1096070510003

Well Details

Well ID: 1096070510003
Loading map...
Location: 00/10-05-109-07W6/3
Location Alias: 00/10-05-09-07 W6M
Location Alias 2: 00/10-05-109-07 W6/03
Country: Canada
Province: Alberta
Township: 109
Meridian: 6
Range: 07
Section: 05
County/Municipality: Mackenzie County
Well Name: HUSKY MOBIL RAINBOW 10-5-109-7
Operator Name: Husky Oil Operations Limited
License Number: 0030305
License Date: 1966-04-05
License Status: Suspension
Spud Date: 1966-04-05
Final Drill Date: 1966-05-26
Well Total Depth: 2016.30 m
Surface Hole Latitude: 58.436764
Surface Hole Longitude: -119.126459

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-04-05 Obtained License
1966-04-28 Lost Circulation Occurred
1966-05-05 Drill Stem Test Performed
1966-05-06 Drill Stem Test Performed
1966-05-08 Lost Circulation Occurred
1966-05-26 Finished Drilling
1966-05-26 Well Mode changed to Drilled and Cased
1966-05-28 Drill Stem Test Performed
1966-05-29 Liner Casing Operation Performed
1966-06-12 Perforation Treatment Performed - Jet Perforation
1966-06-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-06-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-03-23 Perforation Treatment Performed - Cement Squeeze
1978-03-24 Perforation Treatment Performed - Cement Squeeze
1978-03-29 Well Log Performed
1978-03-30 Perforation Treatment Performed - Jet Perforation
1978-04-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-03-27 Perforation Treatment Performed - Jet Perforation
1984-03-31 Perforation Treatment Performed - Cement Squeeze
1984-04-04 Perforation Treatment Performed - Jet Perforation
1984-04-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-07-25 Perforation Treatment Performed - Cement Squeeze
1986-07-29 Perforation Treatment Performed - Jet Perforation
1986-08-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-03-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-03-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-06-10 Perforation Treatment Performed - Cement Squeeze
1991-06-13 Perforation Treatment Performed - Jet Perforation
1991-06-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-06-15 Perforation Treatment Performed - Cement Squeeze
1991-06-18 Perforation Treatment Performed - Jet Perforation
1991-06-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-06-21 Perforation Treatment Performed - Jet Perforation
1991-06-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-06-26 Perforation Treatment Performed - Jet Perforation
1994-08-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-08-25 Well Log Performed
1994-08-26 Well Log Performed
1994-08-28 Well Log Performed
1994-08-29 Well Log Performed
1994-08-30 Well Log Performed
1994-08-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-08-31 Well Log Performed
1994-09-01 Perforation Treatment Performed - Jet Perforation
1994-09-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-09-10 Well Log Performed
1994-09-11 Perforation Treatment Performed - Jet Perforation
1994-09-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-09-17 Well Log Performed
1994-09-19 Perforation Treatment Performed - Cement Squeeze
1994-09-24 Well Log Performed
1994-09-26 Perforation Treatment Performed - Abrasa-Jet Perforation
1994-09-29 Perforation Treatment Performed - Abrasa-Jet Perforation
1994-10-01 Perforation Treatment Performed - Abrasa-Jet Perforation
1994-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-10-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-10-20 Well Began Production
1994-10-20 Well Fluid changed to Crude Oil
1994-10-20 Well Mode changed to Flowing
1997-01-15 Perforation Treatment Performed - Chemical Squeeze
1997-10-01 Well Fluid changed to Crude Oil
1997-10-01 Well Mode changed to Suspended
1998-03-29 Perforation Treatment Performed - Jet Perforation
1998-03-29 Well Log Performed
1998-03-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-04-26 Well Log Performed
1999-05-16 Well Log Performed
1999-05-31 Well Log Performed
1999-06-02 Well Log Performed
2001-11-13 Well Log Performed
2001-11-20 Well Log Performed
2001-11-22 Well Log Performed
2003-10-10 Well Log Performed
2006-10-03 Well Log Performed
2009-06-01 Well Log Performed
2012-06-24 Well Log Performed
2014-05-08 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-06-12 Perforation 1873.00 1876.00 7
1984-03-27 Perforation 1817.50 1820.50 13
1984-03-31 Cement Squeeze 1817.50 1820.50 0
1984-04-04 Perforation 1828.50 1831.50 13
1984-04-06 Acid Treatment 1828.50 1831.50 0
1986-07-25 Cement Squeeze 1822.00 1831.50 0
1986-07-29 Perforation 1828.50 1829.90 13
1986-07-29 Perforation 1822.00 1825.00 13
1986-08-02 Acid Treatment 1822.00 1825.00 0
1989-03-01 Acid Treatment 1822.00 1825.00 0
1989-03-02 Acid Treatment 1822.00 1825.00 0
1966-06-13 Acid Treatment 1873.00 1876.00 0
1991-06-10 Cement Squeeze 1822.00 1829.90 0
1991-06-13 Perforation 1822.00 1825.00 13
1991-06-13 Perforation 1828.50 1829.90 13
1991-06-14 Acid Treatment 1828.50 1829.90 0
1991-06-15 Cement Squeeze 1822.00 1829.90 0
1991-06-18 Perforation 1822.00 1824.00 13
1991-06-18 Perforation 1828.50 1829.50 13
1991-06-20 Acid Treatment 1822.00 1829.50 0
1991-06-21 Perforation 1772.50 1774.50 13
1991-06-22 Acid Treatment 1822.00 1824.00 0
1966-06-15 Acid Treatment 1873.00 1876.00 0
1991-06-22 Acid Treatment 1772.50 1774.50 0
1991-06-26 Perforation 1809.00 1811.00 13
1994-08-24 Acid Treatment 1772.50 1829.90 0
1994-08-31 Packing Device Capped w/Cement 1793.00 1801.00 0
1994-08-31 Packing Device Capped w/Cement 1757.00 1760.00 0
1994-09-01 Perforation 1682.50 1683.50 13
1994-09-01 Perforation 1685.50 1688.50 13
1994-09-01 Perforation 1691.00 1693.00 13
1994-09-01 Perforation 1696.50 1706.00 13
1994-09-01 Perforation 1710.00 1719.00 13
1978-03-23 Cement Squeeze 1873.00 1876.00 0
1994-09-09 Acid Treatment 1710.00 1719.00 0
1994-09-11 Perforation 1664.20 1667.30 13
1994-09-12 Acid Treatment 1664.20 1667.30 0
1994-09-19 Cement Squeeze 1682.50 1719.00 0
1994-09-26 Hydra Jet Perforation 1716.50 1719.50 0
1994-09-26 Hydra Jet Perforation 1709.20 1710.20 0
1994-09-26 Hydra Jet Perforation 1710.70 1712.20 0
1994-09-26 Hydra Jet Perforation 1703.40 1705.30 0
1994-09-26 Hydra Jet Perforation 1704.90 1706.80 0
1994-09-29 Hydra Jet Perforation 1709.20 1712.20 0
1978-03-24 Cement Squeeze 1873.00 1876.00 0
1994-09-29 Hydra Jet Perforation 1703.10 1705.30 0
1994-09-29 Hydra Jet Perforation 1704.60 1706.80 0
1994-10-01 Hydra Jet Perforation 1690.60 1693.60 0
1994-10-01 Hydra Jet Perforation 1695.80 1698.80 0
1994-10-04 Acid Treatment 1690.60 1719.50 0
1994-10-05 Acid Treatment 1690.60 1693.60 0
1997-01-15 Chemical Squeeze 1772.50 1774.50 0
1998-03-29 Perforation 1763.00 1767.00 13
1998-03-29 Perforation 1756.00 1759.00 13
1998-03-30 Acid Treatment 1756.00 1774.50 0
1978-03-30 Perforation 1834.30 1837.90 7
1978-03-30 Perforation 1839.80 1844.00 7
1978-04-01 Acid Treatment 1834.30 1844.00 0
1984-03-27 Perforation 1822.00 1825.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 1450 0.0 0.0 0.0
1995 2859 0.0 0.0 0.0
1996 1757 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1966-04-28 Lost Circulation 1676.40 1694.60
1966-05-08 Lost Circulation 1809.90 1809.90

For data sources see[6]