X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

1096060810002

Well Details

Well ID: 1096060810002
Loading map...
Location: 00/10-08-109-06W6/2
Location Alias: 00/10-08-09-06 W6M
Location Alias 2: 00/10-08-109-06 W6/02
Country: Canada
Province: Alberta
Township: 109
Meridian: 6
Range: 06
Section: 08
County/Municipality: Mackenzie County
Well Name: HUSKY RAINBOW 10-8-109-6
Operator Name: Husky Oil Operations Limited
License Number: 0032188
License Date: 1967-05-31
License Status: Abandoned
Spud Date: 1967-06-11
Final Drill Date: 1967-07-13
Well Total Depth: 1981.20 m
Surface Hole Latitude: 58.450898
Surface Hole Longitude: -118.957227

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-05-31 Obtained License
1967-07-06 Drill Stem Test Performed
1967-07-13 Finished Drilling
1967-07-13 Well Mode changed to Drilled and Cased
1967-07-15 Liner Casing Operation Performed
1967-07-23 Perforation Treatment Performed - Jet Perforation
1967-07-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-07-26 Perforation Treatment Performed - Cement Squeeze
1967-07-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-07-27 Perforation Treatment Performed - Jet Perforation
1967-07-28 Perforation Treatment Performed - Cement Squeeze
1967-07-30 Perforation Treatment Performed - Jet Perforation
1968-06-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-06-03 Perforation Treatment Performed - Jet Perforation
1968-06-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-07-15 Well Began Injection
1968-07-15 Well Fluid changed to Water
1968-07-15 Well Type changed to Injection
1973-05-25 Perforation Treatment Performed - Jet Perforation
1981-04-28 Well Log Performed
2010-06-01 Well Fluid changed to Water
2010-06-01 Well Mode changed to Suspended
2010-06-01 Well Type changed to Injection
2013-02-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-02-25 Plug Back Performed
2013-02-25 Well Log Performed
2013-02-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-02-26 Plug Back Performed
2013-02-26 Well Log Performed
2013-02-27 Perforation Treatment Performed - Jet Perforation
2013-02-27 Well Log Performed
2013-02-28 Perforation Treatment Performed - Remedial Casing
2013-03-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-03-01 Plug Back Performed
2013-03-01 Well Fluid changed to Water
2013-03-01 Well Mode changed to Abandoned Zone
2013-03-01 Well Type changed to Injection
2013-03-02 Perforation Treatment Performed - Jet Perforation
2013-03-02 Well Log Performed
2013-03-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-03-03 Perforation Treatment Performed - Remedial Casing
2013-03-03 Plug Back Performed
2013-03-11 Well Abandoned
2013-03-11 Well Fluid changed to Water
2013-03-11 Well Mode changed to Abandoned
2013-03-11 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1967-07-23 Perforation 1899.20 1901.00 7
1968-06-21 Acid Treatment 1809.00 1813.90 0
1973-05-25 Perforation 1805.60 1811.70 7
2013-02-25 Packing Device Capped w/Cement 1790.00 1798.00 0
2013-02-26 Packing Device Capped w/Cement 1682.50 1691.00 0
2013-02-27 Perforation 601.00 604.00 17
2013-02-28 Remedial Casing Cementing 601.00 604.00 0
2013-03-01 Packing Device Capped w/Cement 589.80 597.80 0
2013-03-02 Perforation 417.00 420.00 17
2013-03-03 Remedial Casing Cementing 417.00 420.00 0
2013-03-03 Packing Device Capped w/Cement 401.30 409.30 0
1967-07-25 Acid Treatment 1899.20 1901.00 0
1967-07-26 Cement Squeeze 1899.20 1901.00 0
1967-07-27 Perforation 1870.30 1875.10 7
1967-07-27 Acid Treatment 1870.30 1875.10 0
1967-07-28 Cement Squeeze 1870.30 1875.10 0
1967-07-30 Perforation 1809.00 1813.90 7
1968-06-03 Perforation 1870.30 1875.10 7
1968-06-03 Acid Treatment 1870.30 1875.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-03-05 No Incident Encountered 0.00 0.00

For data sources see[6]

References