X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1096071802000

Well Details

Well ID: 1096071802000
Loading map...
Location: 00/02-18-109-07W6/0
Location Alias: 00/02-18-09-07 W6M
Location Alias 2: 00/02-18-109-07 W6/00
Country: Canada
Province: Alberta
Township: 109
Meridian: 6
Range: 07
Section: 18
County/Municipality: Mackenzie County
Well Name: HUSKY MOBIL RAIN 2-18-109-7
Operator Name: Husky Oil Operations Limited
License Number: 0041590
License Date: 1971-12-10
License Status: Suspension
Spud Date: 1971-12-22
Final Drill Date: 1972-01-14
Well Total Depth: 1905.90 m
Surface Hole Latitude: 58.458546
Surface Hole Longitude: -119.153508

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1971-12-10 Obtained License
1972-01-14 Finished Drilling
1972-01-14 Well Mode changed to Drilled and Cased
1972-01-16 Liner Casing Operation Performed
1972-02-06 Perforation Treatment Performed - Jet Perforation
1972-02-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-06-12 Well Began Production
1972-06-12 Well Fluid changed to Crude Oil
1972-06-12 Well Mode changed to Flowing
1982-05-04 Well Log Performed
1982-11-14 Perforation Treatment Performed - Cement Squeeze
1983-01-09 Perforation Treatment Performed - Jet Perforation
1983-01-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-06-23 Perforation Treatment Performed - Jet Perforation
1984-06-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-04-16 Perforation Treatment Performed - Jet Perforation
1989-04-18 Perforation Treatment Performed - Cement Squeeze
1989-04-22 Well Log Performed
1989-04-24 Perforation Treatment Performed - Jet Perforation
1989-04-24 Well Fluid changed to Crude Oil
1989-04-24 Well Mode changed to Flowing
1989-04-25 Perforation Treatment Performed - Jet Perforation
1989-04-26 Perforation Treatment Performed - Fractured
1989-04-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-04-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-05-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-01-25 Well Log Performed
1995-04-24 Perforation Treatment Performed - Jet Perforation
1995-04-24 Well Log Performed
1995-04-28 Well Log Performed
1995-05-01 Well Log Performed
1995-05-05 Perforation Treatment Performed - Cement Squeeze
1995-05-05 Well Log Performed
1995-05-09 Perforation Treatment Performed - Jet Perforation
1995-05-09 Well Log Performed
1995-05-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-05-13 Well Log Performed
1996-06-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-07-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-10-01 Well Fluid changed to Crude Oil
1997-10-01 Well Mode changed to Suspended
2000-01-17 Well Began Injection
2000-01-17 Well Fluid changed to Water
2000-01-17 Well Type changed to Injection
2005-11-23 Well Fluid changed to Water
2005-11-23 Well Mode changed to Suspended
2005-11-23 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1972-02-06 Perforation 1853.20 1858.10 7
1989-04-16 Perforation 1766.60 1769.70 13
1989-04-18 Cement Squeeze 1744.70 1769.70 0
1989-04-24 Perforation 1699.60 1702.00 20
1989-04-24 Perforation 1705.70 1706.90 20
1989-04-24 Perforation 1709.30 1711.10 20
1989-04-24 Perforation 1713.60 1715.40 20
1989-04-24 Perforation 1719.70 1721.50 20
1989-04-24 Perforation 1724.60 1727.60 20
1989-04-25 Perforation 1675.20 1676.40 20
1989-04-25 Perforation 1681.30 1686.20 20
1972-02-07 Acid Treatment 1853.20 1858.10 0
1989-04-25 Perforation 1692.20 1693.50 20
1989-04-25 Perforation 1695.90 1696.50 20
1989-04-26 Fracture 1675.20 1702.00 0
1989-04-27 Acid Treatment 1675.20 1727.60 0
1989-04-27 Acid Treatment 1705.70 1727.60 0
1989-04-28 Acid Treatment 1675.20 1702.00 0
1989-05-01 Acid Treatment 1675.20 1727.60 0
1995-04-24 Perforation 1887.30 1888.50 13
1995-04-24 Perforation 1891.30 1893.10 13
1995-05-05 Cement Squeeze 1869.50 1893.10 0
1982-11-14 Cement Squeeze 1853.20 1858.10 0
1995-05-09 Perforation 1884.30 1884.90 13
1995-05-09 Perforation 1887.60 1888.50 13
1995-05-09 Perforation 1891.60 1893.10 13
1995-05-10 Acid Treatment 1884.30 1893.10 0
1996-06-08 Acid Treatment 1884.30 1893.10 0
1996-07-28 Acid Treatment 1884.30 1893.10 0
1983-01-09 Perforation 1870.00 1875.00 7
1983-01-12 Acid Treatment 1870.00 1875.00 0
1984-06-23 Perforation 1882.30 1883.30 13
1984-06-23 Perforation 1876.90 1879.20 13
1984-06-24 Acid Treatment 1876.90 1879.20 0
1989-04-16 Perforation 1744.70 1749.60 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1972 1622 0.0 0.0 0.0
1973 7315 0.0 0.0 0.0
1974 8148 0.0 0.0 0.0
1975 7850 0.0 0.0 0.0
1976 7951 0.0 0.0 0.0
1977 7760 0.0 0.0 0.0
1978 6996 0.0 0.0 0.0
1979 8502 0.0 0.0 0.0
1980 8578 0.0 0.0 0.0
1981 8405 0.0 0.0 0.0
1982 6904 0.0 0.0 0.0
1983 8182 0.0 0.0 0.0
1984 8108 0.0 0.0 0.0
1985 8718 0.0 0.0 0.0
1986 8515 0.0 0.0 0.0
1987 8465 0.0 0.0 0.0
1988 8328 0.0 0.0 0.0
1989 8078 0.0 0.0 0.0
1990 8384 0.0 0.0 0.0
1991 7687 0.0 0.0 0.0
1992 8568 0.0 0.0 0.0
1993 8213 0.0 0.0 0.0
1994 7070 0.0 0.0 0.0
1995 5569 0.0 0.0 0.0
1996 4139 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0

For data sources see[5]

References