If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 1096070501002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":58.429362,"lon":-119.119836,"icon":""}]} |
Location: 00/01-05-109-07W6/2 | |
Location Alias: 00/01-05-09-07 W6M | |
Location Alias 2: 00/01-05-109-07 W6/02 | |
Country: Canada | |
Province: Alberta | |
Township: 109 | |
Meridian: 6 | |
Range: 07 | |
Section: 05 | |
County/Municipality: Mackenzie County | |
Well Name: HUSKY ET AL RAINBOW 1-5-109-7 | |
Operator Name: Husky Oil Operations Limited | |
License Number: 0099460 | |
License Date: 1982-12-01 | |
License Status: Suspension | |
Spud Date: 1982-12-18 | |
Final Drill Date: 1983-01-24 | |
Well Total Depth: 1948.00 m | |
Surface Hole Latitude: 58.429362 | |
Surface Hole Longitude: -119.119836 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1982-12-01 | Obtained License |
1982-12-20 | Lost Circulation Occurred |
1983-01-06 | Lost Circulation Occurred |
1983-01-13 | Drill Stem Test Performed |
1983-01-16 | Drill Stem Test Performed |
1983-01-20 | Drill Stem Test Performed |
1983-01-21 | Lost Circulation Occurred |
1983-01-24 | Finished Drilling |
1983-01-24 | Well Mode changed to Drilled and Cased |
1983-01-26 | Drill Stem Test Performed |
1983-01-27 | Drill Stem Test Performed |
1983-01-29 | Liner Casing Operation Performed |
1983-02-09 | Perforation Treatment Performed - Jet Perforation |
1983-02-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1983-08-02 | Perforation Treatment Performed - Cement Squeeze |
1983-08-08 | Perforation Treatment Performed - Jet Perforation |
1983-08-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1983-08-13 | Perforation Treatment Performed - Jet Perforation |
1983-08-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1985-08-12 | Perforation Treatment Performed - Cement Squeeze |
1985-08-12 | Plug Back Performed |
1985-08-15 | Perforation Treatment Performed - Jet Perforation |
1985-08-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1985-08-18 | Perforation Treatment Performed - Jet Perforation |
1986-04-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1986-04-04 | Perforation Treatment Performed - Jet Perforation |
1986-04-05 | Perforation Treatment Performed - Acid Wash - No Pressure |
1986-04-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-04-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-04-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-04-17 | Perforation Treatment Performed - Jet Perforation |
1986-04-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-04-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-05-09 | Well Began Production |
1986-05-09 | Well Fluid changed to Crude Oil |
1986-05-09 | Well Mode changed to Pumping |
1990-04-03 | Perforation Treatment Performed - Jet Perforation |
1990-04-04 | Perforation Treatment Performed - Chemical Squeeze |
1990-04-06 | Perforation Treatment Performed - Jet Perforation |
1990-04-06 | Well Fluid changed to Crude Oil |
1990-04-06 | Well Mode changed to Suspended |
1990-04-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1997-01-16 | Perforation Treatment Performed - Chemical Squeeze |
1997-09-08 | Perforation Treatment Performed - Jet Perforation |
1997-09-08 | Well Log Performed |
1997-09-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1997-09-12 | Well Log Performed |
2002-03-08 | Well Log Performed |
2006-10-10 | Well Log Performed |
2009-05-27 | Well Log Performed |
2014-05-04 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1983-02-09 | Perforation | 1847.00 | 1853.00 | 13 |
1985-08-18 | Perforation | 1836.50 | 1839.00 | 13 |
1985-08-18 | Acid Treatment | 1836.50 | 1842.00 | 0 |
1986-04-02 | Packing Device Capped w/Cement | 1826.40 | 1829.40 | 0 |
1986-04-04 | Perforation | 1746.50 | 1749.50 | 13 |
1986-04-04 | Perforation | 1736.00 | 1738.50 | 13 |
1986-04-04 | Perforation | 1733.00 | 1736.00 | 13 |
1986-04-04 | Perforation | 1715.50 | 1716.50 | 13 |
1986-04-04 | Perforation | 1696.50 | 1698.00 | 13 |
1986-04-05 | Acid Wash | 1696.50 | 1749.50 | 0 |
1986-04-06 | Acid Treatment | 1746.50 | 1749.50 | 0 |
1983-02-10 | Acid Treatment | 1847.00 | 1853.00 | 0 |
1986-04-10 | Acid Treatment | 1696.50 | 1749.50 | 0 |
1986-04-15 | Acid Treatment | 1696.50 | 1716.50 | 0 |
1986-04-17 | Perforation | 1700.00 | 1703.00 | 13 |
1986-04-18 | Acid Treatment | 1715.50 | 1716.50 | 0 |
1986-04-19 | Acid Treatment | 1715.50 | 1716.50 | 0 |
1990-04-03 | Perforation | 1836.50 | 1842.00 | 13 |
1990-04-04 | Chemical Squeeze | 1836.50 | 1842.00 | 0 |
1990-04-06 | Perforation | 1821.00 | 1824.00 | 13 |
1990-04-07 | Acid Treatment | 1821.00 | 1824.00 | 0 |
1997-01-16 | Chemical Squeeze | 1821.00 | 1824.00 | 0 |
1983-08-02 | Cement Squeeze | 1847.00 | 1853.00 | 0 |
1997-09-08 | Perforation | 1847.00 | 1851.00 | 13 |
1997-09-08 | Perforation | 1827.00 | 1830.00 | 13 |
1997-09-10 | Acid Treatment | 1821.00 | 1865.00 | 0 |
1983-08-08 | Perforation | 1861.00 | 1865.00 | 13 |
1983-08-10 | Acid Treatment | 1861.00 | 1865.00 | 0 |
1983-08-13 | Perforation | 1835.00 | 1838.00 | 13 |
1983-08-15 | Acid Treatment | 1835.00 | 1838.00 | 0 |
1985-08-12 | Cement Squeeze | 1835.00 | 1838.00 | 0 |
1985-08-15 | Perforation | 1839.00 | 1842.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1986 | 2986 | 0.0 | 0.0 | 0.0 |
1987 | 2211 | 0.0 | 0.0 | 0.0 |
1988 | 1432 | 0.0 | 0.0 | 0.0 |
1989 | 1511 | 0.0 | 0.0 | 0.0 |
1990 | 503 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1982-12-20 | Lost Circulation | 196.00 | 196.00 |
1983-01-06 | Lost Circulation | 1676.00 | 1676.00 |
1983-01-21 | Lost Circulation | 1811.00 | 1822.00 |
For data sources see[6]