X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1096071802002

Well Details

Well ID: 1096071802002
Loading map...
Location: 00/02-18-109-07W6/2
Location Alias: 00/02-18-09-07 W6M
Location Alias 2: 00/02-18-109-07 W6/02
Country: Canada
Province: Alberta
Township: 109
Meridian: 6
Range: 07
Section: 18
County/Municipality: Mackenzie County
Well Name: HUSKY MOBIL RAIN 2-18-109-7
Operator Name: Husky Oil Operations Limited
License Number: 0041590
License Date: 1971-12-10
License Status: Suspension
Spud Date: 1971-12-22
Final Drill Date: 1972-01-14
Well Total Depth: 1905.90 m
Surface Hole Latitude: 58.458546
Surface Hole Longitude: -119.153508

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1971-12-10 Obtained License
1972-01-14 Finished Drilling
1972-01-16 Liner Casing Operation Performed
1972-02-06 Perforation Treatment Performed - Jet Perforation
1972-02-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-05-04 Well Log Performed
1982-11-14 Perforation Treatment Performed - Cement Squeeze
1983-01-09 Perforation Treatment Performed - Jet Perforation
1983-01-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-06-23 Perforation Treatment Performed - Jet Perforation
1984-06-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-04-16 Perforation Treatment Performed - Jet Perforation
1989-04-18 Perforation Treatment Performed - Cement Squeeze
1989-04-22 Well Log Performed
1989-04-24 Perforation Treatment Performed - Jet Perforation
1989-04-24 Well Mode changed to Drilled and Cased
1989-04-25 Perforation Treatment Performed - Jet Perforation
1989-04-26 Perforation Treatment Performed - Fractured
1989-04-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-04-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-05-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-05-11 Well Began Injection
1989-05-11 Well Fluid changed to Water
1989-05-11 Well Type changed to Injection
1993-01-25 Well Log Performed
1995-04-24 Perforation Treatment Performed - Jet Perforation
1995-04-24 Well Log Performed
1995-04-28 Well Log Performed
1995-05-01 Well Log Performed
1995-05-05 Perforation Treatment Performed - Cement Squeeze
1995-05-05 Well Log Performed
1995-05-09 Perforation Treatment Performed - Jet Perforation
1995-05-09 Well Log Performed
1995-05-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-05-13 Well Log Performed
1996-06-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-07-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-09-01 Well Fluid changed to Water
2019-09-01 Well Mode changed to Suspended
2019-09-01 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1972-02-06 Perforation 1853.20 1858.10 7
1989-04-16 Perforation 1766.60 1769.70 13
1989-04-18 Cement Squeeze 1744.70 1769.70 0
1989-04-24 Perforation 1699.60 1702.00 20
1989-04-24 Perforation 1705.70 1706.90 20
1989-04-24 Perforation 1709.30 1711.10 20
1989-04-24 Perforation 1713.60 1715.40 20
1989-04-24 Perforation 1719.70 1721.50 20
1989-04-24 Perforation 1724.60 1727.60 20
1989-04-25 Perforation 1675.20 1676.40 20
1989-04-25 Perforation 1681.30 1686.20 20
1972-02-07 Acid Treatment 1853.20 1858.10 0
1989-04-25 Perforation 1692.20 1693.50 20
1989-04-25 Perforation 1695.90 1696.50 20
1989-04-26 Fracture 1675.20 1702.00 0
1989-04-27 Acid Treatment 1675.20 1727.60 0
1989-04-27 Acid Treatment 1705.70 1727.60 0
1989-04-28 Acid Treatment 1675.20 1702.00 0
1989-05-01 Acid Treatment 1675.20 1727.60 0
1995-04-24 Perforation 1887.30 1888.50 13
1995-04-24 Perforation 1891.30 1893.10 13
1995-05-05 Cement Squeeze 1869.50 1893.10 0
1982-11-14 Cement Squeeze 1853.20 1858.10 0
1995-05-09 Perforation 1884.30 1884.90 13
1995-05-09 Perforation 1887.60 1888.50 13
1995-05-09 Perforation 1891.60 1893.10 13
1995-05-10 Acid Treatment 1884.30 1893.10 0
1996-06-08 Acid Treatment 1884.30 1893.10 0
1996-07-28 Acid Treatment 1884.30 1893.10 0
1983-01-09 Perforation 1870.00 1875.00 7
1983-01-12 Acid Treatment 1870.00 1875.00 0
1984-06-23 Perforation 1882.30 1883.30 13
1984-06-23 Perforation 1876.90 1879.20 13
1984-06-24 Acid Treatment 1876.90 1879.20 0
1989-04-16 Perforation 1744.70 1749.60 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0

For data sources see[5]

References