If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 1096062905000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":58.489593,"lon":-118.972659,"icon":""}]} |
Location: 00/05-29-109-06W6/0 | |
Location Alias: 00/05-29-09-06 W6M | |
Location Alias 2: 00/05-29-109-06 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 109 | |
Meridian: 6 | |
Range: 06 | |
Section: 29 | |
County/Municipality: Mackenzie County | |
Well Name: MOBIL RAIN 5-29-109-6 | |
Operator Name: ExxonMobil Canada Ltd. | |
License Number: 0132241 | |
License Date: 1988-02-15 | |
License Status: Abandoned | |
Spud Date: 1988-02-22 | |
Final Drill Date: 1988-03-06 | |
Well Total Depth: 1733.00 m | |
Surface Hole Latitude: 58.489593 | |
Surface Hole Longitude: -118.972659 |
Date | Event |
---|---|
1988-02-15 | Obtained License |
1988-02-24 | Surface Casing Operation Performed |
1988-03-06 | Finished Drilling |
1988-03-06 | Lost Circulation Occurred |
1988-03-06 | Well Mode changed to Drilled and Cased |
1988-03-07 | Well Log Performed |
1988-03-08 | Drill Stem Test Performed |
1988-03-10 | Production Casing Operation Performed |
1988-03-10 | Rig Released |
1988-03-21 | Perforation Treatment Performed - Jet Perforation |
1988-03-21 | Well Log Performed |
1988-03-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-03-31 | Perforation Treatment Performed - Jet Perforation |
1988-03-31 | Well Log Performed |
1988-04-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-04-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-04-04 | Well Log Performed |
1988-04-05 | Perforation Treatment Performed - Jet Perforation |
1988-04-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-04-07 | Well Log Performed |
1988-05-15 | Well Began Production |
1988-05-15 | Well Fluid changed to Crude Oil |
1988-05-15 | Well Mode changed to Flowing |
1988-08-03 | Well Fluid changed to Crude Oil |
1988-08-03 | Well Mode changed to Pumping |
1990-12-15 | Perforation Treatment Performed - Jet Perforation |
1990-12-15 | Well Log Performed |
1990-12-16 | Well Log Performed |
1990-12-17 | Perforation Treatment Performed - Cement Squeeze |
1990-12-17 | Well Log Performed |
1991-01-09 | Perforation Treatment Performed - Jet Perforation |
1991-01-09 | Well Log Performed |
1991-01-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-04-01 | Well Fluid changed to Crude Oil |
1993-04-01 | Well Mode changed to Suspended |
1995-10-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1995-10-25 | Plug Back Performed |
1995-10-25 | Well Fluid changed to Crude Oil |
1995-10-25 | Well Mode changed to Abandoned Zone |
1995-10-26 | Perforation Treatment Performed - Jet Perforation |
1995-10-26 | Perforation Treatment Performed - Remedial Casing |
1996-07-20 | Well Log Performed |
1996-07-21 | Perforation Treatment Performed - Jet Perforation |
1996-07-21 | Well Log Performed |
1996-07-22 | Perforation Treatment Performed - Remedial Casing |
2000-09-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2000-09-09 | Perforation Treatment Performed - Jet Perforation |
2000-09-09 | Perforation Treatment Performed - Remedial Casing |
2000-09-09 | Well Log Performed |
2000-09-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2000-09-10 | Perforation Treatment Performed - Jet Perforation |
2000-09-10 | Perforation Treatment Performed - Remedial Casing |
2000-10-26 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1988-03-21 | Perforation | 1684.50 | 1687.50 | 13 |
1988-04-02 | Acid Treatment | 1620.50 | 1644.00 | 0 |
1988-04-03 | Acid Treatment | 1620.50 | 1644.00 | 0 |
1988-04-05 | Perforation | 1650.50 | 1652.00 | 13 |
1988-04-06 | Acid Treatment | 1650.50 | 1652.00 | 0 |
1990-12-15 | Perforation | 1689.20 | 1689.50 | 13 |
1990-12-17 | Cement Squeeze | 1684.50 | 1689.50 | 0 |
1991-01-09 | Perforation | 1684.40 | 1686.00 | 13 |
1991-01-10 | Acid Treatment | 1684.40 | 1686.00 | 0 |
1995-10-25 | Packing Device Capped w/Cement | 1672.00 | 1680.00 | 0 |
1995-10-25 | Packing Device Capped w/Cement | 1607.00 | 1615.00 | 0 |
1988-03-22 | Acid Treatment | 1684.50 | 1687.50 | 0 |
1995-10-26 | Perforation | 555.00 | 556.00 | 14 |
1995-10-26 | Remedial Casing Cementing | 555.00 | 556.00 | 0 |
1996-07-21 | Perforation | 355.00 | 356.00 | 13 |
1996-07-22 | Remedial Casing Cementing | 355.00 | 356.00 | 0 |
2000-09-09 | Perforation | 556.00 | 557.00 | 20 |
2000-09-09 | Remedial Casing Cementing | 556.00 | 557.00 | 0 |
2000-09-09 | Packing Device Capped w/Cement | 520.00 | 550.00 | 0 |
2000-09-10 | Perforation | 388.00 | 389.00 | 20 |
2000-09-10 | Remedial Casing Cementing | 388.00 | 389.00 | 0 |
2000-09-10 | Packing Device Capped w/Cement | 350.00 | 385.00 | 0 |
1988-03-31 | Perforation | 1638.00 | 1639.50 | 13 |
1988-03-31 | Perforation | 1643.00 | 1644.00 | 13 |
1988-03-31 | Perforation | 1628.00 | 1630.00 | 13 |
1988-03-31 | Perforation | 1631.00 | 1632.00 | 13 |
1988-03-31 | Perforation | 1633.00 | 1634.00 | 13 |
1988-03-31 | Perforation | 1620.50 | 1622.00 | 13 |
1988-03-31 | Perforation | 1626.00 | 1627.00 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1988 | 3092 | 0.0 | 0.0 | 0.0 |
1989 | 7314 | 0.0 | 0.0 | 0.0 |
1990 | 7424 | 0.0 | 0.0 | 0.0 |
1991 | 8198 | 0.0 | 0.0 | 0.0 |
1992 | 8342 | 0.0 | 0.0 | 0.0 |
1993 | 1498 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1988-03-06 | Lost Circulation | 1733.00 | 1733.00 |
For data sources see[6]