X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1096070611000

Well Details

Well ID: 1096070611000
Loading map...
Location: 00/11-06-109-07W6/0
Location Alias: 00/11-06-09-07 W6M
Location Alias 2: 00/11-06-109-07 W6/00
Country: Canada
Province: Alberta
Township: 109
Meridian: 6
Range: 07
Section: 06
County/Municipality: Mackenzie County
Well Name: HUSKY MOBIL RAINBOW 11-6-109-7
Operator Name: Husky Oil Operations Limited
License Number: 0031219
License Date: 1966-11-03
License Status: Issued
Spud Date: 1966-11-12
Final Drill Date: 1967-01-03
Well Total Depth: 1861.10 m
Surface Hole Latitude: 58.437032
Surface Hole Longitude: -119.160699

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-11-03 Obtained License
1966-12-11 Drill Stem Test Performed
1966-12-19 Liner Casing Operation Performed
1967-01-03 Finished Drilling
1967-01-04 Perforation Treatment Performed - Open-Hole Completion
1967-06-16 Well Mode changed to Drilled and Cased
1968-08-01 Well Began Injection
1968-08-01 Well Fluid changed to Gas
1968-08-01 Well Type changed to Injection
1972-11-01 Perforation Treatment Performed - Open-Hole Completion
1972-11-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-11-10 Well Began Production
1972-11-10 Well Fluid changed to Crude Oil
1972-11-10 Well Mode changed to Flowing
1985-10-23 Tie-Back Casing Operation Performed
1986-12-13 Liner Casing Operation Performed
1986-12-13 Perforation Treatment Performed - Cement Squeeze
1986-12-16 Perforation Treatment Performed - Jet Perforation
1986-12-17 Perforation Treatment Performed - Remedial Casing
1986-12-24 Perforation Treatment Performed - Jet Perforation
1989-11-17 Perforation Treatment Performed - Cement Squeeze
1989-11-19 Perforation Treatment Performed - Jet Perforation
1991-07-26 Perforation Treatment Performed - Jet Perforation
1991-07-27 Perforation Treatment Performed - Jet Perforation
1991-07-31 Perforation Treatment Performed - Jet Perforation
1991-08-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-01-08 Well Fluid changed to Crude Oil
1992-01-08 Well Mode changed to Flowing
1995-01-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-01-17 Plug Back Performed
1995-01-17 Well Fluid changed to Crude Oil
1995-01-17 Well Mode changed to Abandoned Zone
1995-01-19 Perforation Treatment Performed - Jet Perforation
1995-01-19 Well Log Performed
1995-01-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-05-26 Perforation Treatment Performed - Jet Perforation
1997-05-27 Perforation Treatment Performed - Jet Perforation
1997-05-27 Well Log Performed
1997-05-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-06-09 Well Log Performed
2002-06-05 Perforation Treatment Performed - Cement Squeeze
2002-06-06 Perforation Treatment Performed - Cement Squeeze
2002-06-06 Plug Back Performed
2002-06-07 Well Log Performed
2002-06-19 Perforation Treatment Performed - Jet Perforation
2002-06-19 Perforation Treatment Performed - Open-Hole Completion
2002-06-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-06-20 Well Log Performed
2002-06-21 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-06-21 Perforation Treatment Performed - Jet Perforation
2002-06-21 Well Log Performed
2002-06-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-06-22 Well Log Performed
2002-07-18 Well Fluid changed to Crude Oil
2002-07-18 Well Mode changed to Flowing
2011-02-02 Well Fluid changed to Crude Oil
2011-02-02 Well Mode changed to Suspended
2011-06-06 Well Log Performed
2011-06-09 Well Log Performed
2011-06-10 Perforation Treatment Performed - Jet Perforation
2011-06-10 Well Log Performed
2011-06-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-06-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-06-12 Perforation Treatment Performed - Cement Plug
2011-06-14 Perforation Treatment Performed - Jet Perforation
2011-06-14 Well Log Performed
2011-06-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-06-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-06-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-11-15 Perforation Treatment Performed - Chemical Squeeze

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-01-04 Open Hole/Barefoot Completion 1748.90 1807.80 0
1989-11-19 Perforation 1813.00 1814.00 19
1989-11-19 Perforation 1817.00 1819.00 19
1991-07-26 Perforation 1817.00 1819.00 20
1991-07-27 Perforation 1802.00 1805.00 20
1991-07-31 Perforation 1769.50 1772.50 20
1991-08-01 Acid Treatment 1769.50 1772.50 0
1995-01-17 Packing Device Capped w/Cement 1786.00 1794.00 0
1995-01-19 Perforation 1670.00 1674.70 20
1995-01-22 Acid Treatment 1670.00 1674.70 0
1997-05-26 Perforation 1802.00 1805.00 20
1972-11-01 Open Hole/Barefoot Completion 1748.90 1861.10 0
1997-05-26 Perforation 1813.00 1814.00 20
1997-05-26 Perforation 1817.00 1819.00 20
1997-05-27 Perforation 1795.70 1798.20 20
1997-05-28 Acid Treatment 1769.50 1819.00 0
2002-06-05 Cement Squeeze 1769.50 1772.50 0
2002-06-06 Cement Squeeze 1802.00 1819.00 0
2002-06-06 Cement Squeeze 1670.00 1674.70 0
2002-06-19 Perforation 1830.00 1833.00 13
2002-06-19 Perforation 1836.70 1839.80 13
2002-06-19 Perforation 1844.60 1847.70 13
1972-11-04 Acid Treatment 1829.40 1861.10 0
2002-06-19 Open Hole/Barefoot Completion 1852.30 1861.00 0
2002-06-20 Acid Treatment 1830.00 1847.70 0
2002-06-21 Acid Treatment 1852.30 1861.00 0
2002-06-21 Perforation 1770.00 1772.50 13
2002-06-22 Acid Treatment 1770.00 1772.50 0
2011-06-10 Perforation 1740.00 1742.50 20
2011-06-11 Acid Treatment 1740.00 1742.50 0
2011-06-12 Acid Treatment 1740.00 1742.50 0
2011-06-12 Cement Plug 1746.50 1749.50 0
2011-06-14 Perforation 1714.00 1717.50 20
1986-12-13 Cement Squeeze 1748.90 1861.10 0
2011-06-14 Perforation 1707.00 1710.00 20
2011-06-14 Perforation 1728.50 1731.00 20
2011-06-14 Perforation 1725.50 1726.00 20
2011-06-15 Acid Treatment 1725.50 1726.00 0
2011-06-15 Acid Treatment 1728.50 1731.00 0
2011-06-16 Acid Treatment 1707.00 1710.00 0
2011-06-16 Acid Treatment 1714.00 1717.50 0
2011-06-17 Acid Treatment 1707.00 1710.50 0
2011-06-17 Acid Treatment 1714.00 1717.50 0
2013-11-15 Chemical Squeeze 1728.50 1731.00 0
1986-12-16 Perforation 1746.00 1748.00 14
2013-11-15 Chemical Squeeze 1725.50 1726.00 0
2013-11-15 Chemical Squeeze 1714.00 1717.50 0
2013-11-15 Chemical Squeeze 1707.00 1710.00 0
1986-12-17 Remedial Casing Cementing 1746.00 1748.00 0
1986-12-24 Perforation 1822.00 1823.90 13
1986-12-24 Perforation 1826.40 1829.40 13
1989-11-17 Cement Squeeze 1822.00 1829.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 1103 0.0 0.0 0.0
1973 7429 0.0 0.0 0.0
1974 7743 0.0 0.0 0.0
1975 7135 0.0 0.0 0.0
1976 7889 0.0 0.0 0.0
1977 7868 0.0 0.0 0.0
1978 5417 0.0 0.0 0.0
1979 7967 0.0 0.0 0.0
1980 8294 0.0 0.0 0.0
1981 8026 0.0 0.0 0.0
1982 8159 0.0 0.0 0.0
1983 8666 0.0 0.0 0.0
1984 7789 0.0 0.0 0.0
1985 7110 0.0 0.0 0.0
1986 5108 0.0 0.0 0.0
1987 8450 0.0 0.0 0.0
1988 8134 0.0 0.0 0.0
1989 5105 0.0 0.0 0.0
1990 5510 0.0 0.0 0.0
1991 2884 0.0 0.0 0.0
2002 2254 0.0 0.0 0.0
2003 815 0.0 0.0 0.0
2004 1002 0.0 0.0 0.0
2005 96 0.0 0.0 0.0
2006 356 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-11-18 No Incident Encountered 0.00 0.00

For data sources see[6]

References