X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1096073507000

Well Details

Well ID: 1096073507000
Loading map...
Location: 00/07-35-109-07W6/0
Location Alias: 00/07-35-09-07 W6M
Location Alias 2: 00/07-35-109-07 W6/00
Country: Canada
Province: Alberta
Township: 109
Meridian: 6
Range: 07
Section: 35
County/Municipality: Mackenzie County
Well Name: HUSKY RAINBOW 7-35-109-7
Operator Name: Husky Oil Operations Limited
License Number: 0030593
License Date: 1966-06-21
License Status: Issued
Spud Date: 1966-06-22
Final Drill Date: 1966-07-30
Well Total Depth: 1955.30 m
Surface Hole Latitude: 58.504410
Surface Hole Longitude: -119.041515

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-06-21 Obtained License
1966-07-04 Drill Stem Test Performed
1966-07-21 Drill Stem Test Performed
1966-07-23 Drill Stem Test Performed
1966-07-25 Drill Stem Test Performed
1966-07-30 Finished Drilling
1966-07-30 Well Mode changed to Drilled and Cased
1966-07-31 Drill Stem Test Performed
1966-08-02 Drill Stem Test Performed
1966-08-03 Liner Casing Operation Performed
1966-08-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-08-06 Perforation Treatment Performed - Bullet Perforation
1966-08-09 Well Began Production
1966-08-09 Well Fluid changed to Crude Oil
1966-08-09 Well Mode changed to Flowing
1967-03-01 Perforation Treatment Performed - Cement Squeeze
1967-03-02 Perforation Treatment Performed - Cement Squeeze
1967-03-05 Perforation Treatment Performed - Jet Perforation
1967-03-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-07-05 Perforation Treatment Performed - Cement Squeeze
1967-07-08 Perforation Treatment Performed - Jet Perforation
1967-07-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-01-26 Perforation Treatment Performed - Cement Squeeze
1974-02-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-02-17 Perforation Treatment Performed - Jet Perforation
1975-04-24 Well Began Injection
1975-04-24 Well Fluid changed to Water
1975-04-24 Well Type changed to Injection
1978-05-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-05-30 Well Log Performed
1984-06-04 Perforation Treatment Performed - Cement Squeeze
1984-06-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-06-06 Perforation Treatment Performed - Jet Perforation
1984-06-09 Perforation Treatment Performed - Jet Perforation
1984-06-10 Well Log Performed
1984-06-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-06-12 Well Log Performed
1984-08-27 Well Fluid changed to Crude Oil
1984-08-27 Well Mode changed to Pumping
1986-09-01 Well Fluid changed to Crude Oil
1986-09-01 Well Mode changed to Suspended
1988-01-09 Perforation Treatment Performed - Chemical Squeeze
1988-01-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-01-10 Perforation Treatment Performed - Cement Squeeze
1988-01-14 Perforation Treatment Performed - Chemical Squeeze
1988-01-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-01-15 Perforation Treatment Performed - Cement Squeeze
1988-01-18 Perforation Treatment Performed - Jet Perforation
1988-01-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-01-22 Perforation Treatment Performed - Cement Squeeze
1988-01-26 Perforation Treatment Performed - Jet Perforation
1988-01-30 Perforation Treatment Performed - Cement Squeeze
1988-02-03 Well Log Performed
1988-02-04 Perforation Treatment Performed - Jet Perforation
1988-02-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-05-23 Well Fluid changed to Crude Oil
1988-05-23 Well Mode changed to Pumping
1991-03-29 Well Fluid changed to Crude Oil
1991-03-29 Well Mode changed to Suspended
2005-06-03 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-08-06 Bullet Perforation 1770.00 1773.00 7
1974-01-26 Cement Squeeze 1748.90 1752.00 0
1974-02-17 Perforation 1857.50 1861.70 7
1974-02-17 Perforation 1867.20 1872.10 7
1974-02-17 Perforation 1879.10 1886.70 7
1974-02-17 Acid Treatment 1857.50 1886.70 0
1978-05-02 Acid Treatment 1857.50 1886.70 0
1984-06-04 Cement Squeeze 1857.50 1886.70 0
1984-06-06 Perforation 1741.60 1744.70 7
1984-06-06 Acid Treatment 1741.60 1744.70 0
1984-06-09 Perforation 1732.80 1734.30 7
1966-08-06 Acid Treatment 1770.00 1773.00 0
1984-06-11 Acid Treatment 1732.80 1734.30 0
1988-01-09 Chemical Squeeze 1732.80 1734.30 0
1988-01-10 Acid Treatment 1732.80 1734.30 0
1988-01-10 Cement Squeeze 1732.80 1734.30 0
1988-01-14 Chemical Squeeze 1741.60 1744.70 0
1988-01-15 Acid Treatment 1741.60 1744.70 0
1988-01-15 Cement Squeeze 1741.60 1744.70 0
1988-01-18 Perforation 1748.90 1752.00 7
1988-01-18 Perforation 1762.40 1764.80 7
1988-01-18 Perforation 1770.00 1773.00 7
1967-03-01 Cement Squeeze 1770.00 1773.00 0
1988-01-20 Acid Treatment 1748.90 1773.00 0
1988-01-22 Cement Squeeze 1748.90 1773.00 0
1988-01-26 Perforation 1857.50 1861.70 7
1988-01-26 Perforation 1867.20 1872.10 7
1988-01-26 Perforation 1879.10 1886.70 7
1988-01-30 Cement Squeeze 1857.50 1886.70 0
1988-02-04 Perforation 1881.00 1890.00 13
1988-02-04 Perforation 1724.50 1729.00 13
1988-02-05 Acid Treatment 1724.50 1890.00 0
2005-06-03 Acid Treatment 1881.00 1890.00 0
1967-03-02 Cement Squeeze 1770.00 1773.00 0
1967-03-05 Perforation 1762.40 1764.80 7
1967-03-06 Acid Treatment 1762.40 1764.80 0
1967-07-05 Cement Squeeze 1762.40 1764.80 0
1967-07-08 Perforation 1748.90 1752.00 7
1967-07-09 Acid Treatment 1748.90 1752.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 2426 0.0 0.0 0.0
1985 4550 0.0 0.0 0.0
1986 3478 0.0 0.0 0.0
1988 2646 0.0 0.0 0.0
1989 1556 0.0 0.0 0.0
1990 194 0.0 0.0 0.0
1991 1513 0.0 0.0 0.0

For data sources see[5]

References