-05-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1984-05-30 | Well Log Performed |
1984-06-04 | Perforation Treatment Performed - Cement Squeeze |
1984-06-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1984-06-06 | Perforation Treatment Performed - Jet Perforation |
1984-06-09 | Perforation Treatment Performed - Jet Perforation |
1984-06-10 | Well Log Performed |
1984-06-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1984-06-12 | Well Log Performed |
1988-01-09 | Perforation Treatment Performed - Chemical Squeeze |
1988-01-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-01-10 | Perforation Treatment Performed - Cement Squeeze |
1988-01-14 | Perforation Treatment Performed - Chemical Squeeze |
1988-01-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-01-15 | Perforation Treatment Performed - Cement Squeeze |
1988-01-18 | Perforation Treatment Performed - Jet Perforation |
1988-01-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-01-22 | Perforation Treatment Performed - Cement Squeeze |
1988-01-26 | Perforation Treatment Performed - Jet Perforation |
1988-01-30 | Perforation Treatment Performed - Cement Squeeze |
1988-02-03 | Well Log Performed |
1988-02-04 | Perforation Treatment Performed - Jet Perforation |
1988-02-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-08-01 | Well Began Injection |
1988-08-01 | Well Fluid changed to Water |
1988-08-01 | Well Type changed to Injection |
2005-06-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1966-08-06 | Bullet Perforation | 1770.00 | 1773.00 | 7 |
1974-01-26 | Cement Squeeze | 1748.90 | 1752.00 | 0 |
1974-02-17 | Perforation | 1857.50 | 1861.70 | 7 |
1974-02-17 | Perforation | 1867.20 | 1872.10 | 7 |
1974-02-17 | Perforation | 1879.10 | 1886.70 | 7 |
1974-02-17 | Acid Treatment | 1857.50 | 1886.70 | 0 |
1978-05-02 | Acid Treatment | 1857.50 | 1886.70 | 0 |
1984-06-04 | Cement Squeeze | 1857.50 | 1886.70 | 0 |
1984-06-06 | Perforation | 1741.60 | 1744.70 | 7 |
1984-06-06 | Acid Treatment | 1741.60 | 1744.70 | 0 |
1984-06-09 | Perforation | 1732.80 | 1734.30 | 7 |
1966-08-06 | Acid Treatment | 1770.00 | 1773.00 | 0 |
1984-06-11 | Acid Treatment | 1732.80 | 1734.30 | 0 |
1988-01-09 | Chemical Squeeze | 1732.80 | 1734.30 | 0 |
1988-01-10 | Acid Treatment | 1732.80 | 1734.30 | 0 |
1988-01-10 | Cement Squeeze | 1732.80 | 1734.30 | 0 |
1988-01-14 | Chemical Squeeze | 1741.60 | 1744.70 | 0 |
1988-01-15 | Acid Treatment | 1741.60 | 1744.70 | 0 |
1988-01-15 | Cement Squeeze | 1741.60 | 1744.70 | 0 |
1988-01-18 | Perforation | 1748.90 | 1752.00 | 7 |
1988-01-18 | Perforation | 1762.40 | 1764.80 | 7 |
1988-01-18 | Perforation | 1770.00 | 1773.00 | 7 |
1967-03-01 | Cement Squeeze | 1770.00 | 1773.00 | 0 |
1988-01-20 | Acid Treatment | 1748.90 | 1773.00 | 0 |
1988-01-22 | Cement Squeeze | 1748.90 | 1773.00 | 0 |
1988-01-26 | Perforation | 1857.50 | 1861.70 | 7 |
1988-01-26 | Perforation | 1867.20 | 1872.10 | 7 |
1988-01-26 | Perforation | 1879.10 | 1886.70 | 7 |
1988-01-30 | Cement Squeeze | 1857.50 | 1886.70 | 0 |
1988-02-04 | Perforation | 1881.00 | 1890.00 | 13 |
1988-02-04 | Perforation | 1724.50 | 1729.00 | 13 |
1988-02-05 | Acid Treatment | 1724.50 | 1890.00 | 0 |
2005-06-03 | Acid Treatment | 1881.00 | 1890.00 | 0 |
1967-03-02 | Cement Squeeze | 1770.00 | 1773.00 | 0 |
1967-03-05 | Perforation | 1762.40 | 1764.80 | 7 |
1967-03-06 | Acid Treatment | 1762.40 | 1764.80 | 0 |
1967-07-05 | Cement Squeeze | 1762.40 | 1764.80 | 0 |
1967-07-08 | Perforation | 1748.90 | 1752.00 | 7 |
1967-07-09 | Acid Treatment | 1748.90 | 1752.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1988 | 0 | 0.0 | 0.0 | 0.0 |
1989 | 0 | 0.0 | 0.0 | 0.0 |
1990 | 0 | 0.0 | 0.0 | 0.0 |
1991 | 0 | 0.0 | 0.0 | 0.0 |
1992 | 0 | 0.0 | 0.0 | 0.0 |
1993 | 0 | 0.0 | 0.0 | 0.0 |
1994 | 0 | 0.0 | 0.0 | 0.0 |
1995 | 0 | 0.0 | 0.0 | 0.0 |
1996 | 0 | 0.0 | 0.0 | 0.0 |
1997 | 0 | 0.0 | 0.0 | 0.0 |
1998 | 0 | 0.0 | 0.0 | 0.0 |
1999 | 0 | 0.0 | 0.0 | 0.0 |
2000 | 0 | 0.0 | 0.0 | 0.0 |
2001 | 0 | 0.0 | 0.0 | 0.0 |
2002 | 0 | 0.0 | 0.0 | 0.0 |
2003 | 0 | 0.0 | 0.0 | 0.0 |
2004 | 0 | 0.0 | 0.0 | 0.0 |
2005 | 0 | 0.0 | 0.0 | 0.0 |
2006 | 0 | 0.0 | 0.0 | 0.0 |
2007 | 0 | 0.0 | 0.0 | 0.0 |
2008 | 0 | 0.0 | 0.0 | 0.0 |
2009 | 0 | 0.0 | 0.0 | 0.0 |
2010 | 0 | 0.0 | 0.0 | 0.0 |
2011 | 0 | 0.0 | 0.0 | 0.0 |
2012 | 0 | 0.0 | 0.0 | 0.0 |
2013 | 0 | 0.0 | 0.0 | 0.0 |
2014 | 0 | 0.0 | 0.0 | 0.0 |
2015 | 0 | 0.0 | 0.0 | 0.0 |
2016 | 0 | 0.0 | 0.0 | 0.0 |
2017 | 0 | 0.0 | 0.0 | 0.0 |
2018 | 0 | 0.0 | 0.0 | 0.0 |
2019 | 0 | 0.0 | 0.0 | 0.0 |
2020 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]