X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1096071806002

Well Details

Well ID: 1096071806002
Loading map...
Location: 00/06-18-109-07W6/2
Location Alias: 00/06-18-09-07 W6M
Location Alias 2: 00/06-18-109-07 W6/02
Country: Canada
Province: Alberta
Township: 109
Meridian: 6
Range: 07
Section: 18
County/Municipality: Mackenzie County
Well Name: HUSKY MOBIL RAINBOW 6-18-109-7
Operator Name: Husky Oil Operations Limited
License Number: 0066544
License Date: 1977-11-04
License Status: Suspension
Spud Date: 1977-11-07
Final Drill Date: 1977-12-22
Well Total Depth: 1925.00 m
Surface Hole Latitude: 58.461665
Surface Hole Longitude: -119.159851

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-11-04 Obtained License
1977-12-07 Well Log Performed
1977-12-08 Drill Stem Test Performed
1977-12-15 Blow Occurred
1977-12-22 Finished Drilling
1977-12-22 Well Log Performed
1977-12-22 Well Mode changed to Drilled and Cased
1977-12-23 Liner Casing Operation Performed
1978-06-22 Well Log Performed
1978-06-23 Well Log Performed
1978-06-24 Perforation Treatment Performed - Jet Perforation
1978-06-25 Perforation Treatment Performed - Jet Perforation
1978-06-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-06-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-06-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-06-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-07-11 Well Began Production
1978-07-11 Well Fluid changed to Crude Oil
1978-07-11 Well Mode changed to Flowing
1980-05-26 Well Fluid changed to Crude Oil
1980-05-26 Well Mode changed to Suspended
1983-01-12 Perforation Treatment Performed - Cement Squeeze
1983-01-29 Perforation Treatment Performed - Fractured
1983-02-01 Well Fluid changed to Crude Oil
1983-02-01 Well Mode changed to Pumping
1983-03-08 Perforation Treatment Performed - Jet Perforation
1988-06-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-06-29 Perforation Treatment Performed - Jet Perforation
1988-06-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-07-01 Perforation Treatment Performed - Cement Squeeze
1988-07-08 Perforation Treatment Performed - Open-Hole Completion
1988-07-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-07-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-07-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-11-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-09-01 Well Fluid changed to Crude Oil
2019-09-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-06-24 Perforation 1862.90 1873.60 7
1978-06-25 Perforation 1718.50 1721.20 7
1978-06-25 Perforation 1715.70 1716.60 7
1978-06-25 Perforation 1708.70 1710.50 7
1978-06-25 Perforation 1706.00 1706.90 7
1978-06-25 Perforation 1703.40 1704.30 7
1978-06-25 Perforation 1700.20 1702.00 7
1978-06-25 Perforation 1695.30 1696.20 7
1978-06-25 Perforation 1693.50 1694.10 7
1978-06-25 Perforation 1690.10 1691.00 7
1978-06-25 Perforation 1686.50 1687.50 7
1978-06-25 Perforation 1798.30 1799.50 7
1978-06-25 Perforation 1680.70 1681.90 7
1978-06-26 Acid Treatment 1862.90 1873.60 0
1978-06-26 Acid Treatment 1798.30 1799.50 0
1978-06-27 Acid Treatment 1776.70 1779.40 0
1978-06-28 Acid Treatment 1722.70 1750.20 0
1978-06-28 Acid Treatment 1715.70 1750.20 0
1978-06-28 Acid Treatment 1693.50 1710.50 0
1978-06-29 Acid Treatment 1680.70 1696.20 0
1983-01-12 Cement Squeeze 1776.70 1799.50 0
1983-01-12 Cement Squeeze 1862.90 1873.60 0
1978-06-25 Perforation 1776.70 1779.40 7
1983-01-29 Fracture 1680.70 1750.20 0
1983-03-08 Perforation 1878.80 1882.40 13
1988-06-10 Acid Treatment 1878.80 1882.40 0
1988-06-29 Perforation 1892.00 1894.00 13
1988-06-30 Acid Treatment 1878.80 1894.00 0
1988-07-01 Cement Squeeze 1878.80 1894.00 0
1988-07-08 Open Hole/Barefoot Completion 1908.00 1925.00 0
1988-07-10 Acid Treatment 1908.00 1925.00 0
1988-07-14 Acid Treatment 1715.70 1750.20 0
1988-07-15 Acid Treatment 1680.70 1710.50 0
1978-06-25 Perforation 1749.20 1750.20 7
2007-11-26 Packing Device Capped w/Cement 1850.00 1858.00 0
1978-06-25 Perforation 1741.60 1743.00 7
1978-06-25 Perforation 1732.80 1733.70 7
1978-06-25 Perforation 1729.40 1730.00 7
1978-06-25 Perforation 1727.00 1727.60 7
1978-06-25 Perforation 1722.70 1724.90 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 1448 0.0 0.0 0.0
1979 718 0.0 0.0 0.0
1983 6612 0.0 0.0 0.0
1984 7116 0.0 0.0 0.0
1985 7519 0.0 0.0 0.0
1986 8456 0.0 0.0 0.0
1987 7712 0.0 0.0 0.0
1988 5626 0.0 0.0 0.0
1989 8127 0.0 0.0 0.0
1990 8219 0.0 0.0 0.0
1991 7331 0.0 0.0 0.0
1992 7975 0.0 0.0 0.0
1993 8256 0.0 0.0 0.0
1994 8438 0.0 0.0 0.0
1995 8677 0.0 0.0 0.0
1996 8663 0.0 0.0 0.0
1997 8697 0.0 0.0 0.0
1998 2652 0.0 0.0 0.0
2005 6165 0.0 0.0 0.0
2006 7697 0.0 0.0 0.0
2007 8073 0.0 0.0 0.0
2008 8577 0.0 0.0 0.0
2009 8254 0.0 0.0 0.0
2010 8740 0.0 0.0 0.0
2011 7248 0.0 0.0 0.0
2012 4733 0.0 0.0 0.0
2013 8180 0.0 0.0 0.0
2014 7164 0.0 0.0 0.0
2015 7819 0.0 0.0 0.0
2016 7912 0.0 0.0 0.0
2017 8015 0.0 0.0 0.0
2018 8188 0.0 0.0 0.0
2019 4557 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1977-12-15 Blow 1824.00 1824.00

For data sources see[6]

References