X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1096062904000

Well Details

Well ID: 1096062904000
Loading map...
Location: 00/04-29-109-06W6/0
Location Alias: 00/04-29-09-06 W6M
Location Alias 2: 00/04-29-109-06 W6/00
Country: Canada
Province: Alberta
Township: 109
Meridian: 6
Range: 06
Section: 29
County/Municipality: Mackenzie County
Well Name: ITERATION RAINBOW 4-29-109-6
Operator Name: Chinook Energy Inc.
License Number: 0299553
License Date: 2003-12-19
License Status: Suspension
Spud Date: 2004-01-06
Final Drill Date: 2004-01-19
Well Total Depth: 1710.00 m
Surface Hole Latitude: 58.486100
Surface Hole Longitude: -118.970794

For data sources see[1][2]

Well History

Date Event
2003-12-19 Obtained License
2004-01-09 Surface Casing Operation Performed
2004-01-16 Well Log Performed
2004-01-17 Intermediate Casing Operation Performed
2004-01-19 Finished Drilling
2004-01-19 Well Log Performed
2004-01-19 Well Mode changed to Drilled and Cased
2004-01-20 Drill Stem Test Performed
2004-01-20 Well Log Performed
2004-01-21 Liner Casing Operation Performed
2004-01-22 Rig Released
2004-02-15 Perforation Treatment Performed - Jet Perforation
2004-02-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2020-02-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-02-21 Perforation Treatment Performed - Cement Squeeze
2020-02-21 Plug Back Performed
2020-02-21 Well Mode changed to Abandoned Zone
2020-02-24 Perforation Treatment Performed - Jet Perforation
2020-02-25 Perforation Treatment Performed - Jet Perforation
2020-02-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2020-02-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-02-27 Perforation Treatment Performed - Remedial Casing
2020-03-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-03-01 Perforation Treatment Performed - Jet Perforation
2020-03-02 Perforation Treatment Performed - Remedial Casing
2020-03-03 Perforation Treatment Performed - Jet Perforation
2020-03-03 Perforation Treatment Performed - Remedial Casing
2020-03-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-03-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-03-12 Perforation Treatment Performed - Jet Perforation
2020-03-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-03-13 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-02-15 Perforation 1689.00 1693.00 17
2020-02-27 Packing Device Capped w/Cement 1642.00 1650.00 0
2020-03-01 Packing Device Capped w/Cement 1532.00 1540.00 0
2020-03-01 Perforation 556.00 558.00 20
2020-03-01 Perforation 556.00 558.00 17
2020-03-02 Remedial Casing Cementing 556.00 558.00 0
2020-03-03 Perforation 387.00 389.00 20
2020-03-03 Perforation 387.00 389.00 17
2020-03-03 Remedial Casing Cementing 387.00 389.00 0
2020-03-09 Packing Device Capped w/Cement 541.00 550.00 0
2020-03-10 Packing Device Capped w/Cement 372.50 382.00 0
2004-02-17 Acid Treatment 1689.00 1693.00 0
2020-03-12 Perforation 307.00 309.00 20
2020-03-12 Perforation 307.00 309.00 17
2020-03-13 Remedial Casing Cementing 307.00 309.00 0
2020-03-13 Packing Device Capped w/Cement 296.50 306.00 0
2020-02-21 Cement Squeeze 1689.00 1693.00 0
2020-02-21 Packing Device Capped w/Cement 1661.00 1680.00 0
2020-02-24 Perforation 1654.00 1656.00 20
2020-02-24 Perforation 1654.00 1656.00 17
2020-02-25 Perforation 1657.00 1659.00 20
2020-02-26 Acid Treatment 1654.00 1659.00 0
2020-02-27 Remedial Casing Cementing 1654.00 1659.00 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-03-14 No Incident Encountered 0.00 0.00

For data sources see[5]

References