If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 1096070510002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":58.436764,"lon":-119.126459,"icon":""}]} |
Location: 00/10-05-109-07W6/2 | |
Location Alias: 00/10-05-09-07 W6M | |
Location Alias 2: 00/10-05-109-07 W6/02 | |
Country: Canada | |
Province: Alberta | |
Township: 109 | |
Meridian: 6 | |
Range: 07 | |
Section: 05 | |
County/Municipality: Mackenzie County | |
Well Name: HUSKY MOBIL RAINBOW 10-5-109-7 | |
Operator Name: Husky Oil Operations Limited | |
License Number: 0030305 | |
License Date: 1966-04-05 | |
License Status: Suspension | |
Spud Date: 1966-04-05 | |
Final Drill Date: 1966-05-26 | |
Well Total Depth: 2016.30 m | |
Surface Hole Latitude: 58.436764 | |
Surface Hole Longitude: -119.126459 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1966-04-05 | Obtained License |
1966-04-28 | Lost Circulation Occurred |
1966-05-05 | Drill Stem Test Performed |
1966-05-06 | Drill Stem Test Performed |
1966-05-08 | Lost Circulation Occurred |
1966-05-26 | Finished Drilling |
1966-05-26 | Well Mode changed to Drilled and Cased |
1966-05-28 | Drill Stem Test Performed |
1966-05-29 | Liner Casing Operation Performed |
1966-06-12 | Perforation Treatment Performed - Jet Perforation |
1966-06-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1966-06-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1978-03-23 | Perforation Treatment Performed - Cement Squeeze |
1978-03-24 | Perforation Treatment Performed - Cement Squeeze |
1978-03-29 | Well Log Performed |
1978-03-30 | Perforation Treatment Performed - Jet Perforation |
1978-04-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1984-03-27 | Perforation Treatment Performed - Jet Perforation |
1984-03-31 | Perforation Treatment Performed - Cement Squeeze |
1984-04-04 | Perforation Treatment Performed - Jet Perforation |
1984-04-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-07-25 | Perforation Treatment Performed - Cement Squeeze |
1986-07-29 | Perforation Treatment Performed - Jet Perforation |
1986-08-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-03-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-03-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1991-06-10 | Perforation Treatment Performed - Cement Squeeze |
1991-06-13 | Perforation Treatment Performed - Jet Perforation |
1991-06-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1991-06-15 | Perforation Treatment Performed - Cement Squeeze |
1991-06-18 | Perforation Treatment Performed - Jet Perforation |
1991-06-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1991-06-21 | Perforation Treatment Performed - Jet Perforation |
1991-06-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1991-06-26 | Perforation Treatment Performed - Jet Perforation |
1991-07-18 | Well Began Injection |
1991-07-18 | Well Fluid changed to Gas |
1991-07-18 | Well Type changed to Injection |
1994-08-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-08-25 | Well Log Performed |
1994-08-26 | Well Log Performed |
1994-08-28 | Well Log Performed |
1994-08-29 | Well Log Performed |
1994-08-30 | Well Log Performed |
1994-08-31 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-08-31 | Well Log Performed |
1994-09-01 | Perforation Treatment Performed - Jet Perforation |
1994-09-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-09-10 | Well Log Performed |
1994-09-11 | Perforation Treatment Performed - Jet Perforation |
1994-09-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-09-17 | Well Log Performed |
1994-09-19 | Perforation Treatment Performed - Cement Squeeze |
1994-09-24 | Well Log Performed |
1994-09-26 | Perforation Treatment Performed - Abrasa-Jet Perforation |
1994-09-29 | Perforation Treatment Performed - Abrasa-Jet Perforation |
1994-10-01 | Perforation Treatment Performed - Abrasa-Jet Perforation |
1994-10-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-10-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-10-20 | Well Fluid changed to Gas |
1994-10-20 | Well Type changed to Injection |
1997-01-15 | Perforation Treatment Performed - Chemical Squeeze |
1998-03-29 | Perforation Treatment Performed - Jet Perforation |
1998-03-29 | Well Log Performed |
1998-03-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-04-26 | Well Log Performed |
1999-05-16 | Well Log Performed |
1999-05-31 | Well Log Performed |
1999-06-02 | Well Log Performed |
2001-11-13 | Well Log Performed |
2001-11-20 | Well Log Performed |
2001-11-22 | Well Log Performed |
2003-10-10 | Well Log Performed |
2006-10-03 | Well Log Performed |
2009-06-01 | Well Log Performed |
2012-06-24 | Well Log Performed |
2014-05-08 | Well Log Performed |
2016-12-21 | Well Fluid changed to Gas |
2016-12-21 | Well Mode changed to Suspended |
2016-12-21 | Well Type changed to Injection |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1966-06-12 | Perforation | 1873.00 | 1876.00 | 7 |
1984-03-27 | Perforation | 1817.50 | 1820.50 | 13 |
1984-03-31 | Cement Squeeze | 1817.50 | 1820.50 | 0 |
1984-04-04 | Perforation | 1828.50 | 1831.50 | 13 |
1984-04-06 | Acid Treatment | 1828.50 | 1831.50 | 0 |
1986-07-25 | Cement Squeeze | 1822.00 | 1831.50 | 0 |
1986-07-29 | Perforation | 1828.50 | 1829.90 | 13 |
1986-07-29 | Perforation | 1822.00 | 1825.00 | 13 |
1986-08-02 | Acid Treatment | 1822.00 | 1825.00 | 0 |
1989-03-01 | Acid Treatment | 1822.00 | 1825.00 | 0 |
1989-03-02 | Acid Treatment | 1822.00 | 1825.00 | 0 |
1966-06-13 | Acid Treatment | 1873.00 | 1876.00 | 0 |
1991-06-10 | Cement Squeeze | 1822.00 | 1829.90 | 0 |
1991-06-13 | Perforation | 1822.00 | 1825.00 | 13 |
1991-06-13 | Perforation | 1828.50 | 1829.90 | 13 |
1991-06-14 | Acid Treatment | 1828.50 | 1829.90 | 0 |
1991-06-15 | Cement Squeeze | 1822.00 | 1829.90 | 0 |
1991-06-18 | Perforation | 1822.00 | 1824.00 | 13 |
1991-06-18 | Perforation | 1828.50 | 1829.50 | 13 |
1991-06-20 | Acid Treatment | 1822.00 | 1829.50 | 0 |
1991-06-21 | Perforation | 1772.50 | 1774.50 | 13 |
1991-06-22 | Acid Treatment | 1822.00 | 1824.00 | 0 |
1966-06-15 | Acid Treatment | 1873.00 | 1876.00 | 0 |
1991-06-22 | Acid Treatment | 1772.50 | 1774.50 | 0 |
1991-06-26 | Perforation | 1809.00 | 1811.00 | 13 |
1994-08-24 | Acid Treatment | 1772.50 | 1829.90 | 0 |
1994-08-31 | Packing Device Capped w/Cement | 1793.00 | 1801.00 | 0 |
1994-08-31 | Packing Device Capped w/Cement | 1757.00 | 1760.00 | 0 |
1994-09-01 | Perforation | 1682.50 | 1683.50 | 13 |
1994-09-01 | Perforation | 1685.50 | 1688.50 | 13 |
1994-09-01 | Perforation | 1691.00 | 1693.00 | 13 |
1994-09-01 | Perforation | 1696.50 | 1706.00 | 13 |
1994-09-01 | Perforation | 1710.00 | 1719.00 | 13 |
1978-03-23 | Cement Squeeze | 1873.00 | 1876.00 | 0 |
1994-09-09 | Acid Treatment | 1710.00 | 1719.00 | 0 |
1994-09-11 | Perforation | 1664.20 | 1667.30 | 13 |
1994-09-12 | Acid Treatment | 1664.20 | 1667.30 | 0 |
1994-09-19 | Cement Squeeze | 1682.50 | 1719.00 | 0 |
1994-09-26 | Hydra Jet Perforation | 1716.50 | 1719.50 | 0 |
1994-09-26 | Hydra Jet Perforation | 1709.20 | 1710.20 | 0 |
1994-09-26 | Hydra Jet Perforation | 1710.70 | 1712.20 | 0 |
1994-09-26 | Hydra Jet Perforation | 1703.40 | 1705.30 | 0 |
1994-09-26 | Hydra Jet Perforation | 1704.90 | 1706.80 | 0 |
1994-09-29 | Hydra Jet Perforation | 1709.20 | 1712.20 | 0 |
1978-03-24 | Cement Squeeze | 1873.00 | 1876.00 | 0 |
1994-09-29 | Hydra Jet Perforation | 1703.10 | 1705.30 | 0 |
1994-09-29 | Hydra Jet Perforation | 1704.60 | 1706.80 | 0 |
1994-10-01 | Hydra Jet Perforation | 1690.60 | 1693.60 | 0 |
1994-10-01 | Hydra Jet Perforation | 1695.80 | 1698.80 | 0 |
1994-10-04 | Acid Treatment | 1690.60 | 1719.50 | 0 |
1994-10-05 | Acid Treatment | 1690.60 | 1693.60 | 0 |
1997-01-15 | Chemical Squeeze | 1772.50 | 1774.50 | 0 |
1998-03-29 | Perforation | 1763.00 | 1767.00 | 13 |
1998-03-29 | Perforation | 1756.00 | 1759.00 | 13 |
1998-03-30 | Acid Treatment | 1756.00 | 1774.50 | 0 |
1978-03-30 | Perforation | 1834.30 | 1837.90 | 7 |
1978-03-30 | Perforation | 1839.80 | 1844.00 | 7 |
1978-04-01 | Acid Treatment | 1834.30 | 1844.00 | 0 |
1984-03-27 | Perforation | 1822.00 | 1825.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1991 | 0 | 0.0 | 0.0 | 0.0 |
1992 | 0 | 0.0 | 0.0 | 0.0 |
1993 | 0 | 0.0 | 0.0 | 0.0 |
1994 | 0 | 0.0 | 0.0 | 0.0 |
1995 | 0 | 0.0 | 0.0 | 0.0 |
1996 | 0 | 0.0 | 0.0 | 0.0 |
1997 | 0 | 0.0 | 0.0 | 0.0 |
1998 | 0 | 0.0 | 0.0 | 0.0 |
1999 | 0 | 0.0 | 0.0 | 0.0 |
2000 | 0 | 0.0 | 0.0 | 0.0 |
2001 | 0 | 0.0 | 0.0 | 0.0 |
2002 | 0 | 0.0 | 0.0 | 0.0 |
2003 | 0 | 0.0 | 0.0 | 0.0 |
2004 | 0 | 0.0 | 0.0 | 0.0 |
2005 | 0 | 0.0 | 0.0 | 0.0 |
2006 | 0 | 0.0 | 0.0 | 0.0 |
2007 | 0 | 0.0 | 0.0 | 0.0 |
2008 | 0 | 0.0 | 0.0 | 0.0 |
2009 | 0 | 0.0 | 0.0 | 0.0 |
2010 | 0 | 0.0 | 0.0 | 0.0 |
2011 | 0 | 0.0 | 0.0 | 0.0 |
2012 | 0 | 0.0 | 0.0 | 0.0 |
2013 | 0 | 0.0 | 0.0 | 0.0 |
2014 | 0 | 0.0 | 0.0 | 0.0 |
2015 | 0 | 0.0 | 0.0 | 0.0 |
2016 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1966-04-28 | Lost Circulation | 1676.40 | 1694.60 |
1966-05-08 | Lost Circulation | 1809.90 | 1809.90 |
For data sources see[6]