X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1096071807030

Well Details

Well ID: 1096071807030
Loading map...
Location: 03/07-18-109-07W6/0
Location Alias: 03/07-18-09-07 W6M
Location Alias 2: 03/07-18-109-07 W6/00
Country: Canada
Province: Alberta
Township: 109
Meridian: 6
Range: 07
Section: 18
County/Municipality: Mackenzie County
Well Name: HUSKY MOBIL RAINBOW 15-7KR-109-7
Operator Name: Husky Oil Operations Limited
License Number: 0120124
License Date: 1985-12-06
License Status: Suspension
Spud Date: 1985-12-10
Final Drill Date: 1986-01-03
Well Total Depth: 1918.00 m
Surface Hole Latitude: 58.460997
Surface Hole Longitude: -119.151825

For data sources see[1][2]

Well History

Date Event
1985-12-06 Obtained License
1985-12-11 Surface Casing Operation Performed
1985-12-23 Kick Occurred
1985-12-23 Lost Circulation Occurred
1985-12-30 Well Log Performed
1986-01-01 Intermediate Casing Operation Performed
1986-01-03 Finished Drilling
1986-01-03 Well Mode changed to Drilled and Cased
1986-01-04 Well Log Performed
1986-01-05 Liner Casing Operation Performed
1986-01-07 Rig Released
1986-01-07 Well Log Performed
1986-02-03 Perforation Treatment Performed - Jet Perforation
1986-02-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-02-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-02-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-02-10 Perforation Treatment Performed - Jet Perforation
1986-02-13 Perforation Treatment Performed - Cement Squeeze
1986-02-19 Perforation Treatment Performed - Jet Perforation
1986-02-26 Perforation Treatment Performed - Cement Squeeze
1986-03-05 Perforation Treatment Performed - Jet Perforation
1986-03-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-03-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-03-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-03-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-03-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-03-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-03-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-03-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-03-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-04-02 Well Began Production
1986-04-02 Well Fluid changed to Crude Oil
1986-04-02 Well Mode changed to Flowing
1986-05-06 Well Fluid changed to Crude Oil
1986-05-06 Well Mode changed to Flowing
1993-12-03 Well Log Performed
1994-05-18 Perforation Treatment Performed - Acid Wash - No Pressure
1996-05-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-05-29 Plug Back Performed
1996-05-29 Well Fluid changed to Crude Oil
1996-05-29 Well Mode changed to Abandoned Zone
1996-05-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-05-30 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-02-03 Perforation 1884.00 1886.00 13
1986-02-19 Perforation 1710.00 1711.00 13
1986-02-19 Perforation 1739.00 1740.00 13
1986-02-26 Cement Squeeze 1710.00 1740.00 0
1986-03-05 Perforation 1728.00 1729.50 13
1986-03-05 Perforation 1722.00 1724.00 13
1986-03-05 Perforation 1715.00 1717.50 13
1986-03-05 Perforation 1709.80 1711.00 13
1986-03-05 Perforation 1706.00 1709.00 13
1986-03-05 Perforation 1702.00 1705.50 13
1986-03-05 Perforation 1700.00 1701.50 13
1986-02-03 Perforation 1880.00 1881.50 13
1986-03-05 Perforation 1694.00 1696.00 13
1986-03-05 Perforation 1686.00 1688.00 13
1986-03-05 Perforation 1674.50 1675.80 13
1986-03-05 Perforation 1669.00 1670.50 13
1986-03-06 Acid Treatment 1669.00 1670.50 0
1986-03-07 Acid Treatment 1728.00 1729.50 0
1986-03-08 Acid Treatment 1722.00 1724.00 0
1986-03-09 Acid Treatment 1715.00 1717.50 0
1986-03-10 Acid Treatment 1700.00 1711.00 0
1986-03-11 Acid Treatment 1694.00 1696.00 0
1986-02-03 Perforation 1874.50 1878.00 13
1986-03-14 Acid Treatment 1669.00 1675.80 0
1986-03-15 Acid Treatment 1669.00 1675.80 0
1986-03-17 Acid Treatment 1669.00 1690.50 0
1986-03-17 Acid Treatment 1674.50 1675.80 0
1994-05-18 Acid Wash 1868.00 1886.00 0
1996-05-29 Packing Device Capped w/Cement 1851.50 1859.50 0
1996-05-30 Packing Device Capped w/Cement 1647.50 1655.50 0
1986-02-03 Perforation 1868.00 1872.50 13
1986-02-04 Acid Treatment 1868.00 1886.00 0
1986-02-06 Acid Treatment 1868.00 1886.00 0
1986-02-07 Acid Treatment 1868.00 1872.50 0
1986-02-10 Perforation 1782.20 1785.20 13
1986-02-13 Cement Squeeze 1782.20 1785.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 5691 0.0 0.0 0.0
1987 8438 0.0 0.0 0.0
1988 8361 0.0 0.0 0.0
1989 8650 0.0 0.0 0.0
1990 8382 0.0 0.0 0.0
1991 7633 0.0 0.0 0.0
1992 8633 0.0 0.0 0.0
1993 8188 0.0 0.0 0.0
1994 3358 0.0 0.0 0.0
1995 6487 0.0 0.0 0.0
1996 1744 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1985-12-23 Lost Circulation 1601.00 1608.00
1985-12-23 Kick 1601.00 1601.00

For data sources see[6]

References