X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1096072606002

Well Details

Well ID: 1096072606002
Loading map...
Location: 00/06-26-109-07W6/2
Location Alias: 00/06-26-09-07 W6M
Location Alias 2: 00/06-26-109-07 W6/02
Country: Canada
Province: Alberta
Township: 109
Meridian: 6
Range: 07
Section: 26
County/Municipality: Mackenzie County
Well Name: HUSKY MOBIL RAINBOW 7-26-109-7
Operator Name: Husky Oil Operations Limited
License Number: 0031350
License Date: 1966-11-25
License Status: Suspension
Spud Date: 1966-12-03
Final Drill Date: 1967-01-06
Well Total Depth: 1964.40 m
Surface Hole Latitude: 58.491174
Surface Hole Longitude: -119.050134

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-11-25 Obtained License
1966-12-22 Drill Stem Test Performed
1966-12-24 Drill Stem Test Performed
1966-12-28 Drill Stem Test Performed
1966-12-31 Drill Stem Test Performed
1967-01-02 Drill Stem Test Performed
1967-01-06 Finished Drilling
1967-01-06 Well Mode changed to Drilled and Cased
1967-01-08 Drill Stem Test Performed
1967-01-10 Liner Casing Operation Performed
1967-02-11 Perforation Treatment Performed - Jet Perforation
1967-02-12 Perforation Treatment Performed - Cement Squeeze
1967-02-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-02-18 Perforation Treatment Performed - Jet Perforation
1967-03-13 Perforation Treatment Performed - Cement Squeeze
1967-03-16 Perforation Treatment Performed - Acid Wash - No Pressure
1967-03-16 Perforation Treatment Performed - Jet Perforation
1967-11-17 Perforation Treatment Performed - Cement Squeeze
1967-11-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-11-20 Perforation Treatment Performed - Jet Perforation
1988-01-18 Perforation Treatment Performed - Cement Squeeze
1988-01-26 Perforation Treatment Performed - Jet Perforation
1988-01-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-03-07 Well Log Performed
1992-03-09 Perforation Treatment Performed - Jet Perforation
1992-03-09 Well Log Performed
1992-03-13 Perforation Treatment Performed - Remedial Casing
1993-05-22 Well Log Performed
1993-05-23 Perforation Treatment Performed - Jet Perforation
1993-05-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-05-27 Well Log Performed
1993-05-29 Perforation Treatment Performed - Cement Squeeze
1993-05-30 Perforation Treatment Performed - Casing Patch (Over Perfs)
1993-06-01 Well Log Performed
1993-06-02 Perforation Treatment Performed - Jet Perforation
1993-06-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-03-07 Well Began Injection
1997-03-07 Well Fluid changed to Gas
1997-03-07 Well Type changed to Injection
1997-08-26 Well Log Performed
1997-09-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-09-24 Plug Back Performed
1997-09-24 Well Log Performed
1997-11-21 Perforation Treatment Performed - Bridge Plug No Cement Required
1997-11-21 Well Fluid changed to Gas
1997-11-21 Well Mode changed to Abandoned and Whipstocked
1997-11-21 Well Type changed to Injection
1998-08-29 Well Log Performed
2002-05-14 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-02-11 Perforation 1720.30 1723.00 3
1967-11-20 Acid Treatment 1723.60 1728.20 0
1988-01-18 Cement Squeeze 1723.60 1728.20 0
1988-01-26 Perforation 1790.00 1792.00 13
1988-01-26 Perforation 1795.00 1798.00 13
1988-01-29 Acid Treatment 1795.00 1798.00 0
1992-03-09 Perforation 480.00 481.80 13
1992-03-13 Remedial Casing Cementing 480.00 481.80 0
1993-05-23 Perforation 1722.40 1725.40 13
1993-05-23 Perforation 1778.50 1780.00 13
1993-05-23 Perforation 1784.40 1786.20 13
1967-02-12 Cement Squeeze 1720.30 1723.00 0
1993-05-26 Acid Treatment 1722.40 1786.20 0
1993-05-29 Cement Squeeze 1722.40 1798.00 0
1993-05-30 Casing Patch 480.00 481.80 0
1993-06-02 Perforation 1722.40 1725.40 13
1993-06-02 Perforation 1778.50 1780.00 13
1993-06-02 Perforation 1784.40 1786.20 13
1993-06-02 Perforation 1790.00 1792.00 13
1993-06-02 Perforation 1795.00 1798.00 13
1993-06-03 Acid Treatment 1722.40 1798.00 0
1997-09-24 Packing Device Capped w/Cement 1707.00 1715.00 0
1967-02-18 Perforation 1795.00 1798.00 7
1997-11-21 Bridge Plug, No Cement 1600.00 1600.00 0
1967-02-18 Acid Treatment 1795.00 1798.00 0
1967-03-13 Cement Squeeze 1795.00 1798.00 0
1967-03-16 Perforation 1794.10 1795.00 7
1967-03-16 Acid Wash 1794.10 1795.00 0
1967-11-17 Cement Squeeze 1794.10 1795.00 0
1967-11-20 Perforation 1723.60 1728.20 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 0 0.0 0.0 0.0

For data sources see[5]

References