If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 1096071807030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":58.460997,"lon":-119.151825,"icon":""}]} |
Location: 03/07-18-109-07W6/0 | |
Location Alias: 03/07-18-09-07 W6M | |
Location Alias 2: 03/07-18-109-07 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 109 | |
Meridian: 6 | |
Range: 07 | |
Section: 18 | |
County/Municipality: Mackenzie County | |
Well Name: HUSKY MOBIL RAINBOW 15-7KR-109-7 | |
Operator Name: Husky Oil Operations Limited | |
License Number: 0120124 | |
License Date: 1985-12-06 | |
License Status: Suspension | |
Spud Date: 1985-12-10 | |
Final Drill Date: 1986-01-03 | |
Well Total Depth: 1918.00 m | |
Surface Hole Latitude: 58.460997 | |
Surface Hole Longitude: -119.151825 |
Date | Event |
---|---|
1985-12-06 | Obtained License |
1985-12-11 | Surface Casing Operation Performed |
1985-12-23 | Kick Occurred |
1985-12-23 | Lost Circulation Occurred |
1985-12-30 | Well Log Performed |
1986-01-01 | Intermediate Casing Operation Performed |
1986-01-03 | Finished Drilling |
1986-01-03 | Well Mode changed to Drilled and Cased |
1986-01-04 | Well Log Performed |
1986-01-05 | Liner Casing Operation Performed |
1986-01-07 | Rig Released |
1986-01-07 | Well Log Performed |
1986-02-03 | Perforation Treatment Performed - Jet Perforation |
1986-02-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-02-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-02-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-02-10 | Perforation Treatment Performed - Jet Perforation |
1986-02-13 | Perforation Treatment Performed - Cement Squeeze |
1986-02-19 | Perforation Treatment Performed - Jet Perforation |
1986-02-26 | Perforation Treatment Performed - Cement Squeeze |
1986-03-05 | Perforation Treatment Performed - Jet Perforation |
1986-03-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-03-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-03-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-03-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-03-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-03-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-03-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-03-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-03-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-04-02 | Well Began Production |
1986-04-02 | Well Fluid changed to Crude Oil |
1986-04-02 | Well Mode changed to Flowing |
1986-05-06 | Well Fluid changed to Crude Oil |
1986-05-06 | Well Mode changed to Flowing |
1993-12-03 | Well Log Performed |
1994-05-18 | Perforation Treatment Performed - Acid Wash - No Pressure |
1996-05-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-05-29 | Plug Back Performed |
1996-05-29 | Well Fluid changed to Crude Oil |
1996-05-29 | Well Mode changed to Abandoned Zone |
1996-05-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-05-30 | Plug Back Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1986-02-03 | Perforation | 1884.00 | 1886.00 | 13 |
1986-02-19 | Perforation | 1710.00 | 1711.00 | 13 |
1986-02-19 | Perforation | 1739.00 | 1740.00 | 13 |
1986-02-26 | Cement Squeeze | 1710.00 | 1740.00 | 0 |
1986-03-05 | Perforation | 1728.00 | 1729.50 | 13 |
1986-03-05 | Perforation | 1722.00 | 1724.00 | 13 |
1986-03-05 | Perforation | 1715.00 | 1717.50 | 13 |
1986-03-05 | Perforation | 1709.80 | 1711.00 | 13 |
1986-03-05 | Perforation | 1706.00 | 1709.00 | 13 |
1986-03-05 | Perforation | 1702.00 | 1705.50 | 13 |
1986-03-05 | Perforation | 1700.00 | 1701.50 | 13 |
1986-02-03 | Perforation | 1880.00 | 1881.50 | 13 |
1986-03-05 | Perforation | 1694.00 | 1696.00 | 13 |
1986-03-05 | Perforation | 1686.00 | 1688.00 | 13 |
1986-03-05 | Perforation | 1674.50 | 1675.80 | 13 |
1986-03-05 | Perforation | 1669.00 | 1670.50 | 13 |
1986-03-06 | Acid Treatment | 1669.00 | 1670.50 | 0 |
1986-03-07 | Acid Treatment | 1728.00 | 1729.50 | 0 |
1986-03-08 | Acid Treatment | 1722.00 | 1724.00 | 0 |
1986-03-09 | Acid Treatment | 1715.00 | 1717.50 | 0 |
1986-03-10 | Acid Treatment | 1700.00 | 1711.00 | 0 |
1986-03-11 | Acid Treatment | 1694.00 | 1696.00 | 0 |
1986-02-03 | Perforation | 1874.50 | 1878.00 | 13 |
1986-03-14 | Acid Treatment | 1669.00 | 1675.80 | 0 |
1986-03-15 | Acid Treatment | 1669.00 | 1675.80 | 0 |
1986-03-17 | Acid Treatment | 1669.00 | 1690.50 | 0 |
1986-03-17 | Acid Treatment | 1674.50 | 1675.80 | 0 |
1994-05-18 | Acid Wash | 1868.00 | 1886.00 | 0 |
1996-05-29 | Packing Device Capped w/Cement | 1851.50 | 1859.50 | 0 |
1996-05-30 | Packing Device Capped w/Cement | 1647.50 | 1655.50 | 0 |
1986-02-03 | Perforation | 1868.00 | 1872.50 | 13 |
1986-02-04 | Acid Treatment | 1868.00 | 1886.00 | 0 |
1986-02-06 | Acid Treatment | 1868.00 | 1886.00 | 0 |
1986-02-07 | Acid Treatment | 1868.00 | 1872.50 | 0 |
1986-02-10 | Perforation | 1782.20 | 1785.20 | 13 |
1986-02-13 | Cement Squeeze | 1782.20 | 1785.20 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1986 | 5691 | 0.0 | 0.0 | 0.0 |
1987 | 8438 | 0.0 | 0.0 | 0.0 |
1988 | 8361 | 0.0 | 0.0 | 0.0 |
1989 | 8650 | 0.0 | 0.0 | 0.0 |
1990 | 8382 | 0.0 | 0.0 | 0.0 |
1991 | 7633 | 0.0 | 0.0 | 0.0 |
1992 | 8633 | 0.0 | 0.0 | 0.0 |
1993 | 8188 | 0.0 | 0.0 | 0.0 |
1994 | 3358 | 0.0 | 0.0 | 0.0 |
1995 | 6487 | 0.0 | 0.0 | 0.0 |
1996 | 1744 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1985-12-23 | Lost Circulation | 1601.00 | 1608.00 |
1985-12-23 | Kick | 1601.00 | 1601.00 |
For data sources see[6]