X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1096070610022

Well Details

Well ID: 1096070610022
Loading map...
Location: 02/10-06-109-07W6/2
Location Alias: 02/10-06-09-07 W6M
Location Alias 2: 02/10-06-109-07 W6/02
Country: Canada
Province: Alberta
Township: 109
Meridian: 6
Range: 07
Section: 06
County/Municipality: Mackenzie County
Well Name: HUSKY MOBIL RAINBOW 10-6-109-7
Operator Name: Husky Oil Operations Limited
License Number: 0194572
License Date: 1996-12-04
License Status: Suspension
Spud Date: 1996-12-09
Final Drill Date: 1996-12-25
Well Total Depth: 1915.00 m
Surface Hole Latitude: 58.435303
Surface Hole Longitude: -119.156804

For data sources see[1][2]

Well History

Date Event
1996-12-04 Obtained License
1996-12-11 Surface Casing Operation Performed
1996-12-15 Kick Occurred
1996-12-16 Kick Occurred
1996-12-18 Kick Occurred
1996-12-18 Well Log Performed
1996-12-21 Intermediate Casing Operation Performed
1996-12-23 Lost Circulation Occurred
1996-12-24 Kick Occurred
1996-12-25 Finished Drilling
1996-12-25 Well Log Performed
1996-12-25 Well Mode changed to Drilled and Cased
1996-12-27 Lost Circulation Occurred
1996-12-28 Plug Back Performed
1996-12-30 Liner Casing Operation Performed
1996-12-31 Rig Released
1997-01-07 Well Log Performed
1997-01-08 Perforation Treatment Performed - Jet Perforation
1997-01-08 Well Log Performed
1997-01-10 Perforation Treatment Performed - Remedial Casing
1997-01-10 Well Log Performed
1997-01-13 Well Log Performed
1997-01-18 Perforation Treatment Performed - Abrasa-Jet Perforation
1997-01-19 Perforation Treatment Performed - Abrasa-Jet Perforation
1997-01-20 Perforation Treatment Performed - Abrasa-Jet Perforation
1997-01-22 Well Log Performed
1997-01-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-01-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-01-29 Well Log Performed
2001-12-11 Perforation Treatment Performed - Jet Perforation
2001-12-11 Well Log Performed
2001-12-16 Well Log Performed
2001-12-18 Well Log Performed
2002-01-04 Perforation Treatment Performed - Jet Perforation
2002-01-04 Well Log Performed
2002-01-08 Well Log Performed
2002-01-14 Well Log Performed
2003-06-17 Well Log Performed
2006-10-07 Well Log Performed
2009-06-01 Well Log Performed
2012-06-27 Well Log Performed
2013-02-02 Well Log Performed
2013-02-05 Perforation Treatment Performed - Cement Squeeze
2013-02-15 Well Log Performed
2013-02-17 Well Log Performed
2013-02-18 Perforation Treatment Performed - Jet Perforation
2013-02-18 Well Log Performed
2013-02-19 Perforation Treatment Performed - Jet Perforation
2013-02-19 Well Log Performed
2013-02-21 Perforation Treatment Performed - Cement Squeeze
2013-02-26 Perforation Treatment Performed - Jet Perforation
2013-02-26 Well Log Performed
2013-02-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-03-02 Well Log Performed
2013-03-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-03-04 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-03-08 Perforation Treatment Performed - Jet Perforation
2013-03-08 Well Log Performed
2013-03-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2013-09-25 Well Began Production
2013-09-25 Well Fluid changed to Crude Oil
2013-09-25 Well Mode changed to Pumping
2018-05-13 Well Fluid changed to Crude Oil
2018-05-13 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-01-08 Perforation 1820.50 1821.50 13
1997-01-20 Hydra Jet Perforation 1806.00 1807.50 0
1997-01-20 Hydra Jet Perforation 1800.00 1801.50 0
1997-01-20 Hydra Jet Perforation 1790.00 1791.00 0
1997-01-23 Acid Treatment 1790.00 1830.50 0
1997-01-27 Acid Treatment 1822.20 1830.50 0
2001-12-11 Perforation 1816.00 1818.00 13
2001-12-11 Perforation 1836.50 1838.50 13
2001-12-11 Perforation 1842.50 1844.00 13
2002-01-04 Perforation 1760.00 1766.00 13
2002-01-04 Perforation 1767.50 1769.50 13
1997-01-08 Perforation 1810.50 1811.50 13
2013-02-05 Cement Squeeze 1760.00 1766.00 0
2013-02-05 Cement Squeeze 1767.50 1769.50 0
2013-02-18 Perforation 1747.50 1750.00 13
2013-02-18 Perforation 1744.00 1745.00 13
2013-02-18 Perforation 1739.00 1740.00 13
2013-02-18 Perforation 1737.00 1738.00 13
2013-02-18 Perforation 1726.50 1729.00 13
2013-02-18 Perforation 1724.00 1725.00 13
2013-02-19 Perforation 1705.00 1707.50 13
2013-02-21 Cement Squeeze 1747.50 1750.00 0
1997-01-08 Perforation 1756.00 1757.00 13
2013-02-21 Cement Squeeze 1744.00 1745.00 0
2013-02-21 Cement Squeeze 1739.00 1740.00 0
2013-02-21 Cement Squeeze 1737.00 1738.00 0
2013-02-21 Cement Squeeze 1726.50 1729.00 0
2013-02-21 Cement Squeeze 1724.00 1725.00 0
2013-02-26 Perforation 1747.50 1750.00 13
2013-02-26 Perforation 1744.00 1745.00 13
2013-02-26 Perforation 1739.00 1740.00 13
2013-02-26 Perforation 1737.00 1738.00 13
2013-02-26 Perforation 1726.50 1729.00 13
1997-01-10 Remedial Casing Cementing 1756.00 1821.50 0
2013-02-26 Perforation 1724.00 1725.00 13
2013-02-27 Acid Treatment 1747.50 1750.00 0
2013-02-27 Acid Treatment 1744.00 1745.00 0
2013-02-27 Acid Treatment 1739.00 1740.00 0
2013-02-27 Acid Treatment 1737.00 1738.00 0
2013-03-03 Acid Treatment 1726.50 1729.00 0
2013-03-03 Acid Treatment 1724.00 1725.00 0
2013-03-04 Acid Treatment 1726.50 1729.00 0
2013-03-04 Acid Treatment 1724.00 1725.00 0
2013-03-08 Perforation 1714.00 1715.00 13
1997-01-18 Hydra Jet Perforation 1829.00 1830.50 0
2013-03-08 Perforation 1712.00 1713.00 13
2013-03-08 Perforation 1705.00 1707.50 13
2013-03-08 Perforation 1694.00 1695.00 13
2013-03-08 Perforation 1690.00 1691.00 13
2013-03-09 Acid Treatment 1714.00 1715.00 0
2013-03-09 Acid Treatment 1712.00 1713.00 0
2013-03-09 Acid Treatment 1705.00 1707.50 0
1997-01-18 Hydra Jet Perforation 1822.00 1823.50 0
1997-01-18 Hydra Jet Perforation 1815.00 1816.50 0
1997-01-19 Hydra Jet Perforation 1810.50 1811.50 0
1997-01-19 Hydra Jet Perforation 1806.00 1807.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 2287 0.0 0.0 0.0
2014 7294 0.0 0.0 0.0
2015 7758 0.0 0.0 0.0
2016 4270 0.0 0.0 0.0
2017 3381 0.0 0.0 0.0
2018 412 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1996-12-15 Kick 1709.00 1709.00
1996-12-16 Kick 1756.00 1756.00
1996-12-18 Kick 1756.00 1756.00
1996-12-23 Lost Circulation 1815.80 1890.00
1996-12-24 Kick 1890.00 1890.00
1996-12-27 Lost Circulation 1915.00 1915.00
2013-03-14 No Incident Encountered 0.00 0.00

For data sources see[6]

References